重疊時間 的英文怎麼說

中文拼音 [zhòngdiěshíjiān]
重疊時間 英文
clip overlap
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 重疊 : 1 (一層層堆積) one on top of another; overlapping 2 [電學] [計算機] overlap; overlay; superimpo...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. The baptism service and the fireside meeting times overlap

    洗禮會和爐邊會的
  2. You enter lead time as a negative value

    前置重疊時間應為負數值。
  3. You can fine - tune task links - and make sure you do n ' t gum up the clockwork - by using lag time and lead time

    使用「前置重疊時間」和「延隔」調整任務鏈接,並且確保那些鐘表裝置不會粘上油漆。
  4. By using lead and lag time, you can make your schedule more accurate, and you may be able to shorten it as well

    使用重疊時間和延隔后,日程將更加準確,同也可能縮短日程。
  5. Other factors may include, but not be limited to, work contours, task calendars, lead and lag time, and task constraints

    其他因素還包括工分佈、任務日歷、前置重疊時間和延隔以及任務限制(但不局限於此) 。
  6. Red revert time is the minimum amount of time a phase or overlap must display a red indication following a yellow indication before displaying another green indication

    好象是「一個相位或重疊時間內黃燈信號后顯示另一個綠燈信號前必須顯示紅燈信號的最短。 」
  7. If the value of the long time delay current, the short time delay current and the instantaneous tripping current overlays, the priority order of operating time is the instantaneous tripping the short time tripping the long time tripping

    如果長延、短延和瞬脫扣電流整定值,動作優先次序為:瞬脫扣短延脫扣長延脫扣。
  8. Thin lines are used to draw the outlines of superposition cuts. when it overlaps the outlines of the view, the outlines must be drawn completely

    其輪廓線用細實線繪制,當視圖中的輪廓線與合斷面輪廓線,視圖中的輪廓線仍然應連續畫出不可斷。
  9. For example, if a task can start when its predecessor is half finished, you can specify a finish - to - start dependency with a lead time of 50 % for the successor task

    譬如,如果一個任務在其前置任務完成一半可開始,則可以為其指定完成-開始相關性,且后續任務的前置重疊時間為50 % 。
  10. To add lead or lag time

    如果要添加前置重疊時間或延隔
  11. Use minute, hour, day, week, or month for the lead or lag time units

    前置重疊時間或延隔的單位可以是分、小、工作日、周或月。
  12. You can express lead or lag time as units of time or as a percentage of the predecessor task ' s duration

    可以使用單位或前置任務工期的百分比來表示前置重疊時間或延隔
  13. After you enter tasks and assign dependencies to them, analyze your schedule and look for instances where you can apply lead or lag time

    輸入任務並指定相關性后,應分析日程並查找需要應用前置重疊時間和延隔的情況。
  14. The time gap, or delay, between tasks is called lag time

    使用microsoftproject ,可以在任意兩個鏈接任務添加前置重疊時間或延隔
  15. With lead time, you can overlap two tasks so that a successor task starts before the predecessor task finishes

    使用前置重疊時間可以將兩任務,從而後續任務將在前置任務完成之前開始。
  16. If a predecessor task ends up overlapping the constrained task, a resource assigned to both tasks might be overloaded with work on the overlapping days

    如果前置任務最終與受條件限制的任務發生,則同分配給這兩個任務的資源在任務將過度分配。
  17. Tasks that have a start - to - start link and tasks with lead time are two kinds of tasks that can have overlap time

    具有重疊時間的兩種任務是:具有開始-開始類型鏈接的任務、帶有前置重疊時間的任務。
  18. After you ' ve linked the tasks, however, you can change the link to a start - to - start, finish - to - finish, or start - to - finish link

    不過,在鏈接任務后,可以將鏈接更改為開始-開始、結束-結束或開始-結束鏈接(也可以指定前置重疊時間和延隔) 。
  19. An overlap between tasks that have a dependency.

    相關任務重疊時間
  20. Type lead time as a negative number or as a negative completion percentage

    前置重疊時間應鍵入一個負數或負的百分比。