鋪蓋 的英文怎麼說

中文拼音 []
鋪蓋 英文
spread out [smooth out] a sheet, a piece of paper, etc. and cover sth. with it; blanket
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : 蓋名詞(姓氏) a surname
  1. You got a bedroll, some oats and a week ' s rations

    一卷鋪蓋、一些麥片還有一周的干糧
  2. So i promised to bring some bedding, such as bedrolls, bedspreads and a bedstead next time

    於是我保證下次帶些被褥,比如鋪蓋卷,床單以及一個床架來。
  3. She always tidied up her own bedding, to stop the others from prying and perhaps spoiling the small box of cosmetics hidden there.

    她總是把自己的鋪蓋收拾得很整齊的,為的是不要別人去翻看或者弄壞了她藏在裏面的一盒化妝品。
  4. The former offered me munificent wages ; the latter ordered me to pack up : he wanted no women in the house, he said, now that there was no mistress ; and as to hareton, the curate should take him in hand, by and by

    她丈夫要給我很多工錢,她哥哥命令我打鋪蓋他說,現在沒有女主人啦,他屋裡不需要女傭人了。至於哈里頓,不久就有副牧師來照管了。
  5. This thesis focused on the warping soil consolidation mechanism under osmotic pressure as to blanket cracks disposal in earth dam

    針對土壩粘土鋪蓋裂縫的淤填處理問題,對淤填粘土在滲壓作用下的固結機理進行了研究。
  6. It is suggested that the impervious wall combined with curtain grouting should be taken as the main vertical impervious body for seepage control, and that the full use of slope wash and fully weathered zone as horizontal impervious blanket should be taken to reduce work load for seepage control

    建議採取截滲墻結合帷幕灌漿作垂直防滲體為主的防滲措施,同時充分利用坡積土和全風化帶作為水平防滲鋪蓋以減少防滲處理工作量。
  7. There is sufficient sand available to blanket the unconformity.

    這里有充足的砂質物鋪蓋不整合面。
  8. He could remember the way in which mr. alleyne had hounded little peake out of the office in order to make room for his own nephew.

    他記憶猶新:艾萊恩先生為了把侄子安插進來,耍盡手段逼得小皮克卷鋪蓋
  9. Standard test method for evaluating ceramic floor tile installation systems using the robinson - type floor tester

    用魯兵遜地面檢驗器評價陶瓷地面磚鋪蓋裝置標準試驗方法
  10. Despite this, not all iraqis are clamouring for the americans to go

    盡管如此,也並非所有伊拉克人都嚷著讓美軍卷鋪蓋走人,事實也的確遠非如此。
  11. The maid makes the bed every day, cleans the room regularly, and brings fresh sheets and towels once a week.

    女僕天天來床,按時打掃屋子,一個星期換一次干凈的鋪蓋和毛巾。
  12. Snow lay thick on the ground.

    厚雪鋪蓋著大地。
  13. As the car lurched over the snow he lifted his eyes and saw black people upon the snow-covered sidewalks.

    車搖搖晃晃地在雪地里前進,別格舉目望去,看見一些黑人在白雪鋪蓋的人行道上行走。
  14. Calculation method for settlement and cracks of clay blanket

    粘土鋪蓋的沉降裂縫計算方法
  15. When we get so much we pull up stakes and beat it

    等到我們攢夠了這個數,我們就收拾鋪蓋走人
  16. He went over to his roll of bedding and drew out a writing pad

    他走到他的鋪蓋卷,拿出一打書寫紙。
  17. " it says, ' no animal shall sleep in a bed with sheets, " ' she announced finally

    「它說, 『任何動物不得臥床鋪蓋被褥』 , 」她終于念道。
  18. A plastic sheet was pegged down over the compost heap to hasten decomposition

    把塑料布鋪蓋在肥堆上,並用木樁固定好,以加速肥料腐爛。
  19. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  20. It may be easier to justify the cost of pv cladding materials for commercial buildings, and the occupancy pattern means that they are much better suited to the availability of the electrical power produced ( see case studies 3. 3, 3. 4, 3. 5 and 4. 2 )

    可能證實在商業建築中採用pv鋪蓋材料的經濟可行性是容易的,並且它的使用方式也證明了其更加適合生產電能(見案例分析3 . 3 , 3 . 4 , 3 . 5和4 . 2 ) 。
分享友人