鋼井壁 的英文怎麼說

中文拼音 [gāngjǐng]
鋼井壁 英文
shaft steel casing
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : 名詞1 (墻) wall (of a house etc ) : 銅墻鐵壁 bastion of iron2 (作用像圍墻的部分) wall of st...
  1. As anti - corrosion primer for steel surface such as the new production of ship and offshore platform

    主要用於新造船、海上鉆平臺即石油儲罐內鐵表面的防腐底漆。
  2. Application on steel - aluminum skip of shaft in hebi 5 mine

    鋁結構立輕型箕斗在鶴五礦的應用
  3. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙圍堰鉆孔樁基礎,圍堰在橋梁基礎施工中的應用越來越多。
  4. The hole was lined with a steel tube to prevent the walls from falling in.

    用一根管給鉆孔加襯,以防坍塌。
  5. Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    文摘:協莊礦副立塔為現澆筋混凝土箱形結構,採用滑一澆一工藝進行煤礦塔施工,施工順序為塔逐層滑升,梁板逐層跟進,施工中利用塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  6. The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    協莊礦副立塔為現澆筋混凝土箱形結構,採用滑一澆一工藝進行煤礦塔施工,施工順序為塔逐層滑升,梁板逐層跟進,施工中利用塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  7. Study on mechanical characteristics of reinforced concrete arc shaft wall in frozen shaft

    凍結筋混凝土弧形板力學特性研究
分享友人