道路區段長度 的英文怎麼說

中文拼音 [dàoduànzhǎng]
道路區段長度 英文
block length
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 區名詞(姓氏) a surname
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 道路 : road; way; path
  • 長度 : length; longitude; size; extent; footage
  1. In 2002 the supreme court ordered the andaman and nicobar government to close the 129 - km 80 - mile stretch of the atr passing through the jarawa reserve. but the road remains open

    早在2002年,印最高法院就命令安達曼和尼克巴地方政府關閉安達曼幹中穿過加洛瓦保護的一129公里約80英里的公
  2. China marine oil spill contingency plan is now in the process of improvement. the inland waterway oil spill is another important area remain to be explored in term of increasing accident rate and booming shipping amount in yang tzi river. the need for inland waterway oil spill contingency plan is imperative. at strategic level, this paper compares several existing oil spill risk analysis methods including " historical date analysis " and " comparative risk indexes ", pointing out limitation of them, and then apply the " comparative risk indexes " approach to " river segment " spill risk analysis, developing " river segment oil spill comparative risk assessment framework " this paper also take new approach to collision and grounding in river by stochastic modeling tanker traffic in narrow waterway

    本文在內河溢油反應戰略規劃層次上,分析現有的溢油風險評估方法,包括歷史數據統計法和比較風險評估法,指出相關方法的適用性和局限性;基於江下游水採用「」和「河」雙層評估的思,提出「江下遊河比較溢油風險評估模式」 ;將馬爾科夫狀態轉移的思想應用到船舶運動描述中,從隨機過程角分析船舶在水中的運行和事故發生,得出船舶事故概率計算模型。
分享友人