  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次樁施工工藝的檢測和樁身質量及承力的檢,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承表明了荷與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷和破壞機理、承力特性,進行了富有成果的現場測工作;數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承力也較設計;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  2. Analysis based on a large amount of data about the load - settlement, pile soil stress ratio and stress distribution obtained from the model tests shows that in the horizontal - vertical multiple reinforcing system, the horizontal reinforcing function of the geocell reinforced gravel mattress, the vertical reinforcing function of the gravel pile, the system of load transfer and supporting formed through interaction and working together mechanism between gravel pile composite foundation and geocell reinforced gravel mattress are the main mechanism of its load capacity improvement, settlement and asymmetrical settlement reduction

    結果分析表明:在土工格室碎石墊層碎石樁復合地基這一水平向豎向多元復合地基共同作用的固體系中,結合了土工格室碎石墊層的水平向強體作用和碎石樁的豎向強體作用;土工格室碎石墊層和碎石樁復合地基相互作用,共同工作構成的荷和支撐體系是其提高承力,減少沉降和差異沉降的主要機理。
  3. Experimental results show that the new cfrt - column to steel - beam joints proposed in this paper possess good earthquake resistant capacity. the infilled concrete benefit to restrain the buckling deformation of column webs, increase the strength and stiffness of the joint. the lengthened stiffener can transfer much more beam moment, make the strength of the joint increased

    表明,在保證焊接質量的前提下,本文提出的新型方鋼管混凝土柱?鋼梁的節點具有良好的抗震性能;內填混凝土有利於抑制柱腹板的屈曲變形,節點的承力和剛度;勁肋長度的有利於傳梁端彎矩,使節點的承力提高。
  4. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量及工程費用等。本文通過現場、理論計算和有限單元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。