配載不當 的英文怎麼說

中文拼音 [pèizǎidāng]
配載不當 英文
improper stowage
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 名詞[書面語] (剁物所用的木墩) a block of wood
  • : 當Ⅰ形容詞(相稱) equal Ⅱ動詞1 (擔任; 充當) work as; serve as; be 2 (承當; 承受) bear; accept...
  1. Thecalculating results show that the composite action between concrete floor and steel beamsgreatly influence the bending bearing capacity and initial rotational stiffness of joints, it shouldbe considered in practical engineer. reinforcement ratio of lengthways reinforcing bar andthe stiffener of web have great influencer on the behavior of connections, while the thicknessof end - plate and degree of shear connection have a litter influence on its behavior

    分析計算結果表明:樓板與鋼梁的組合作用對節點的抗彎承力及初始轉動剛度的影響非常大,實際工程中節點設計應考慮這種組合作用;樓板內縱向鋼筋筋率與柱腹板加勁肋對節點性能影響顯著,而連接端板厚度及剪力連接程度的影響則是太顯著。
  2. The warranty does not cover damages caused by insufficient, incorrect or forceful operation of the product, by failure to observe the operating instructions, by overloading, by the use of materials, consumables or accessories not manufactured by tipper tie or specifically approved in writing by tipper tie for use with the product, by chemical or electrolytic action, by the use of spare parts from an outside source, or by any event of force majeure

    本質量保證含下列所致之損害:的、錯誤的及強制的操作;未遵照操作說明(書) ;設備過;使用非本公司生產或書面認可的材料、耗材及件,搭本公司產品;化學反應或電解反應;使用非本公司的件;或任何可抗力。
  3. Based on vibration principle, the paper establishes dynamics analysis model of output shaft with elastic support, according to fourer series spread principle of periodic function, the dynamic response formula is derived by separating complex vibration force into sum of many simple harmonic excitation function of whole number times frequency relations. the result shows that response of both sides support is synchronous when load distribution non - uniform coefficient is 1

    依據振動理論建立了具有彈性支撐的輸出軸的動力學分析模型,根據周期函數的傅里葉級數展開原理,將復雜的激振力分解成為多個頻率成整倍數關系的簡諧激勵函數,導出了動態響應表達式,結果表明,荷分均勻系數為1 . 0時的輸出軸兩端支撐同步。
  4. With the different loading ratio of parallel to axis and normal to axis direction, damage defects will occur bulking problem. by varying the degree of material anisotropy relative to the loading axis such as poisson ' s ratio and shear modulus, crack growth bulking strain value parallel to or normal to the loading axis is different. the parameters controlling the growth or arrest of the delamination damage are identified as the geometry and the depth of defects and radius of cylindrical etc. at last, it was investigated that the delamination damage is often induced by the tip of matrix damage under higher stress

    研究結果表明:殼體筒段受軸向拉伸和內壓荷作用時,軸向和環向荷的比率同,母層和子層可能發生拉伸屈曲,也可能發生收縮屈曲,或者同時發生拉伸和壓縮屈曲;母層與子層各向異性存在差異,即泊松比與剪切模量時,將使子層板的邊界上承受壓縮和剪切作用,分層達到臨界狀態則發生屈曲,母層與子層的各向異性差異越大,則發生分層屈曲的可能性越大;分層損傷的屈曲應變值與子層自身的彈性模量、分層子層的形狀、厚度以及圓柱半徑等因素有關。
  5. The expansive supply system can be roughly divided into five subsystems : water source, intake, purification, delivery, and distribution. each link is closely connected with another, and requires spare facilities back - up systems so that the functions of current facilities are replaceable should existing facilities become damaged, breaks - down or has to stop operation. this way, there is water to use whenever the faucet is turned on

    然而,自來水生產過程復雜,大的供應體系可概分為水源取水凈水輸水水5大系統,每個環節緊密相扣,而且必須有備用設施備援備系統設施損壞故障,停止運作時,可立即取代其功能,打開水頭才有好水可用。
  6. It is not always good at increased the cement ratio ; sometimes it is even harmed to the strength of the pile. the strength of the pile must matches the strengths of the origin soft foundation. improved fixing methods of strain meter and how to calculate the deformation modulus, the load transfer behavior of cement - soil pile, the compound foundation bearing capacity, pile - soil stress ratio with the increasing of the load are analyzed and studied

    本文通過分析和試驗分析,提出樁間土天然地基承力標準值的取值方法、樁間土承力折減系數取值方法,這和實測結果很接近;並得出提高復合地基置換率是提高復合地基承力有效途徑,並具體比較了單樁復合地基和三樁復合地基提高天然地基的承力的數值,並驗證樁體強度應和天然軟基相匹,指出盲目提高樁體強度是可取的,有時甚至偏於安全,這對于前的建設是很有意義的。
  7. Secondly, we used the dsp assembly language to perform the carrier phase tracking based on a digital processing system. this system is designed according to the idea of software radio. this digital processing system realized the intermediate frequency digitalization. with the diverse configuration of the digital upconverter and digital downconverter in this system, it can carry through many signal modulation modes. and because the carrier phase trac king is performed using software in dsp, it brings great convenience to this system and makes this system available in many digital communication systems

    在該數字處理平臺上可通過加同的軟體對平臺中的數字上下變頻器進行靈活的置以實現同的數字調制解調制度,通過將波的相位跟蹤工作放在dsp軟體中進行帶來了很大的靈活性,能夠適用於前許多種數字通信系統。
  8. Therefore we should study the ecological water requirement, consider the loading ability of water resource, probing into water resource ' s reasonable exploitation degree and configuration. and people ' s activity must be controlled to concern the loading ability of ecosystem, resource and environment. this work should be done without delay and it has attracted the domestic and international common focus

    因此研究生態需水量,充分考慮水資源的承能力,探討水資源的適宜開發強度與合理置,將人類活動控制在生態、資源、環境允許范圍內,是前刻容緩的工作,這項工作已成為國內外共同關注的焦點。
  9. Both of the two sides are rarely mentioned the dynamic process of tecc. in this paper, author no longer focus on the concept researches and the practice analysis in one tourism area. this research associates tecc and tourism planning, apply tecc in tourism planning construction, concerning the tourism activities level with the resources and environment, in order to make them match better and more harmony

    在本項研究中,繼承了已有的關于旅遊環境承力的理論研究結果,再對旅遊環境承力的概念體系進行分析,也再對某一旅遊地進行全面的旅遊環境承力計算,而是將旅遊環境承力的概念與旅遊規劃的內容相結合,將旅遊環境承力的理念融入旅遊規劃設計中,期望在旅遊地的規劃初期就考慮到旅遊活動量與資源、環境的匹程度和協調性。
  10. In this paper the influence of a and p is presented and the methods of calculation are discussed. since there are some deficiencies in the traditional way, the result differs greatly from the practice

    由於傳統的計算荷系數的方法本身存在缺陷,造成、值唯一,而且能考慮樁端下土層的性質,與實際情況存在相大的差距。
  11. After you make sured the loudspeaker, will choose the enlarger, then make can with accuracy start this this loudspeaker. not only the enlarger s power want enough and big, but also the enlarger s electric voltage the electric current characteristic must also load the with loudspeaker to match. 100 w powers lose into the enlarger that a loudspeaker ambition for 8 ws need that enlarger, with 100 it is same that w powers lose into a loudspeaker for 2 ws

    你確定了揚聲器之後,就要選擇放大器,以使能正確地啟動這此揚聲器。僅放大器的功率要足夠大,而且放大器的電壓電流v - 1特性也必須與揚聲器負相匹。 100w功率輸進一個8w的揚聲器志需要的放大器,與100w功率輸進一個2w的揚聲器的放大器是相同的。
  12. After program and data are successfully loaded, all single boards shall be able to run normally, but it is possible that the single board runs abnormally due to causes such as data configuration fault or the single board failure

    程序和數據成功加后,各單板應該可以正常運行,但也可能由於數據置錯誤或單板故障等原因造成單板運行正常。
  13. After program and data are successfully loaded, all single boards should be able to run normally, but it is possible that the single board runs abnormally due to causes such as data configuration fault or the single board failure

    程序和數據成功加后,各單板應該可以正常運行,但也可能由於數據置錯誤或單板故障等原因造成單板運行正常。
  14. 1 debugging of hardware running when programs and data are uploaded successfully, all the single boards can run normally, but may cannot run normally because of data collocation errors, single board defaults or other defaults

    1硬體運行調試程序和數據成功加后,各單板應該可以正常運行,但也可能由於數據置錯誤或單板故障等原因造成單板運行正常。
分享友人