鋪路面 的英文怎麼說

中文拼音 [miàn]
鋪路面 英文
surface a road
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 路面 : road surface; pavement; roadbed路面板 road deck; roadway slab; 路面標高 grade elevation; 路面標線...
  1. Animation of highway surfaced with noise absorptive materials

    動畫:高速公上吸音物料
  2. Simple exploration to the project of laying asphaltum concrete on cement pavement

    水泥瀝青混凝土層方案適應性淺探
  3. The characters and reasons of easily destroyed asphaltum road was mainly discussed in this paper. then some prevention and cure measures was proposed to improve the quality of road construction

    摘要瀝青易損病害易發生在水泥混凝土加瀝青混凝土、地勢坑凹多雨水、斜坡、轉彎及十字口、公交站等段。合理設計結構、加強瀝青防水設計、嚴格控制施工質量是瀝青易損病害的主要防治措施。
  4. Basalt is needed to surface a road or to build a break water.

    需要用玄武巖來或修防洪堤。
  5. Surface dressing - test methods - part 1 : rate of spread and accuracy of spread of binder and chippings ; german version en 12272 - 1 : 2002

    敷料試驗方法.第1部分:粘合劑和石屑攤速度和準
  6. Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance

    通過試驗研究認為:玻璃纖維瀝青碎石的技術性能不如瀝青碎石好,但用彈性性能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其用性能仍值得探討,瀝青橡膠碎石結構層具有變形性能和抗裂性能良好,空隙率小,防水性能好,熱穩定性較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二級及二級以下公因疲勞而開裂的瀝青的良好罩材料,也是防止半剛性基層收縮裂縫反射的良好結構措施,在瀝青類層和半剛性基層之間夾瀝青橡膠碎石薄層,雖然造價比夾土工布高,但其施工工藝,抗裂性能和防水性能均優于土工布,不僅可以大大減少半剛性基層材料的反射裂縫,延長使用壽命,而且可能適當減薄瀝青混合料層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。
  7. Laying paving blocks on footpath at widening section

    于擴?設行人
  8. The number of complaints received by the integrated call centre ( icc ) and highways department ( hyd ) on uneven surface of paving slab footway for the last 2 years was about 950 each year

    (一)過去兩年,綜合電話查詢中心(查詢中心)及政署每年接到約950宗有關以砌的行人凹凸不平的投訴。
  9. There are many factors which contribute to the uneven surface of precast paving slabs. this may be due to the heavy loading caused by illegal parking of vehicles on the footway ; improper construction methods and substandard reinstatement works after road excavation

    (二)導致預制磚表凹凸不平的因素很多,包括在行人上違例泊車,以致負荷過重;砌方法不當;以及掘后進行的修復工程不合標準等。
  10. At about 4 am, the first lane and second lane of lantau link before the toll plaza were closed for roadwork. a private car driven by a 42 - year - old man was travelling along lantau link towards the airport and reportedly rammed the rear part of a truck parking on the first lane before the toll plaza to direct traffic

    早上約四時,青嶼干線近收費亭前的第一及第二行車線正進行重鋪路面工程,一輛由一名四十二歲男子駕駛的私家車沿青嶼干線行駛,該輛私家車到達收費亭前據報撞向一輛停泊在第一線指揮交通的工程車。
  11. Half of the roads are borderline cases and will need frequent re - surfacing, but once all 72 road sections are re - paved, 40 000 flats will benefit

    上述的72段道中,約半數屬于邊緣個案,日後必須經常重鋪路面。然而重工程以後,全港將有4萬個住宅單位受惠。
  12. Half of the roads are borderline cases and will need frequent re - surfacing, but once all 72 road sections are re - paved, 40 000 flats will have benefited

    上述的72段道中,約半數屬于邊緣個案,日後必須經常重鋪路面。然而重工程以後,全港將有四萬個住宅單位受惠。
  13. Engineers dug 1, 383, 000 cubic yards of gravel from riverbeds to surface the road. if this gravel had been loaded on railcars, the train would have been 427 miles long

    工程兵從河床挖了用以鋪路面的105萬立方米的礫石。如果將這些礫石用火車車皮裝載,那列火車得680公里長。
  14. We are going to surface this road

    我們將要為這條鋪路面
  15. Road resurfacing works

    鋪路面工程
  16. The scheme includes streetscape improvements, repaving, signage installation, etc. work on the scheme has commenced

    計劃改善的項目,包括美化街景、重鋪路面及加裝標等。
  17. Article 13 when urban roads having a width of less than 15 meters are improved, they shall be paved to the full width at one time

    第13條(之加)市區道改善加鋪路面時,其寬度在十五公尺以內者,應一次全寬設。
  18. Low - noise road surfacing materials can reduce noise by up to 3 db and 72 local road sections have been deemed suitable for the surfaces

    以低噪音物料重鋪路面可減低噪音高達3分貝a 。目前,本港共有72段適合重鋪路面的地區性道
  19. Two directors and a foreman of a road maintenance company were sentenced to jail terms ranging from two years and three months to three years for conspiring to defraud the highways department in relation to road resurfacing works

    兩名維修公司董事及一名管工,在進行重鋪路面工程中,串謀以假土芯樣本詐騙政署,被判入獄兩年三個月至三年。
  20. We also stated in the paper that funding for the retrofitting and road surfacing works for the roads identified at that time, and for any additional roads covered by the new policy, would be sought through the normal resource allocation mechanism

    但該文件亦清楚表明為已選定的段和在新政策下所涵蓋的其他段加建隔音屏障隔音罩和重鋪路面所需的撥款,將會透過正常資源分配的機制調撥。
分享友人