鉆孔方法 的英文怎麼說

中文拼音 [zhēnkǒngfāng]
鉆孔方法 英文
boring system
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 方法 : method; means; way; technique; process; procedure; plan; device; recipe; fashion; tool; maneuver
  1. Testing method for the performance of full screw earth auger

    長螺旋機性能試驗
  2. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地質災害,它的整治研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡整治.風動潛進是一種具有許多優點的,它的許多特點,如成質量高、應用范圍廣、無液體循環介質、進規程參數小、可實現大直徑基巖等都適合於抗滑樁施工.文章在介紹風動潛進特點的基礎上,根據抗滑樁施工要求,分析了風動潛錘用於抗滑樁施工的可行性,並舉出了其應用實例
  3. Following the idea of coseismic stress - triggering, coseismic strain steps recorded by borehole strainmeters are used to study coseismic stress - triggered fault slips

    摘要沿著同震應力觸發的思路,提出了利用應變觀測記錄的同震應變階反演同震應力觸發斷層活動的
  4. The investigation of a lot of parameters about treated sandstone, brick materials and earthen materials with fluorited polymers has been carried out, such as the formation of polymer, the penetration depth, porosity, capillary absorption and penetration coefficient, water uptake, compressive strength, drilling resistance, absorption isotherms of water vapor, water vapor diffusion, color changes as well as resistance to desegregation of water, frizzing - throwing cycles, worming - cooling cycles, and so on. in addition, the influence of salt crystallization, acid and base, and uv aging have also been assessed in order to better understand the protection effects and utilization possibility of two fluorinated polymers, mainly according to astm standard and the combination of international methods together with general technological

    分別以國家級文物保護單位的土質、砂巖和磚材文物樣品為對象,依據astm標準及國際通用文物保護研究與評估準則相結合,通過膠化物形成周期、滲透深度、隙度、毛細吸水和滲透系數、持水量、抗壓強度、抗強度、吸附水蒸氣的能力、透氣性、外觀顏色等系列參數的測定,及凍融、冷熱循環、酸堿腐蝕后抗壓強度的衰減、可溶鹽對保護效果的影響、酸堿及光照對表面保護效果的影響,對兩種含氟聚合物及其與有機硅的共混物在文物加固保護和表面防護中的可行性和保護效果給予了系統研究。
  5. The hunt oil company of dallas has become the first international company to receive permission to drill for oil in the kurdistan region of northern iraq since the local government issued an oil - and - gas law last month

    亨特塗油水于達拉斯的公司已經成為第一家國際的公司受到許可在北部伊拉克的庫德斯坦區域中為油自從地政府發行了油和上個月的瓦斯律。
  6. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊在溶洞地質條件下的合理使用;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析和有限單元,對灌注樁樁端下的巖體強度和結構穩定性面進行模擬計算和定量研究。
  7. Methods : clinical data of 32 cases of patients with complicated posterior urethral stricture treated by the trepanning appliance and the 21 cases by common operation were retrospectively reviewed

    :在對32例復雜性后尿道狹窄患者行開放性手術中,使用后尿道器組) ,並與21例常規后尿道的療效進行對比。
  8. Accident case of under water board cast - in - situ pile as well as the analysis of static pressure settlement method

    水下灌注樁事故實例及靜壓處理分析
  9. Based on the construction of large diameter pile foundations at deep water riverbed without overburden for the shengmi bridge in nanchang, the construction difficulties and construction control key points involved in the method for bored pile construction with floating gantry are described

    摘要通過對南昌生米大橋深水無覆蓋層大徑樁基施工實踐,介紹浮式龍門樁施工中的施工難點和控制重點。
  10. This method takes generalized tri - prism ( gtp ) as primitive modeling element, realizes inference and automatic modeling of geological structure including faults according to characteristics of borehole data and the knowledge inference rule, which can avoid unnecessary manual intervention, extend applicable range and expressing capability of 3d geological modeling

    以廣義三稜柱作為建模的基本體元,根據數據的特點和知識推理規則,進行斷層等復雜地質構造的推理和自動建模,避免了不必要的人為干預,擴展了數據建模的適用范圍和表現能力。
  11. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗斜井採用小斷面導硐后刷大、高負壓多排強抽,密集交叉邊掘邊抽及設置金屬骨架施工和防突措施揭穿高突特厚松軟煤層。
  12. The heat contained in a natural steam field is exploited by drilling a suitable number of wells down to the reservoir.

    天然蒸氣田所含有的熱能可以通過井的,即打適當數量的井到達熱儲的進行開采。
  13. After having analyzed the common test methods of working stress briefly, the boring - electrical test method is proposed to test the working stress of rc compression member

    對工程中常用工作應力測試進行了簡要分析,提出利用電測測試鋼筋混凝土受壓構件的工作應力。
  14. Besides, practical load of the ghes varies with time. the variable load of ghes is decomposed as a series of pulse load, and the superimposition principle is employed to obtain the real temperature response of the ghes on basis of the theoretical solutions of a single borehole experiencing a constant heat flux

    利用把具有摘要, . . . . . . . . . . . . . . .復雜邊界條件和熱源的問題分解為許多較簡單的問題的,把具有多個的地熱換熱器溫度場化作許多單溫度場的益加,建立了多地熱換熱器溫度場亞加模型。
  15. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8標段多座橋梁工程實踐為基礎,系統介紹了有地下采空層的巖石地區灌注樁施工的
  16. 3 transmission, built in the top drive power head, has two speed range ? high and low. it can meet the requirements of both dth hammer drilling and carbide bit drilling

    3動力頭設有變速裝置,有高低兩個檔次,以滿足潛進及硬質合金回轉
  17. The improvement of sealling method inside gas drainage hole

    瓦斯抽放的改進
  18. Influence of conditions of complex geologic structure on underwater drilling and its solution

    復雜地質條件下水下鉆孔方法
  19. Abstract : it introduces the boring method under different geometric conditions and points to be noted in constructing foundation for piles of tieshan harbor bridge

    文摘:介紹鐵山港跨海大橋樁基礎不同地質情況下的鉆孔方法和注意的問題。
  20. Abstract : the paper presented a kind of drilling hole method that adopted direct circulation and percussion drilling, casing and cliff - protection by mud. the method applied in the complex gravel layer which has the trend to emerge cave - in and drop from the drilling wall

    文摘:介紹一種在砂卵石地層層厚復雜、壁易掉塊、易坍塌的的成? ?正循環回轉與沖擊進、套管與泥漿護壁成
分享友人