鉆孔試驗 的英文怎麼說

中文拼音 [zhēnkǒngshìyàn]
鉆孔試驗 英文
boring test
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 試驗 : trial; experiment; test
  1. The local directional drilling is just staring in terrane, the equipments and the technologies ca n ' t satisfy far and far the spot construction needs, according to current circumstance and considing the existed equipments, the author put forward drilling by air hammer in terrane, having designed compounded - drilling tools, and recommended technology parameters. producing experiments have obtained good achievements in economic and in techniques

    國內定向進鋪管技術在巖層只是剛剛起步,設備、工藝遠遠不能滿足現場施工需要,本文針對國內、外巖層定向進非開挖設備及工藝現狀,結合國內大多施工單位的已有設備,提出巖層空氣潛錘導向進工法,設計了適合巖層進的實用具,並提出具有針對性的工藝參數,生產性取得了良好的經濟技術指標。
  2. Testing method for the performance of full screw earth auger

    長螺旋機性能方法
  3. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個, 9個土芯, 178個探井,重整48個豎管測壓計及一系列的土壤和巖石樣本的實
  4. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個, 250個探井,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  5. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次樁施工工藝的檢測和樁身質量及承載力的檢,確定了沖擊在溶洞地質條件下的合理使用方法;基樁承載實表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測工作;數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  6. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、聲波法以及室內巖石力學綜合評價水電站大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體收提供依據。
  7. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、聲波法以及室內巖石力學法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  8. Taking bench shooting of the shuibuya yihongbao project as example, it makes use of the digital television system of drilling overall - hole wall to actually measure, the testing result of lateral fractural range is 4 - 5m, and that of bottom fractural range is about 3m

    本文工作是以水布埡溢洪道工程梯段爆破為實例,採用壁數字電視系統對混裝乳化炸藥爆破破裂范圍進行了實際測,測結果為:側向破裂范圍為4 5m ,底部破裂范圍值為3m 。
  9. Comparison of results of conventional and high pressure water - pressure tests on the dam foundation rock masses of xiluodu hydroelectric station

    溪洛渡水電站壩基巖體常規壓水與高壓壓水成果比較
  10. Code of water pressure test in borehole for water resources and hydropower engineering

    水利水電工程壓水規程
  11. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規取樣成果的使用應當慎重,對重要工程宜採用探坑、豎井取樣,或採用雙筒薄壁取土技術。
  12. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件樁的單樁豎向靜載荷資料,分析了各樁特別是常規沖灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  13. Based on the results of vertical static loading test and stress test for longhole bored pile in loess foundation, by analysing the transferring law of axial force and the action of lateral friction resistance and bottom resistance, the paper discusses the influences of two types of holing technology on bearing capacity behavior

    本文通過黃土地基中旋挖灌注長樁和泥漿護壁灌注長樁靜載荷和樁身應力的測,分析了黃土地基中兩種成工藝灌注長樁樁身軸力的傳遞規律、樁側阻力及樁端阻力的發揮性狀,探討了兩種成工藝對灌注長樁承載力的影響。
  14. We employ over 3, 000 employees, including more than 300 skillful workers derived from different departments such as engineering department, design department, production department, mold making department, plastic injection department, metal department, electro plating department, quality control department, etc and have prefect and high technology production lines including mold making capacity, plastic injection and metal press facilities and sophisticated electro - plating technologies to produce more than 4. 5 million pieces of switches & jacks daily

    雇有3000多名熟練員工,其中工程技術人員有300多名,下設工程部、設計部、生產計劃部、工模部、注塑部、五金部、電鍍部、品質部、室等部門,擁有配套齊全、技術先進之生產備?包括?精密線切割機、放電加工機、細穴放電加工機、精密平面磨床、立式銑床、床、立式、臥式注塑機、自動車床及自動電鍍生產線等,每天為客戶生產超過450萬個開關及插座。
  15. According to the underground pressure distribution rule and the separation control function of drainage borehole, the shallow hole drainage technology is studied and tested by using the characteristic that the gas permeability may have an obvious increase after mining in front of the working face, obtaining some useful parameters, showing that the technology is feasible and credible

    根據礦山壓力分佈規律和抽放的隔斷控製作用,並利用工作面前方煤體受采動卸壓后透氣性顯著提高這一特性,研究並了卻壓區淺抽放技術,獲得了該抽放技術的工藝參數。
  16. Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge, the construction process of deep cast - in - place pile under pebble geological structure, the limit load - bearing capacity of single pile, side friction stress and head drag are researched in this thesis deeply

    論文結合湖北省荊州長江公路大橋的樁工程,深入研究了江漢平原地區卵石地基深灌注樁的施工工藝、單樁極限承載能力、樁側摩阻力和端阻力。
  17. In this paper, technology for water injection by long bore hole in fully mechanized mining face was studied, relevant experience and some parameter were acquired, which provide a reference for using this method in similar faces

    以鄭州礦區典型的「三軟」煤層綜放工作面為對象,研究了長注水防塵技術,取得了「三軟」煤層長注水經和參數,為鄭州礦區類似條件的工作面推廣該方法提供了參考。
  18. Abstract : in this paper, technology for water injection by long bore hole in fully mechanized mining face was studied, relevant experience and some parameter were acquired, which provide a reference for using this method in similar faces

    文摘:以鄭州礦區典型的「三軟」煤層綜放工作面為對象,研究了長注水防塵技術,取得了「三軟」煤層長注水經和參數,為鄭州礦區類似條件的工作面推廣該方法提供了參考。
  19. In this paper, on the foundation of synthesizing engineering practice and study result of planted bar technique by chemistry glue on the domestic and international, embedded experiment study and theories analysis are done about bonded anchor behavior of chemistry planted bar anchorage behavior in this paper, the experimental results of 32 pulling resistance test ( meiya z3530 ) are given, considering some factors to affect bonded anchor behavior of chemistry planted bar such as the strength of concrete anchorage lengths diameter of steel bar and holes thickness of the protecting layer confecting circumstance of the hoop bar and quantity of construction especially which is very easy to be neglected and so on, and bonded anchor mechanism failure mode load carrying capacity and slide behavior are analyzed in - depth

    本文在綜合國內外化學膠植筋技術的工程實踐和研究成果的基礎上,對化學植筋的粘結錨固性能作了較深入的研究和理論分析。文中通過32個化學膠(美亞z3530 )植筋件的拉拔研究,考慮混凝土強度、錨固長度、鋼筋植筋、徑、保護層厚度、箍筋配製情況及施工質量等因素對植筋粘結性能的影響,特別是植筋的施工質量對粘結性能的影響是比較容易被忽視的因素,對化學植筋的粘結錨固機理、破壞形態、承載力及滑移性能作了比較深入的剖析。
  20. Geotextiles and geotextile - related products. static puncture test cbr - test

    土工織物及相關產品.靜態鉆孔試驗
分享友人