邊刨 的英文怎麼說

中文拼音 [biānbào]
邊刨 英文
rabbet plane; edge plane; side plane邊刨機 side planing machine
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : 刨動詞1 (挖掘) dig; excavate 2 [口語] (除去; 減去) deduct; exclude; minus: 15天刨去5天 只剩下...
  1. Distracted hens in coops occupied spots where formerly stood chairs supporting sedate agriculturists. the chimney - corner and once blazing hearth was now filled with inverted beehives, in which the hens laid their eggs ; while out of doors the plots that each succeeding householder had carefully shaped with his spade were torn by the cocks in wildest fashion

    在壁爐煙囪的墻角和曾經火光熊熊的壁爐旁,現在堆滿了倒扣過來的蜂窩,變成了母雞下蛋的雞窩門外的一塊塊園畦,從前每一塊都叫房主拿著鐵鍬拾掇得整整,現在都讓公雞用最野蠻的方式得亂七八糟。
  2. The edge of the board has been beveled with a plane

    木板的已用成斜角。
  3. The edges of the board have been beveled with a plane

    木板的已用成斜角。
  4. Automatic copy shaper double heads with splash guar

    自動仿型機雙軸
  5. It is made up of the melting shaft furnace, titled holding furnace, ( reverberatory refining furnace ), casting machine, automatic shearer, cast bar straightening and dege shaving machine, rolling mill, engine oil lubrication system, emulsion lubrication system, rod orbital coiler, line electric control, etc

    銅桿連鑄連軋機生產線主要有融化豎爐,傾動式保溫爐, (銅精煉反射爐) ,連鑄機,滾剪機,校直機,打毛機,連軋機,潤滑油系統,乳化液系統,銅桿還原冷卻裝置,雙筐梅花收桿機和電氣控制系統等組成。
  6. Our factory started manufacturing pressure - container in 1986. we have all the necessary equipment for manufacturing, such as press of 155t, polishing - edge, windingboard, sheering - board machine, aut - welding machine, and processing equipments

    1986年開始生產壓力容器,擁有生產壓力容器必須的設備;如1500t壓機,機,卷板機,剪板機及自動焊設備、加工設備。
  7. Grinding work piece : such as disc disc, stationary disc, dresser, planer tool, pulverizer disc and etc

    研磨工件:如切片刀文具刀片修刀粉碎機刀片等等刀具。
  8. Rivet welding : 805000mm folder, 1200t oil press, 12t edge planner, 620m - 250mm digital controlled cutting, 70mm didital controlled pipe bender, max elevating capacity is 160t

    鉚焊: 805000mm卷扳機1200t油壓機12m機620m - 250mm數控切割機70mm數控彎管機最大起重能力160t 。
  9. Sizes of specimens are the same as those in practical engineering project. the lipped channel section is used as wall studs and its space is 500 millimeter. the wall sheathings are screwed on cold - formed steel studs, with 12mm gypsum board on one side and 9 mm oriented strand board ( osb ) on another side

    試件的立柱骨架為間距為500mm的c型卷槽鋼,兩側墻面板分別是12mm厚的石膏板和9mm厚的osb定向花板,墻面板與立柱骨架用自鉆自攻螺釘連接。
  10. Mechanical shear components, the need for edge processing, shaving its capacity of not less than 2. 0 mm

    氣割或機械剪切的零件,需要進行緣加工時,其削量不應少於2 . 0 ?
  11. Firstly, the material, which have already been chosen and cut, are dressed and polished by high - precision jointing machine and planer, and the jointing surface of material should be smooth, so that workers can joint the materials

    首先,要將選切好的毛料在高精度的修機、料機上分別進行修光處理,要將木料的拼合面處理至平整光滑后,才能進行拼合。
  12. Standard for safety for hand - held motor - operated electric tools - safety - part 2 - 19 : particular requirements for jointers

    手持式電動工具的安全標準.安全.第2 - 19部分:機的特殊要求
分享友人