部分加載 的英文怎麼說
中文拼音 [bùfēnjiāzǎi]
部分加載
英文
partial loading- 部 : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
- 分 : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
- 載 : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
- 部分 : (整體中的局部或個體) part; section; portion
-
In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test
然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。Engine load simulated control system was consisted of two unattached parts of work resistance simulated control subsystem and electric bow wave dynamometer control subsystem. with the mathematic models of engine load simulation controller, which transferred the work resistance ' s change to engine load change immediately, the system can met the need of the simulation control system
發動機負荷模擬加載控制系統包括彼此獨立的作業阻力模擬控制子系統和電渦流測功機控制子系統兩部分,應用發動機負荷模擬控制器數學模型,使作業阻力的變化及時轉換為發動機負荷的變化,能夠滿足模擬系統的控制要求。The solicitation, development and rupture of craze in exiguous hierarchy play a connective work in the course of polymer ' s damage and rupture. it is a bridge in distortion mechanism of macroscopical and microcosmic
大部分高聚物的力學性能依賴于溫度、持荷時間、加載速率和環境等因素,其中,溫度和時間的依賴性尤為顯著。Lattice towers and masts - code of practice for loading code of practice for loading
格子形塔架和桅桿.第1部分:加載實用規程Lattice towers and masts - guide to the background and use of part 1 ' code of practice for loading '
格子形塔架和桅桿.第2部分:第1部分"加載實用規程"背景與使用指南Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures, the bending moment of frame side beams and the top, the bending moment of secondary beams, the difference between the tie - beam, plane - frame analysis and the space analysis on the path of conduct force, ect. it can be used as a reference when probing these problems
文摘:討論了在多項高層建築結構分析中垂直荷載加載模式的選擇,框架邊梁和次梁端部的彎矩計算,連梁問題和平面框架分析與空間分析在傳力路徑上的差別以及單片剪力墻平面外彎矩等問題,可供同類結構內力分析時參考Choose two nodes on the edge of the structural to compare the results calculating by the finite element program midas, then we can draw a conclusion that these kinds of space truss systems is sensitive to the libration of the dynamic wind loads. to consider this factor is very necessary in the process of design, we will use the pulsant augmentation coefficient to realize it
比較靜力風荷載和動力風荷載作用下的有限元軟體的計算結果,選取結構邊緣部分的兩個節點,對比它們在兩種方法計算下的最大位移的計算結果。經過比較可以看出重量輕、頻率低、阻尼小的柔性建築物對風荷載的橫向振動是很敏感的,在進行工程設計時應該考慮這種因素,並可採用乘以風振系數等相應方法來加以體現。2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads
2 )設計吊桿式拱架支承結構時,各部分構件應當均勻對稱布置。另外,還應注意頭道梁拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心受壓狀態給結構配筋設計增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震荷載分佈均勻一些。In this test, a special bolt - jack is used to exent of prestressing force to brace angles as the whole structure is under dead - load. in this state brace angles withstand partly load before twice - load and the stress and strain of concrete are decreased. in this way the aim of removal of load and strengthening can be reached
本試驗中採用專用螺栓千斤頂在恆定荷載水平下對混凝土柱角鋼撐桿施加預壓應力,使外包角鋼在二次受力前即分擔部分荷載,使混凝土應力水平和應變水平降低,達到卸載與加固同步進行的目的。Woodworking machines ; loose moulding spindles, sizes
木材加工機械.第1部分:空載模壓主軸尺寸Three - phase oil - immersed distribution transformers 50 hz, from 50 to 2500 kva with highest voltage for equipment not exceeding 36 kv. part 4 : determination of the power rating of a transformer loaded with non - sinusoidal currents
最高電壓不超過36 kv的設備用50 hz 50至2500 kva三相油浸配電變壓器.第4部分:加載非正弦電流的變壓器功率額定值的測定Equipment for commercial kitchens - mobile equipment - part 5 : heated serving trolleys for banquets
大型烹飪設備.車載烹飪設備.第5部分:加熱宴會車Full - range of loading to the reinforced concrete columns with reinforced concrete cover during second stage of loading is analyzed by computer - test nonlinear developed in the text, in consideration of the condition that they are not unloaded or partly unloaded. based on the analysis, a simplified method is put forward in the paper to calculate the load capacity of cross - section of axially and eccentrically compressive rc columns with reinforced concrete cover. a theoretical calculation method is given to the practical engineering
本文針對實際工程中經常採用的外包鋼筋混凝土加固鋼筋混凝土柱的加固方法,考慮到實際加固工程是在不卸載或部分卸載情況下進行,利用計算機對外包鋼筋混凝土加固柱二次受力后進行非線性全過程分析,在此基礎上提出外包鋼筋混凝土加固柱軸心受壓和偏心受壓正截面承載力的簡化計算公式,為實際工程中外包鋼筋混凝土加固柱的結構設計提供了理論計算方法。If at some point a problem occurs with the weather control so that it cannot be loaded during a specific request, and yet the rest of the page does load successfully, the custom personalization data that a user has saved for that control would be lost the next time the personalization data for the page is saved
如果天氣控制項在某些時候出現問題,以致無法在特定請求過程中加載,而頁的其餘部分加載成功,用戶已為該控制項保存的自定義個性化設置數據在下次保存該頁的個性化設置數據時則會丟失。An option provided for most load and store instructions is to update the base register in other words, ra with the data s effective address generated by the instruction
用指令生成的數據有效地址來更新基址寄存器(也就是ra )是大部分加載和存儲指令的一個可選項。It is a question of secondary loading because of unloading part of loads before adhering cfrp. in this paper, simulated it successfully in element birth and death
由於在碳纖維布加固鋼筋混凝土結構的施工過程中是先卸去部分荷載,再粘貼碳纖維布,這就存在二次受力。Class to load the managed portion of the host into the default domain
方法,將宿主的託管部分加載到默認域中。The host sets its application domain manager, loads it into the default application domain, and obtains a pointer to its interface by calling
要轉換為託管代碼,宿主必須獲取指向默認應用程序域的指針,然後將宿主的託管部分加載到該域中。Choose the default unless you know better. now sit back while debian - installer detects some of your hardware, and loads the rest of itself from cd, floppy, usb, etc
這時debian - installer會偵測您的一部分硬體,並從cd軟驅usb或其它設備里把它的其餘部分加載進系統。Parallel connections are preferred because if the resistance of one or more elements increases, its portion of the load will be reduced and the group will remain in balance
通常採用並聯電路,因為如果增加一個或者多個電阻阻值,部分負載可以減少並且可以保持平衡。分享友人