鋼筋就位 的英文怎麼說

中文拼音 [gāngjīnjiùwèi]
鋼筋就位 英文
rebar on place
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : Ⅰ動詞1 (湊近; 靠近) come near; move towards 2 (到; 開始從事) go to; take up; undertake; engag...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. Based on the past results, seismic behavior of r. c. frame structure with special - shaped column is studied, according to the members to the structure in sequence in this paper. the main contents are as follows aspects : first of all, aiming at the characteristics of special - shaped column, various control parameters including allowable value of drift angle, axial load ratio etc, are studied

    本文在前人研究成果的基礎之上,混凝土異形柱框架結構的抗震性能,按照從構件到結構的順序展開研究,主要內容如下:第一,針對異形柱的特點,對影響結構抗震性能的主要參數,如層間移角、軸壓比等進行研究。
  2. A special steel spreader beam was used to erect the fabricated cage in its proper position in the roadway structure.

    使用一個特製的托架來安裝預制的錨固橫梁的骨架,使其於上部結構內預定的置上。
  3. Form ties bolt bore : bore drilling should be done when first time used form plate assembling on site to keep away from steel bar and reduce blank out bore happened

    7對拉螺栓孔:第一次使用的模板應在現場組裝時鉆孔,以避開,減少廢孔的出現。
  4. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍、澆築完畢階段混凝土、張拉預應力和張拉斜拉索。
分享友人