鉆孔勘探 的英文怎麼說

中文拼音 [zhēnkǒngkāntàn]
鉆孔勘探 英文
drilling exploration
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  1. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個, 250個井,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實驗室試驗,以及對屯門公路上現有的公路建築物進行結構狀況測。
  2. The moving velocity in the vetical direction of the saline water was determined by comparison of buried depth saline water in observation wells at different period with distrabution of dring wells

    垂向運移特徵系根據油田開發過程中的分佈特點,通過對各地區,不同時間段測井資料中鹹水體埋深變化比較,確定不同地區鹹水體的垂向運移速率。
  3. Wdtf is the manufacturing base for geotechnical drilling tools of cge. its main products are drilling tools for geological and engineering drilling, including wireline drilling tools, pneumatic downhole hammers, downhole drilling motors, synthetic diamond and its products, tungsten carbide and its products, various drilling pipes and tools. all products are reliable in quality, stable in performance and reasonable in price

    無錫工具廠為中裝集團和工程施工用具的生產基地,主要生產各種地質進用具和工程施工用具,包括以繩索取芯工具系列風動潛沖擊器系列螺桿具系列為代表的工具人造金剛石及其製品各種牌號的型號的硬質合金及其製品各種釬桿釬具等。
  4. And it can avoid the bad blasting effect even the blasting accident for the shortage of geologic prospecting. even the blasting engineering can be constructed safely without any geologic prospecting information. so it can be drawn that this method is efficient, economic and safe

    採用這種方法可以避免由於地質信息的不足而不能比較全面地反應巖石性質武漢理工大學博士學位論文而引起的不良的爆破效果乃至爆破事故的發生,同時也可以在未能獲得任何地質信息的情況下安全地進行爆破施工,不愧為一種高效、經濟、安全的方法。
  5. Many bore holes in shuangwangcheng reservoir which lies in the sedimentary area are drilled and lots of terra drill data are collected. five typical sections, i. e. section i ? i, ii ? i, iii ? ii, iv ? v ' and v ? v are drawn. the vertical sedimentary sequence of this sedimentary area is divided cbmbining the granularity features of sediments

    課題組與山東省水利測設計院合作,對湖區內的雙王城水庫進行了研究,搜集了大量的地質資料,經沉積物巖性特徵分析,繪制出雙王城水庫外圍1km處圍繞水庫的5個典型剖面(即剖面? 』 、 ? 』 、 ? 』 、一』和? 』 )的剖面圖,結合沉積物粒度特徵,劃分出該沉積區的垂向沉積序列。
  6. In other words mineral substances which are found on earth must be extracted by digging, boring holes, artificial explosions, or similar operations which make them available to us

    換言之,地里被發現的礦物質必須經挖掘、、人工或類似的操作程序,才可以為人類所利用。
  7. A lot of cuttings can be produced during the field exploiting and production. but existing techniques ca n ' t acquire the key petrophysical parameters such as porosity, permeability, mobile fluid percent and oil saturation etc. from the cuttings

    目前,現有的技術無法快速從油田開發過程中收集到的大量井巖屑中獲得隙度、滲透率、可動流體百分數及含油飽和度等重要油層物理參數。
  8. Exploitation on pressure detective method for coal gas by prospect drilling

    煤層瓦斯壓力測試方法
  9. This paper has described in brief hydrogeological and geothermal conditions of longmen state grain depot in luoyang city, analyzed and interpreted integrated geophysical data obtained from the exploration locating of hot water and cool water wells over the same concealed fault in this area and, on such a basis, determined sites and depths of the drill wells

    摘要簡要介紹了洛陽市龍門國家糧庫所在地水文地質和地熱地質條件,分析解釋了在該區同一隱伏斷裂構造上進行熱水、涼水井定位時取得的綜合物資料,並據此確定了井位及深。
  10. In this paper, depending on the enormous 356 pile testing date detailed with soil and pile parameters and p ~ s curves, covering xi ' an and adjacent areas, we analyzed the load transmission mechanism of pile in loess foundation, and proposed a kind of hyperbolic load transmission function between pile and it ' s neighboring soil. meanwhile, we created a mathematical model to predict p ~ s curve and bearing capacity of single pile. by analyzing the compacting effect caused by pile - sinking of pressed pile in loess and it ' s influence on bearing capacity and settlement, two parameters, kc and ke are introduced to modify the soil cohesive c and deformation modulus es

    本文利用現己收集到的西安及其周邊地區356根打入樁、靜壓樁、灌注樁的現場試樁資料(其中打入樁67根,靜壓樁121根,灌注樁168根,並有詳細的地層資料,樁深資料,荷載沉降?曲線)對西安黃土地基中的打入樁、靜壓樁、灌注樁的荷載傳遞機理進行了分析研究,認為用雙曲線型的荷載傳遞函數模擬樁土之間的荷載傳遞函數是合適的,並用荷載傳遞分析的方法建立了計算p s曲線的數學模型及極限承載力的確定方法。
  11. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  12. In section five, in accordance with the drill prospecting, the paper applies the developed rayleigh wave method to detecting the ground of the navy scientific experiment building, the result is also very well. all of these prove the applicability of rayleigh waves method in engineering field and the feasibility of ultrasonic ct method to detect the weathering degrees of stone relics

    第五部分把改善後的瑞雷波方法結合鉆孔勘探應用於海軍科研試驗樓工程察中,效果較好,進一步證實瑞雷波方法在工程領域的適用性,同時也說明了超聲層析方法應用的可行性。
  13. The acticle passes the actual working experience of drilling bole explore for open coal mine engineering geology explain simbly a few problems of the dumping site leave thing layer meet with drilling hole explore, probe detailed the treatise and the technique meathod to. solve these problems

    摘要通過對露天煤礦排土場工程地質鉆孔勘探的實際工作經驗,簡要闡明了露天煤礦排土場排棄物層在過程中經常遇到的幾個問題,詳細論述了解決問題所應採取的技術方法與措施。
分享友人