鋼橋架設機 的英文怎麼說

中文拼音 [gāngqiáojiàshè]
鋼橋架設機 英文
steel bridge fabricating machine
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : machineengine
  • 架設 : set up; erect
  1. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    管混凝土拱的拱軸線選用、管節段彎制、節段拼接、管內分隔倉、綴板計、聯結繫系統、合龍計及其細節、管內混凝土的泵送、吊桿、系桿、纜索吊與扣索塔、技術規范等12個問題進行了探討。
  2. Based on such characteristics and the researches of the country and outside, this paper mainly studies at the automatic distribution of prestressing cables of prestressed concrete beam bridge and the automatic working drawing of the steel bundles. in this paper, based on the study of the group of the project, it sets up a fuzzy optimum math - model of the prestressed degree for prestressing cables disposition of prestressed concrete continuous beam bridges. and in the drawing of the steel bundles, the set up of the " prestressing cable model " makes its course convenient

    本文針對現有的梁cad系統的不足,從工程實際應用的角度出發,初步構想了預應力混凝土梁cad系統的框,並主要在其自動配束以及預應力束布置圖的自動繪制方面作了一定的分析與研究:在配束方面,根據其計的特點及存在預應力束調配過程煩瑣的現象,引入數學方法,基於模糊集合和預應力度的概念,初步探討了連續梁預應力束自動配置的理;在束圖的繪制上,根據對束特點的分析,提出了「束模型」的概念,對預應力束進行描述,並給出了控制「束模型」以及束布置的參數,據此,作者採用fortran語言編寫了束布置圖的繪製程序,實現了束布置圖的自動繪制。
分享友人