鋼斜拉橋 的英文怎麼說

中文拼音 [gāngxiéqiáo]
鋼斜拉橋 英文
steel deck cable stayed bridge
  • : 鋼名詞(鐵和碳的合金) steel
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 拉構詞成分。
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. A comparison of steel deck weights indicates that the cable-stayed bridge again fills the void between the continuous girder and suspension bridges.

    以上面重量的比較指出,介於連續梁和懸索之間。
  2. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    墩設計為筋混凝土圓端型沉井結構,其中詳細介紹了沉井下沉施工技術,同時介紹了水下松動控制爆破技術。
  3. Corrosion action slope cable used in cable - stayed bridge in different corrosion medium such as synthesis sea water, solution nacl and simulation acid rain are studied by electrochemical method, for example, linear polarization, tafel extrapolation and ac impedance method

    對此,本論文以人造海水、 nacl溶液、模擬酸雨作為腐蝕介質,針對不同類型的絞線,採用線性極化法、 tafel外推法和交流阻抗法等電化學方法研究索結構中絞線在不同介質中的腐蝕行為。
  4. The research in this paper is expected to provide helpful reference for the future design of pedestrian bridge with spacial double - layer cable system and abnormity steel box girder

    通過本文的研究,以期為今後空間布置的雙層索系以及異形箱梁在人行景觀梁設計中的應用提供有益參考。
  5. Under selfgravity and secondary dead load, the wide steel box girder cable - stay bridge has a large deflection in transverse

    梁寬較大的箱梁在自重和二期恆載的作用下,在橫向有著較大的撓度,在設計中必須予以考慮。
  6. Modify above model along with altering structural form or the constitution of the bridge, such as different standard, steel ratio, steel pipe diameter, concrete module, brace allocation, the length of concrete of the main ribs, suspending pole mode and cable local vibrations, calculate the variety of dynamic character, analyze this factors which will affect. 2

    自振特性進行參數分析,分別考慮了不同規范、含率、拱肋管直徑、混凝土彈性模量、橫撐布置、拱肋段混凝土長度、吊桿形式對自振特性的影響,最後考慮了索局部振動對自振特性的影響。
  7. This paper highlights the durability design features and design alternative adopted for the parts of steel structure, concrete decks of and joints between steel and concrete composite box girder for the cable - stayed spans of donghai bridge over main navigable channel in the marine environment

    摘要介紹東海大主航道混凝土箱形結合梁的結構部分、混凝土面板、混凝土結合部位在海洋環境下耐久性設計特點及採用方案。
  8. Vibration control of steel tower of large span cable - stayed bridge under construction

    大跨度塔施工階段振動控制
  9. There are rope bridges, arch bridges, tower bridges, cable bridges and reinforced concrete bridges

    有早期的索、拱、塔筋混凝土
  10. The cable - supported concrete - filled steel tube arch bridge is a new bridge type developed on the basis of the truss type hybrid arch bridge by combining various techniques and making full advantages of the concrete - filled steel tube arch bridge, truss arch bridge and cable - stayed bridge

    摘要管混凝土索拱是在「桁式組合拱」的基礎上將管混凝土拱、桁架拱的技術特點綜合起來,揚長避短,而構思出的一種新型。
  11. In order to satisfy the demands of the main pylon measure benchmark stakingout and the cable anchor - pipe positioning for cable - stayed bridge, a new georobot relative datum 3d polar coordinate method is presented

    摘要結合索塔基準放樣及索預埋管的精密定位的需要,提出了一種新的基於測量機器人的三維相對基準放樣方法,並成功用於灌河特大的施工放樣。
  12. Considered local damage due to steels corrosion, fatigue, prestressing loses, whole bridge incline and distortion, this paper studies damage diagnosis technique of the cable - stayed bridge and determines the location and size of damages for yonghe cable - stayed bridge, which has been used after 15 years

    針對筋腐蝕、疲勞、預應力鬆弛、梁整體傾或變形所引起的局部破損,本文以使用15年後的永和為研究對象,對大型破損診斷技術進行研究,對永和破損位置進行定位、對其破損程度進行評價。
  13. The theme get the integration between design of the large highway bridge in anqing and theory studying, carry out an research in emulating calculation of steel box beam cable - stay bridge. the theme used the transfer - matrix in solving computing of cable - stay bridge structure, got a improving in computing of cable and the load and landed of cable strength

    針對箱粱的特性,論文確定了以控制箱粱梁端位移與索內力為調整目標,利用循環的正裝過程對的模擬進行計算,並對索塔的塔頂位移進行了良好的控制。
  14. Making reference to the anqing changjiang river highway bridge construction and the construction control, firstly, this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically, and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis. then on the basis of introducing the construction process of the anqing changjiang river highway bridge, analysis the construction course fully, and analysis comparatively the result of each girder segment construction simulation, and study the variation philosophy of the line style of large cable - stayed bridge during construction

    本文緊密結合安慶長江公路大的主梁施工及施工控制實踐,首先系統地分析了施工控制模擬計算的整體思路,並重點分析探討了施工過程計算的理論:理想倒退分析和實時前進分析,然後在介紹安慶長江公路大施工過程的基礎上,全面地計算分析了全的施工過程,並且應用施工過程計算結果,對每一個梁段的施工模擬工況進行對比分析,研究了大跨度鋼斜拉橋在施工過程中的線形變化規律。
  15. Technical conditions for hot - extruding pe protection high strength wire cable of cable - stayed bridge

    熱擠聚乙烯高強索技術條件
  16. The long - span cable - stayed concrete filled steel - tubular arch bridge is a kind of new bridge structure form, which combines the cable - stayed bridge and the arch bridge harmoniously. it not only exhibits the respective merits of the cable - stayed bridge and the arch bridge, but also makes two kinds of advantages of bridge type get to add mutually

    大跨度管混凝土拱是一種新型的梁結構形式,它將與拱有機的結合起來,不但展示了拱各自的特點,而且使得兩種型的優點得到了相互補充。
  17. With the appearance of high strength concrete high tensile steel wire and cable, the cable - stayed bridge is more and more widely used and popular. it unites three diversely bearing structure style, compression tower tension cable and bending press beam, into one bridge style

    是隨著高強度混凝土材料、高強絲和索的出現才得到廣泛推廣應用的型,它把主塔受壓、索受及主梁受壓彎的三種不同受力的構件有機地組合在一個統一體中。
  18. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔的主體工程,結合已有的梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和墩;用可考慮幾何非線性的桁元模擬索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張預應力筋和張索。
  19. Accordingly, the problem of dynamical, such as seismic response, wind induced vibration, coupled dynamical vibration between bridge and vehicle should not be ignored. especially, stay cable, which is one of the main components in cable - stayed cfst arch bridge, is susceptible to environment and traffic excitations because of its flexible, low damping small weight, then the significant vibration is induced. the accurate analysis of the dynamic characteristics of cable - stayed cfst arch bridge is very important for the design of this type bridge

    大跨管混凝土拱作為一種新型的組合結構梁,由於結合了和拱的優點,已經運用到實際工程中,但其理論研究才剛剛起步,大跨與大跨拱一樣,是一種柔性結構,應該重視其動力問題,地震、風振、車振等動力問題是該類梁所無法迴避的,尤其是的主要承力構件之一的索,由於其大柔度、小質量和小阻尼等特點,極易發生振動,準確分析索的動力特性是設計的重要工作之一。
  20. The main research content and conclusion is : 1. the research importance of cable ’ s corrosion behavior in cable - stayed bridge is introduced in brief, and the research status quo about cable ’ s corrosion is summarized

    本文的主要研究內容和結論有: 1 、簡要介紹了索結構中絞線腐蝕行為研究的重要性,綜述了索腐蝕的研究現狀。
分享友人