鉆孔土樣 的英文怎麼說

中文拼音 [zhēnkǒngyàng]
鉆孔土樣 英文
borehole sample
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1. (形狀) appearance; shape 2. (樣品) sample; model; pattern Ⅱ量詞(表示事物的種類) kind; type
  1. The investigation of a lot of parameters about treated sandstone, brick materials and earthen materials with fluorited polymers has been carried out, such as the formation of polymer, the penetration depth, porosity, capillary absorption and penetration coefficient, water uptake, compressive strength, drilling resistance, absorption isotherms of water vapor, water vapor diffusion, color changes as well as resistance to desegregation of water, frizzing - throwing cycles, worming - cooling cycles, and so on. in addition, the influence of salt crystallization, acid and base, and uv aging have also been assessed in order to better understand the protection effects and utilization possibility of two fluorinated polymers, mainly according to astm standard and the combination of international methods together with general technological

    分別以國家級文物保護單位的質、砂巖和磚材文物品為對象,依據astm標準及國際通用文物保護研究方法與評估準則相結合,通過膠化物形成周期、滲透深度、隙度、毛細吸水和滲透系數、持水量、抗壓強度、抗強度、吸附水蒸氣的能力、透氣性、外觀顏色等系列參數的測定,及凍融、冷熱循環、酸堿腐蝕后抗壓強度的衰減、可溶鹽對保護效果的影響、酸堿及光照對表面保護效果的影響,對兩種含氟聚合物及其與有機硅的共混物在文物加固保護和表面防護中的可行性和保護效果給予了系統研究。
  2. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個, 9個, 178個探井,重整48個豎管測壓計及一系列的壤和巖石本的實驗室試驗。
  3. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個, 250個探井,重整48個豎管測壓計,將所取得的壤和巖石本進行實驗室試驗,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  4. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規試驗成果的使用應當慎重,對重要工程宜採用探坑、豎井取,或採用雙筒薄壁取技術。
  5. Due to its light and compact construction the wall saw oukai hds - 350s is the ideal one - man - saw for daily cutting jobs and drilling jobs on job sites

    施工時效率高,直徑大,是一種可在鋼筋混凝陶瓷玻璃水泥磚及瀝青路鐵路橋隧和取的工具。
  6. Standard practice for length change of cast, drilled, or sawed specimens of hydraulic - cement mortar and concrete

    水硬水泥灰漿及混凝的鑄造或鋸斷試長度變化的標準實施規程
  7. Verification of concrete strength ( destructive ) by coring - sample of concrete is cored cut, capped strength of the in - situ concrete

    用作證明混凝之強度-從現聲場板以作搞壓試驗,從而印證混凝之強度。
  8. The working stress of the rc compression member in existing structures can be calculated through measuring strain change before and after drilling the hole, determining the compressive strength and elastic modulus of concrete through the drilled sample and combining the calculating results of the finite element method

    該方法通過測試前後邊應變的變化,利用取的芯推定混凝的抗壓強度和彈性模量,再結合有限元計算分析,得到已建結構中鋼筋混凝受壓構件的工作應力。
  9. Generally speaking, the big primary soil sample collected in shaft is the true primary state soil sample, the sample collected by soil collected equipment in drilling is of different degree disturbance

    一般認為豎井中採取的大塊,是「真正」的原狀中使用取器採取的原狀存在不同程度的擾動。
  10. The main concept of the method is to distinguish the depth of the slip plane with the extruding water content zone and the enriched gray clay zone determined from the samples taken by manual twist drill

    該方法的主要思想是通過麻花尋找含水量突出帶和灰白富集帶來鑒別滑動面的深度。
  11. Abstract : in this paper, on the basis of three drill holes and forty - two buckets undisturbed samples of life rubbish in the sanitary fill field of tianziling , hangzhou, china, the tests to determine its composition , physical properties and organic content as well as triaxial compression test had been accomplished. the conclusions of this paper can be applied to the stability analysis and deformation calculation of the sanitary to use it as the building foundation

    文摘:用杭州天子嶺生活垃圾衛生填埋場的三個42桶原狀,進行了室內生活垃圾的成份分析、物理性質指標測定、有機質含量試驗及三軸剪切試驗,對試驗結果進行了分析與整理,這些結論可為生活垃圾衛生填埋場的穩定性分析、變形計算及其作為建築地基的可行性研究提供必要的數據。
  12. Through comparative analysis to the test data of tow sampling methods in drilling hole and sampling method in shaft, it was found out by the author that the drilling sampling method has obvious disturbance and depression to the soil sample, which caused the soil sample ' s dry density to be increased, porosity ratio to be decreased, filtration coefficient to be decreased, and modulus of compression to be increased

    筆者通過對兩種方法獲取的與豎井試驗數據的對比發現,有明顯的擾動和壓密作用,造成了的干密度增大、隙比減小、滲透系數降低、壓縮模量增大。
  13. Also, some core samples fronrchangjiang delta and huanghe delta are treated in the same way to have a comparison between core q43 samples and paleosoil samples which deposited in almost the same period

    而且,對長江三角洲和黃河三角洲品進行了類似處理。同時,還收集了中國陸殼物質的稀元素資料,進行對比、分析。
  14. Thirty roots of precast reinforced concrete piles and bored and cast - in - place piles in xi ' an had been trained with this model, and nine roots o f precast reinforced concrete piles and eight roots of cast - in - place piles had been predicted by simulating. when contrasted and analyzed the predicting result and actual numerical value, the error is always less than 20 % ( mostly within 15 % ), which has achieved a better result

    利用該模型對西安地區鋼筋混凝預制樁、灌注樁各30根作為本進行了訓練,並分別對9根鋼筋混凝預制樁和8根灌注樁進行了模擬預測,將預測結果與實測值進行了對比分析,其誤差都在20以內(大部分在15以內) ,取得了較好的結果。
  15. Designed for wall drilling of concrete block or brick without using water

    在無水環境下,適用於混凝或者磚塊上
分享友人