鋼堰 的英文怎麼說

中文拼音 [gāngyàn]
鋼堰 英文
steel weir
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞(較低的擋水建築物) weir
  1. This is a manufacturer specializing in manufacturing machines of producing soft metal pipe, corrugated pipe and stainless steel pipe

    江蘇?姜通用焊接機械設備廠是一家生產金屬軟管、波紋管及不銹設備的專業廠家。
  2. It is widely applied to the stove top, shove head, stove door and burmer brick, the binding of cooling - tube and groove bottom of the molten steel mouth of the heat stove, meantime empopyed in the field of the step stove bottom, the fir - proof wall of the circular stove, the cover, the protruding tape and sand sealing mouth of the equal - heating stove, the triangle, the spray gun and meltingiron groove of electric stove and also including fire - resistant material used in the refine stove and the stove door

    加熱爐的爐頂、爐頭、爐門、燒嘴磚、水冷管包紮、出槽槽底、步進爐爐底、環形爐檔火墻、均熱爐的爐蓋、凸出帶、砂封口、中間包包蓋、電爐三角區、鐵水包襯里、爐外精煉用噴槍,底吹氧煙道、鐵水溝蓋、檔渣、高爐中各種耐用火料襯里煉焦爐爐門等。
  3. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了板樁圍管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁沉井圍鉆孔樁基礎,在橋梁基礎施工中的應用越來越多。
  4. Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete

    本文結合實際工程,詳細分析了的構造、錨錠系統的布設、錨纜的計算、的製作及組拼、的接高與下沉、水下混凝土封底等圍施工的重要內容;並對常用的套箱施工技術進行了討論。
  5. Steel sheet pile cellular cofferdam

    板樁格型圍
  6. Steel sheet pile earth cofferdam

    板樁填土圍
  7. The design amp; construction of single - wall steel pile cofferdam in deep water

    深水基坑單壁板樁圍設計與施工
  8. Application of steel sheet pile cofferdam on excavation of deep water foundation pit

    板樁圍在深水基坑開挖施工中的應用
  9. Construction of cofferdam for bearing platform and steel sheet pile of main piers of huangzhou bridge

    黃洲大橋主墩承臺板樁圍施工
  10. The design of the drilling platform for bored pile construction of hangzhou bay cross - sea bridge

    杭州灣跨海大橋承臺板樁圍的設計與施工
  11. Secondly, based on the theoretical analysis of the chosen anti - slipping scheme, anti - slipping stress test, strength test of sealed - cover concrete, anti - floating test of cofferdam, stress test of supporting pile and stress test of stability are processed respectively, which proves that the new scheme presented in this paper is feasible

    然後對選定的抗滑方案進行理論分析,分別進行抗滑受力檢算、封底混凝土強度檢算、抗浮檢算、支樁受力檢算和穩定受力檢算,從理論上驗證本方案的可行性。
  12. Practice shows that this design is successful and presents a new design - concept and method

    實踐證明本橋異型的設計是成功的,為今後特大型異型設計提供了新的設計思路和方法。
  13. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  14. The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier

    摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型吊箱圍採用工廠整體製造,下河浮運至墩位,利用錨墩施加預拉力精確定位的施工新工藝。
  15. Construction technology for large double wall steel cofferdam in strong bore section

    強涌潮河段大型雙壁施工技術
  16. This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway

    摘要介紹武廣客運專線衡陽湘江特大橋53號、 59號淺灘墩採用的築島、下沉混凝土圍施工方案,以及54 ~ 58號深水水中墩採用的雙壁結構圍施工方案。
  17. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  18. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  19. The construction technology of the thin - wall caisson used in drilled pile foundation

    高壓旋噴樁配合雙壁在深水承臺施工中的應用
  20. The characters of the steel round the barrage are : very convenient in producing and section, fast in construction and in good quality. so, it has been adopted in many bridge ' s deep water foundation in our country

    這種結構型式,製造及拼裝都很方便,施工速度快,質量好,因此國內多座橋梁的深水基礎相繼採用了這一結構形式。
分享友人