鋼梁的頂層 的英文怎麼說

中文拼音 [gāngliángdedǐngcéng]
鋼梁的頂層 英文
cope in steel beam
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 4次方是 The fourth power of 2 is direction
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 頂層 : attika
  1. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包混凝土邊節點1 4比例模型偽靜力試驗,以柱軸壓比、布置形式、配箍率等為主要參數,分析外包混凝土現澆框架一般邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點抗剪機理、破壞模式、變形能力、承載能力和角錨固可靠性;分析了邊節點在張開彎矩作用下工作性能、破壞模式和抗剪承載力;分析了試驗節點滯回性能和耗能能力。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    製造由筋工程、模板工程、混凝土工程、預應力工程、移存工程、孔道壓漿工程、體封端工程、橋面防水和保護工程等施工環節組成。文中介紹採用胎具製作和綁扎筋,分底腹板和板分別綁扎並吊裝筋骨架入模;拆裝式和液壓式兩種模板設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再施工順序和斜向分段、腹板水平分、附著式振搗為主、插入式搗固為輔施工工藝,蒸汽養護方法和規定;應力應變雙控制確保預應力施工質量施工技術;採用重物移運器有效移施工方法;壓漿、封端、橋面防水和保護施工一些規定和注意事項等都是對箱製造行之有效施工技術和施工方法,並可為以後類似施工作借鑒。
  3. Cope in steel beam

    鋼梁的頂層
分享友人