鉆探條件 的英文怎麼說

中文拼音 [zhēntàntiáojiàn]
鉆探條件 英文
drilling condition
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • : Ⅰ名詞1 (細長的樹枝) twig 2 (條子) slip; strip 3 (分項目的) item; article 4 (層次; 秩序; 條...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 條件 : 1. (客觀的因素) condition; term; factor 2. (提出的要求) requirement; prerequisite; qualification
  1. After have systematically studied sequence stratigraphy of chagan depression, a analysis method of high precision sequence stratigraphic framework in fault - depressed lacustrine basin. the core of the establishing framework is exploration - significant identify of sequence, division of 2, 3, 4, 5 grades sequence and analysis of base - level based on lithologic log or well - logging, high - resolution seismic inversion constrained to well data. then using the results of 2d seismic data, and interpret sequence to enhance the precision of interpretation

    斷陷盆地高精度層序地層格架建立的核心是用/測井和井約束下的高解析度儲層橫向預測剖面等高解析度資料進行具有勘意義的二、三、四和五級層序的界面識別、層序劃分和基準面變化分析,在此基礎上標定常規地震剖面,進行區域層序地層分析,達到提高層序地層解釋精度的目的。
  2. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋孔灌注樁基樁施工中,在不同地質下,水上機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上孔嵌巖面上孔樁孔底標高問題作了
  3. And the author analyses and evaluates hydrocarbon source rock, caprock and trap reserving condition of work area on the base of drilling achievements of 7 emphases structure hi work area. therefore the author draws two conclusion as follow : ( 1 ) the most favorable reservoir of the work area is the spreading region of dolomite rock of carboniferous whose remaining thickness is greater than 20m with the region from jiao 1 well - cizhu 1 well - maan 1 well to west of shizhu county seat. the secondary favorable reservoir of it is the spreading region of dolomite rock with the remaining thickness greater than 10m but less than 20m which is eastern and western region of the most favorable region and the off - lying of yangdu 1 well and yangdu 2 well

    本文研究主要通過地層層序、沉積相、成巖作用和儲集等方面對該區石炭系黃龍組碳酸鹽巖儲層進行評價和預測,並且從該區7個重點構造的成果出發進行烴源巖、蓋層和圈閉保存等成藏的分析與評價,分別得出以下結論:工區最有利的儲層是石炭系白雲巖殘厚20m的分佈區,位於轎1井?茨竹1井?馬鞍1井?石柱縣城以西地區;較有利的儲層是石炭系白雲巖殘厚10 20m的分佈區,位於級區以東及以西的洋渡1 、 2井外圍;不利的儲層是白雲巖10m及石炭系黃龍組灰巖的分佈區,位於工區西南部和東部地區。
  4. The building guantou especially the big bridge engineering geology condition is more complicated, by drill to explore the data to announce to public the rock soil body of types, the engineering geology function and the geologic strata circumstance, this time soil kind and the rock samples that investigates to still pass to adopt in great quantities to carry on indoor experiment, get a great deal of data, in order to get the useful rock soil parameter, this thesis still introduces to beg the process of take the rock soil parameter in the way of the mathematics covariance

    館頭特大橋工程地質較為復雜,通過資料揭示了巖土體的成因類型、工程地質性能以及地層情況,此次勘察還通過大量採取的土樣和巖石樣本來進行室內試驗,得到了大量的數據,為得到有用的巖土參數,本論文還介紹了通過數理統計的方法求取巖土參數的過程。
  5. This paper has described in brief hydrogeological and geothermal conditions of longmen state grain depot in luoyang city, analyzed and interpreted integrated geophysical data obtained from the exploration locating of hot water and cool water wells over the same concealed fault in this area and, on such a basis, determined sites and depths of the drill wells

    摘要簡要介紹了洛陽市龍門國家糧庫所在地水文地質和地熱地質,分析解釋了在該區同一隱伏斷裂構造上進行熱水、涼水井勘定位時取得的綜合物資料,並據此確定了井位及孔深。
  6. In chapter six, based on the preceding chapters " research, the practicality of the full scale dr i 11 ing simulating test device has been tested by the debugging and the performance test. under simulating drilling conditions, the rock mechanical properties and the bits " dynamical tests are analyzed and set forth specifically. at the same time the effect of bottom pressure difference on the oil field exploration and development has been discussed

    第六章在前述分析研究的基礎上,通過對模擬裝置的系統調試及性能測試,驗證了全尺寸井模擬裝置的實用性,在井模擬下對巖石的機械性質、牙輪頭動態測試給予了具體的分析闡述,同時還分析討了井底壓差對油田勘開發的影illb ,並且為宋深101井的實際施工作業提供了非常有價值的指導參數。
  7. This thesis mainly with lately set up the wen - fu railroad building guantou especially the big bridge foundation investigates for the example, introducing the engineering geology to investigate of method, process and result, according to the building guantou especially the big bridge drills to explore the data, by the engineering geology estimate to the district geology background, engineering geology condition, hydrology geology condition, the place stability, providing the engineering geology data and the design parameters of the necessity for the construction design

    本論文主要以新建溫福鐵路館頭特大橋橋基勘察為例子,介紹了工程地質勘察的方法、過程及成果,根據館頭特大橋的資料,通過對區域地質背景、工程地質、水文地質、場地穩定性的工程地質評價,為施工設計提供了必要的工程地質資料和設計參數。
  8. By means of a series of indexes calculated by export data, the dissertation values the exporting competitiveness of chinese vegetable as a whole and of its main varieties. then on the base of porter ' s theory the dissertation establishes a diamond model of chinese vegetable and analyzees the advantageous and disadvantageous factors in forming competitiveness

    在此基礎上,依據波特理論構建中國蔬菜國際競爭力分析的「石模型」 ,索中國蔬菜出口競爭力形成的有利與制約因素,並將依據比較優勢理論得出的結論作為競爭力分析的有益補充。
分享友人