鋪管機 的英文怎麼說

中文拼音 [guǎn]
鋪管機 英文
pipe handling machine
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : machineengine
  1. Sales : imported and domestic natural rubber, butylbenzene rubber, polybutadience rubber, butyronitrile rubber, epdm rubber, butyl rubber, chlorosulfonated polyethylene tyre types superfine, smell - free, butyl, butyronitrile, color and milk natural rubbers, compound rubbers and reclaimed rubbers ; raw and auxiliary materials for rubber chemical such as rubber accelerator, antiager, black, paraffin, octadecoic acid, zinc oxide, magnesium oxide, titanium pigment, coumarone and powder sulfur ; different specifications of epdm color granules, crossover antiskid rubber floor brick, plastic rubber sites, lawn layout, different specifications of antiskid rubber floor brick, rubber blind - people road brick, plant brick, tree guard brick, top adiabatic brick, road rubber reducer brick, special green rubber tyre rubber granule, rubber powder and product, different rubber and plastic pipe, adhesive tape and plate, flexible rubber soft joint, rubber stop tape, bridge extension device, natural rubber plate pedestal, water - expanding rubber, rubber and plastic air duct, pe / pp / pvc water pipe, fulgurite, flame retardant wire gutter, floor wire gutter, mc nylon product, rubber and plastic machinery and fitting relieve, and processing of different ordinary and special rubber and plastic and nylon products

    經營銷售:進口、國產天然膠、丁苯膠、順丁膠、丁腈膠、三元乙丙膠、丁基膠、氯璜化聚乙烯、輪胎類精細、無味、丁基、丁腈、彩色、乳膠類等多種型號天然橡膠、合成橡膠和再生橡膠;硫化促進劑、防老劑、炭黑、石蠟、硬脂酸、氧化鋅、氧化鎂、鈦白粉、古馬龍、工業硫磺粉等各種橡膠化工原輔材料;各種規格epdm彩色顆粒,天橋防滑橡膠地磚、塑膠場地、人造草坪裝、各種規格防滑橡膠安全地磚、橡膠盲道磚、植草磚、樹木圍護磚、屋頂隔熱板、道路橡膠減速塊,專用綠色環保型橡膠輪胎膠粒、膠粉及成品,各類橡膠、塑料膠、膠帶、膠板,可撓曲橡膠軟接頭,橡膠止水帶,橋梁伸縮裝置,天然膠板式橡膠支座,遇水膨脹橡膠,橡膠、塑料導風筒, pe pp pvc水、電、阻燃線槽,地板線槽、 mc尼龍產品、橡塑械及配件調劑,並承接各種普通、特種橡塑、尼龍產品加工製造。
  2. Computer software system for hydrological data reorganization in irrigated area, which will be in common use, is developed firstly. in this system, the multi - curve ( including simple curve ) fitting equation and its graph can be generated automatically

    首次研究開發出多曲線擬合(包括單曲線)自動生成曲線方程和圖形的較為通用的灌區水文資料整編計算軟體系統,從而為灌區水文資料整編和理向現代化方向邁進平了道路。
  3. Earthmoving machinery - lift capacity of pipelayers and wheeled tractors or loaders equipped with side boom

    土方械.裝有側臂的鋪管機輪式拖拉或裝載的提升能力
  4. Technology of laying pipeline by guiding drilling of trenchless technology mean a new technological method to control and guide rig to creep into through various kinds of guiding apparatus, lay all kinds of different underground pipelines under the condition of not excavated or excavating few in the earth ' s surface

    非開挖導向鉆進技術就是指通過各種導向儀控制鉆鉆進的技術手段,在地表不開挖或少開挖的條件下進行設各種地下線的施工新技術。
  5. Article 12 when the laying of submarine cables and pipelines and other marine engineering operations require that those submarine cables and pipelines already laid be moved, prior consultations must be conducted with the owners of the aforesaid installations and an approval must be obtained from the competent authorities before the said engineering project starts

    第十二條設海底電纜、道及其他海上作業,需要移動已設的海底電纜、道時,應當先與所有者協商,並經主關批準後方可施工。
  6. Earth - moving machinery. lift capacity of pipelayers and wheeled tractors or loaders equipped with side boom

    土方械.裝有側起重臂的鋪管機輪式拖拉和裝卸的提升能力
  7. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開挖技術的發展情況分析,以及結合現代計算多媒體技術的特性,提出開發「水平定向技術多媒體培訓系統」的必要性;並在簡略介紹水平定向鉆技術的基礎上,給出開發「水平定向技術多媒體培訓系統」的「總論」 、 「施工前工程勘測」 、 「泥漿處理」 、 「施工原理」 、 「施工工藝」 、 「施工具」和「施工設計」七大模塊的具體設計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用前景和改進方向。
  8. Article 18 the competent authorities shall collect data concerning submarine topography and the distribution of structures at sea in order to offer consultancy services for laying of submarine cables and pipelines, and for conducting relevant investigations and surveying activities

    第十八條主關應當收集海底地形、海上構築物分佈等方面的資料,為海底電纜、道的設及其調查、勘測活動提供咨詢服務。
  9. Booth eenting, commodity exhibition, distribution ; ceramic, decorative materials, ceramic raw materials, ceramic producing facilities ; importing and exporting different kinds of commodities and technologies ; property management

    出租、商品展覽服務;經銷:陶瓷製品、裝飾材料、陶瓷原料、陶瓷械設備;自營和代理各類商品和技術的進出口;物業理。
  10. Earth - moving machinery - safety - part 9 : requirements for pipelayers ; german version en 474 - 9 : 1998

    土方械.安全性.第9部分:鋪管機的要求
  11. On the basis of front research and summing - up guiding drilling ' s rigs and projects of laying pipeline nation and abroad, develop " guiding drilling ' s rig optimum seeking system ", it provides directive significance for guiding drilling construction

    基於以上兩方面的研究,在對國內外現有導向鉆設備和導向鉆進工程的研究與整理的基礎上,開發出了「導向鉆進設備優選系統」 ,對導向鉆進施工具有指導意義。
  12. During the detail construction, this paper emphasized the importance and seriousness of designing tracking. when construction of directional hole, according to the demand of designing tracking, we choose suitable directional drilling machine and control equipment and emphasized the importance of slop prepare during the back - dragging

    在具體施工的過程中,本文強調了設計軌跡的重要性和嚴肅性,在施工定向軌跡時,一定要根據設計軌跡的要求,選擇合適的定向鉆和導向設備,嚴格遵循設計軌跡進行施工,同時強調在回拖過程中泥漿配備的重要性。
  13. The board will discuss the proposed routing of aviation fuel submarine pipeline, and an application for site investigation in relation to the construction of a jetty at lung kwu chau

    委員將討論設飛燃料海底道的建議路線,以及就龍鼓洲興建突堤而需進行海上勘察工程的申請。
  14. Article 7 after the completion of the engineering project, the owners shall submit all the explanatory data, such as the route chart and position chart of the submarine cables and pipelines, to the competent authorities for the record, and send duplicates to the harbour superintendence organs

    第七條設施工完畢后,所有者應當將海底電纜、道的路線圖、位置表等說明資料報送主關備案,並抄送港監關。
  15. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型設、電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的設、移位、交通運輸中笨重貨物的裝卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工作場所、高空作業、野外作業、坑道、深井作業和無電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  16. Earth - moving machinery. safety. part 9 : requirements for pipelayers

    土方械.安全性.第9部分:要求
  17. Article 5 the owners of the submarine cables and pipelines ( hereinafter referred to as " the owners " ) shall file a written application with the competent authorities 60 days before they start the investigations and survey of routes for laying the submarine cables and pipelines

    第五條海底電纜、道所有者(以下簡稱所有者) ,須在為設所進行的路由調查、勘測實施六十天前,主向關提出書面申請。
  18. Article 14 the competent authorities shall have the power to supervise and inspect the laying, maintenance, alteration, dismantling and abandonment of submarine cables and pipelines as well as the relevant investigations and surveying activities conducted for the laying of submarine cables and pipelines

    第十四條主關有權對海底電纜、道的設、維修、改造、拆除、廢棄以及為設所進行的路由調查、勘測活動進行監督和檢查。
  19. Article 15 the plan for determining the routes for laying submarine cables and pipelines beyond the petroleum exploitation zones in order to exploit marine petroleum resources shall be submitted to the competent authorities prior to the examination and approval of the overall plan for the exploitation of oil ( and gas ) fields ; and the competent authorities shall give approval after consultation with the competent state authorities for energy resources

    在海洋石油開發區內設平臺間或者平臺與單點系泊間的海底電纜、道,所有者應當在為設所進行的路由調查、勘測和施工前,分別將本規定第五條、第六條規定提供的內容,報主關備案。
  20. Has 2 year and above international working experience, familiar with franchise industry, and has international airport shops management working experience is in priority

    2年以上國際知名品牌理經驗,熟悉連鎖經營模式,有國際場店理者優先。
分享友人