部分負載 的英文怎麼說
中文拼音 [bùfēnfùzǎi]
部分負載
英文
fractional load- 部 : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
- 分 : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
- 負 : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
- 載 : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
- 部分 : (整體中的局部或個體) part; section; portion
- 負載 : [電學] load
-
Dtu 43 - 4. building works. private contracts. roofs made of load - bearing wood and wood product panels with waterproof coverings. part 2 : special clauses
Dtu 43 - 4 .建築工程.專門合同.帶防水覆蓋物的木板和負載支撐木屋頂.第2部分:特殊條款Engine load simulated control system was consisted of two unattached parts of work resistance simulated control subsystem and electric bow wave dynamometer control subsystem. with the mathematic models of engine load simulation controller, which transferred the work resistance ' s change to engine load change immediately, the system can met the need of the simulation control system
發動機負荷模擬加載控制系統包括彼此獨立的作業阻力模擬控制子系統和電渦流測功機控制子系統兩部分,應用發動機負荷模擬控制器數學模型,使作業阻力的變化及時轉換為發動機負荷的變化,能夠滿足模擬系統的控制要求。It is considered that trade name is an essential part of the name of commercial subject, and important indicia for distinguishing products or services of commercial subjects and bearing their business reputation
筆者認為,商號是商事主體名稱的重要組成部分,是區分商事主體商品或服務,並負載其商業信譽的重要標識。Methods of test for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couple test
圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定Methods of test for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test
圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定Methods of test for ancillary components for masonry - part 7 : determination of shear load capacity and load displacement characteristics of shear ties and slip ties couplet test for mortar joint connections
圬工輔助成份試驗方法.第7部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定The rocket ship is divided into two parts, the payload part and the fuel-exhaust part.
把火箭飛行器分為兩部分:有效負載部分和燃料排出部分。Eurocode 1 : actions on structures - part 2 : traffic loads on bridges ; german version en 1991 - 2 : 2003
歐洲法規1 :對結構的作用.第2部分:橋上交通負載This dissertation focus on the load balancing of signaling gateway, mainly inculde two part : in first part, considered trillium dft architecture, the dissertation presents a scheme suited for signaling gateway, involving software design and implement of m3ua distributed module df and mtp3 distibuted module ldf ; the second part presents the design details of m3ua and mtp3 protocol themselves load balancing mechanism. at the end of this dissertation, a performance test result of based on load balancing signaling gateway are given
本文著重於討論信令網關負載均衡設計與實現,主要分為兩個部分進行闡述,第一部分根據trillium分散式系統架構,提出適合大容量信令網關中ss7和m3ua協議負載均衡的解決方案,並詳細給出m3ua協議側分散式模塊df的軟體設計、實現過程; mtp3協議側分散式模塊ldf的軟體設計,模塊劃分,介面定義,流程圖實現;第二部分提出了m3ua和mtp3協議體內的負載均衡解決方案,並詳細介紹了其設計實現。Uncapped partitions are typically reserved for higher priority workloads that can benefit from the extra horsepower available from extra compute capacity when portions of the server are under - utilized
Uncapped分區通常被預留給更高優先級的工作負載,當服務器的某些部分未充分使用時,這些工作負載可以從額外計算能力獲益。Methods of test for ancillary components for masonry - part 3 : determination of shear load capacity of welds in prefabricated bed joint reinforcement
圬工輔助成份試驗方法.第3部分:預制床連接處增強的焊接剪切負載能力測定Load boards ; box pallets, post pallets, principal dimensions and stacking devices
負載板.第1部分:箱式托盤立柱式托盤主要尺寸和堆Electricity metering - data exchange for meter reading, tarif and load control - part 31 : use of local area networks on twisted pair with carrier signalling
電量計.抄表電費和負荷控制的數據交換.第31部分:帶有載波信號傳輸的雙絞線局域網的使用On the other hand, railways are extremely effective at moving large numbers of people between fixed major centres of activity. it is also important to provide a mass carrier for a large sector of the population in major dormitory areas, who cannot afford or choose not to own cars
相反來說,鐵路能夠以極高效率運載大量的乘客往來固定的樞紐,而且在居民密集的市鎮,亦須為大部分負擔不起私家車或不願擁有私家車的居民提供一種集體運輸工具。Adjustable speed electrical power drive systems - part 6 : guide for determination of types of load duty and corresponding current ratings
可調速電力驅動系統.第6部分:負載類型和相應電流額定值的測定指南Cranes - general design - part 2 : load actions ; german version en 13001 - 2 : 2004
起重機.一般設計.第2部分:負載作用Crane safety - general design - part 2 : load effects
起重機安全.一般設計.第2部分:負載效應Discussion on operation mode at part load for an its system with a base chiller
帶基載主機的冰蓄冷系統在部分負荷工況下運行模式的探討Air conditioners, liquid chilling packages and heat pumps with electrically driven compressors for space heating and cooling - testing and rating at part load conditions
對流式供暖和製冷用帶有電動壓縮機的空氣調節器液體製冷包和熱泵.部分負載條件下的檢驗和額定Parallel connections are preferred because if the resistance of one or more elements increases, its portion of the load will be reduced and the group will remain in balance
通常採用並聯電路,因為如果增加一個或者多個電阻阻值,部分負載可以減少並且可以保持平衡。分享友人