鉆孔灌漿 的英文怎麼說

中文拼音 [zhēnkǒngguànjiāng]
鉆孔灌漿 英文
hole cementation
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • 漿 : 漿同「糨」
  • 灌漿 : 1 (澆灌灰漿) [建築] grout; grout in; grouting; grouting up; [采礦工程] injection2 [植物學] (穀...
  1. But these were uncased auger-drilled poured pilings, with the grout in direct contact with the native materials.

    不過這些都是露出地面經而成的樁,灰漿同天然材料直接接觸。
  2. Improving measures for the drilling of solidified grout hole with ingersoll - rand lm - 500c hydraulic drill rig

    露天液壓鑿固結漿的改進措施
  3. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋混凝土成樁技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成困難的問題,適應地質條件范圍廣,成樁速度較快,工期短、工效高;與復合地基成樁時的泥漿護壁成工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成工藝相比,螺旋混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合地基的變形較小。
  4. Bored pile - jet grouting supporting structure

    注樁與噴射注漿組合支護結構
  5. Bored pile post - grouting for the building of the production control center of fuzhou water company

    福州自來水公司生產調度中心大樓注樁后注漿技術
  6. Based on the results of vertical static loading test and stress test for longhole bored pile in loess foundation, by analysing the transferring law of axial force and the action of lateral friction resistance and bottom resistance, the paper discusses the influences of two types of holing technology on bearing capacity behavior

    本文通過黃土地基中旋挖注長樁和泥漿護壁注長樁靜載荷試驗和樁身應力的測試,分析了黃土地基中兩種成工藝注長樁樁身軸力的傳遞規律、樁側阻力及樁端阻力的發揮性狀,探討了兩種成工藝對注長樁承載力的影響。
  7. The grouting test result shows that this technique of pile foundation construction is effective, it can not only increase the upper and skin friction of the cast - in - place pile, but also improve the bearing capacity of the cast - in - place pile, and gain a larger economic benefit for whole project at the same time

    經樁端壓漿實驗結果表明,該技術可以增加注樁樁端阻力和樁側壁摩阻力,是一項行之有效的樁基施工技術,它可有效提高注樁的承載能力,同時提高經濟效益。
  8. By analyzing the several finished bridge projects, if the hollow pile foundation is adopted, we can economize subaqueous concrete consumption more than 40 per cents ; if the gr outed new technique of pile surroundings and pile toe is adopted, we can increase the load capacity 30 per cents than that of the replacement pile, and economize 20 per cents of the cost. it will show great and obvious economic and social benefits

    已建多座橋梁工程採用樁周、樁底壓漿新工藝的比較分析表明,該工藝可使水下混凝土的用量節省40以上,且比傳統的注樁可提高承載力30以上;節約造價20以上,具有顯著的經濟效益和社會效益。
  9. It is stated clearly by researching, the cast - in - place pile must be constructed according to strict technological process on condition that pebble geological structure, and more important that the drilling technology and the reasonable property index of mud are chose correctly on the basis of the condition of pebble geological structure

    研究表明,江漢平原地區卵石地基條件下,注樁必須要按嚴格的工藝流程施工,最重要的是根據卵石地基的地質情況,正確選擇工藝和合理的泥漿性能指標。
  10. Someone think it must use permeating theory to design, the others think it must use permeating theory to design. the building ministry made out the working standard of the later pressure grouting of pour pile, but it stand at the industry standard, is n ' t enough perfect and comprehensive. in this paper, the author put forward the design principle by analyzing the reasons that affect the bear load ability of the drilling hole pour pile and the principle that improve the bear load ability of single pile by later pressure grouting, put forward th e working technology and requirement of check before acceptance by analyzing and summarizing several models such as the chinese railway 11 office residential high building

    本文通過分析影響注樁承載力的因素以及注樁后壓漿提高單樁承載力的機理提出了設計計算的原則;通過中鐵十一局高層住宅樓注樁低壓力后壓漿工程對6根樁的壓漿對比試驗及探揭露確定了低壓力后壓漿所適用設計理論和方法;確定了低壓力后壓漿的壓漿壓力、壓漿量等參數;經過實驗及經驗總結確定了壓漿材料的選取原則及方法,列出了低壓力后壓漿在不同土層適用的壓漿材料。
  11. This paper expounds the application of the cast - in - place pile for its function and grouting technique in the foundation project of bridge construction

    摘要通過對注樁地基處理的工作機理及樁端壓漿技術在橋梁建設地基工程中的應用。
  12. Mechanism study on bored cast - in - place piles with post - grouting technology

    后壓漿注樁的荷載傳遞機理研究
  13. Abstract : based on the in - situ pressure - grouting experiments and the full - scale pile tests of xinxiang and ligou and yangzhou bridges, the process and effect of jet pressure - grouting are presented in this paper. the mechanism of increasing the performance of bored piles by grouting is also analyzed. an engineering experience of applying the new technique is presented in the paper

    文摘:根據新鄉、鞏縣及揚州等地注樁樁底壓力漿現場試驗和樁的靜載試驗,介紹了樁底壓力漿的工藝及壓力漿的效果,並對壓力漿提高注樁承載力的機理進行了分析,對其推廣應用作了介紹。
  14. Tests on post grouting into bored pile in shanghai

    注樁后壓漿技術在上海地區的試驗
  15. Use of non - disperse low solid mud in bored pile drilling

    不分散低固相泥漿注樁工程中的應用
  16. Abstract : in some project, pebble is used in bearing stratum. for the resean of lower strengthand bad property of construction. the bearing capacity of pebble can ' t achieve the reauirement of up - structure. but the pebble soild has higher permeability coefficient and placeability. the method has remarkable economic results

    文摘:在以礫卵石層為持力層的樁基設計中,由於其可性差、易坍塌,強度相對較低,但是具有較大的隙率和滲透系數,可性較好,採用一定壓力對注樁樁底礫卵石持力層注入水泥漿液對其進行加固處理,可以較大地提高其承載力,並能取得較為明顯的經濟效益。
  17. The paper draws some valuable conclusions : the limited bearing capacity of manual excavation filling pile is much higher than the limited bearing capacity of machine drilled filling pile ; through grouting injection around the pile shaft, the pile bearing capacity can be effectively improved ; proportion of resistance force around the pile side in total load is much larger than that of pressure on the pile tip, and the intensity of resistance force around the pile side is 30 - 50kpa on average

    得出一些有價值的結論:人工挖注樁的極限承載力明顯高於注樁的極限承載力;地下水位對樁基承載力有顯著影響;利用樁側注漿可有效提高樁的承載力;樁側摩阻力所佔總荷載的比例遠大於樁底壓力,樁側土的摩阻強度平均值為30 50kpa 。
  18. The bored pile by churning drive and bored pile with slurry wall protection are widely adopted in loess foundation in recent years

    摘要旋挖注樁和泥漿護壁注樁是近年來黃土地基中廣泛使用的樁基形式。
  19. Abstract : treatment of no. 2 dumping platform landslide of chang an refuse site in chengdu were introduced in this paper. bore pile and drainage project combinated with pressuregrouting engineering were carried out, and the comprehensive treatment gained good effects, not only controlling the landslide, but also meeting the user s needs

    文摘:概述成都市長安垃圾場2傾倒平臺滑坡的整治手段,實施注樁與疏排水相結合的壓漿工程,採取的綜合治理措施,獲得了良好的治理效果,既可根治滑坡,又能滿足2平臺的使用要求。
  20. Base - grouting influence upon the vertical bearing capacity of bored piles

    樁底注漿注樁豎向承載性能的影響
分享友人