鋼筋施工 的英文怎麼說

中文拼音 [gāngjīnshīgōng]
鋼筋施工 英文
reinforcement work
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. There is no relavant content in corbels in steel fiber reinforced concrete regulations of structural design and construction ( cecs38 : 92 ). accordingly the design of steel fiber reinforced corbels does not have any regulations to follow

    國內現行的《纖維混凝土結構設計與規程》 ( cecs38 : 92 )也沒有相關的內容,使得纖維混凝土牛腿的設計無章可循。
  2. Thus the use of steel fiber reinforcement concrete in corbel can avoid complicated calculating in design, and the diminish difficulty of construction, at the same time when corbel ' s dimension can not be increased the reinforcement concrete corbel ' s ultimate load capacity and anti - seismic performance can be improved by the addition steel fiber into concrete. this method has become a kind of applied method and is highly concerned by the domestic and international academe and engineer group

    因此,在配密集的牛腿中使用纖維混凝土可以避免設計時繁雜的配計算、減小難度,同時在牛腿截面尺寸不能增大的情況下,可以通過加入纖維來提高混凝土牛腿的承載力和抗震性能,用纖維加入混凝土牛腿已成為一種實用方法受到了國內外學術界和程界的極大關注。
  3. The analysis and protecting of appearing temperature crack in the process of large volume ferroconcrete project

    大體積混凝土中溫度裂縫的分析與防治
  4. Abstract : by using engineering example this paper briefly introduces the application and constrction method of ferroconcrete filling pile in the transformation of old buildings

    文摘:以程實例簡要介紹了砼灌注樁在舊樓改造中的應用及具體方法。
  5. B87c breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. it is more powerful in breaking ferroconcrete, rocks and asphalt. boasting greater efficiency and durability, it suits the requirements of breaking outsized, super - thick and hard objects. it is ideal machinery for the substructural construction of mines, bridges, roads and civil infrastructure

    B87c破碎機採用美國迦納德?丹佛氣動集團公司成熟技術,是以壓縮空氣為動力的破碎具,能高效完成混凝土、巖石、瀝青等破碎作,具有馬力更大、效率更高、壽命更長等特點,特別適宜對特大、特厚、特堅硬物體的破碎作業,是礦山、橋梁、道路、市政建設等基礎的理想具。
  6. Construction of turnover formwork in reinforcement chimney hydraulic lifting frame

    混凝土煙囪液壓提升架翻模
  7. This paper studies the reliability of structure during the construction period based existing data and the consideration of structural resistance increasing with time, and analyzed an example, the result of the analysis shows this method is available to the analysis of the structure reliability

    在已有的混凝土結構現場活荷載統計資料的基礎上,考慮了抗力在期間隨時間增長的特性,研究了結構的可靠度,分析了算例。
  8. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場藝與質量控制,程採用振動梁和振動棒相結合的小型機械法,通過對關鍵序如:測量、場區基層碾壓、二灰層鋼筋施工、模板、混凝土面層的藝與質量控制,表明小型機械法能滿足程需要,程完成後符合驗收標準,滿足了業主的使用要求,對于同類程的具有借鑒意義。
  9. In the paper, not only such factors as reinforcing steel bar, various placing temperature of concrete in case of lift placements, lift thickness, time interval between lifts, the variation of elastic modules of concrete, heat of hydration, the temperature changes of environment but the effect of creep deformation and autogenous volume change on the temperature field and thermal stress field of reinforced concrete face - slab are considered

    本論文在分析中,考慮了、混凝土分層澆築、入倉溫度、澆築層厚、間歇、混凝土彈性模量變化、水化熱發散規律、外界氣溫等因素的變化及混凝土徐變和自生體積變形等因素對面板溫度場和溫度應力的影響。
  10. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了效,減少了倉面污染;模板程大量採用定型模板技術,提高了壩體混凝土成型質量和程進度;在二期混凝土區域,為免除人鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;連接改進傳統的電焊連接方式,採用大量採用接頭機械連接技術,有效提高了接頭強度和連接速度,安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期程持續高強度混凝土系統程的研究,使三峽程成為名符其實的「世界一流程」成為可能;三峽二期程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  11. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術程分類及適應范圍進行了理論上的分析研究;然後結合程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通穿柱法」做承臺梁, 「抗彎抗剪錨法」強化柱加固效果, 「板箍法」做地基梁連接點等多項技術;在方案的研究和實過程中,對于組織進行綜合闡述,並就人挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項方案提出有針對性的技術措,人挖孔樁採用砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行籠吊裝簡化序;承臺梁採用梁主橫穿柱身化學膠錨固等;地下加層綜合技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該程實后的效果分析,說明該項綜合技術的可行性。
  12. In this paper at last. the localized anti - collapsing effect of the cave depot of single aircraft under the explosive load is calculated and analyzed. the explosive result shows that 3d ripped steel plate and ribbed shell structure are effective to raise the capacity of anti - collapsing of the protective structures

    對飛機單機掩蔽庫程在爆炸荷載作用下,抗局部震塌效應進行了計算分析,模擬直接命中的爆炸試驗結果表明:混凝土內襯三維波紋板組成拱型復合結構,是提高防護結構抗震塌破壞的一種十分有效的措
  13. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    斜拉橋主橋墩設計為混凝土圓端型沉井結構,其中詳細介紹了沉井下沉技術,同時介紹了水下松動控制爆破技術。
  14. Because of its resistance to electrochemical erosion, low manpower demand for application and minimal changes in geometrical dimensions of the member, the method has been found to be economical and efficient for application, based on the previous work, we designed and conducted experiments of 10 reinforced concrete ( rc ) slabs strengthened with the common carbon fiber reinforced plastic ( cfrp ) ; and investigated the effect, failure mechanism and theory

    由於具有耐腐蝕、簡便快捷、幾乎不改變構件原有尺寸等特點,得到廣泛的應用,具有良好的經濟效益。在前人的作基礎上,我們設計、試驗了10採用碳纖維布加固的混凝土單向板,探討了加固單向板的加固效果和理論分析方法。
  15. This result has practical significance. in this paper ' s theoretical section, base on current shrinkage and creep calculational methods, analysis to the experiment project and tall building structure examples were made, and then the influence of shrinkage and creep to structure stress was put into discussion ; moreover, an fea program was compi led to calculate shrinkage and creep strain considering construction process, and through a tall building instance, the influence to tall frame structure stress was analyzed

    本文的理論部分在現有收縮徐變計算方法的基礎上對本試驗程和高層建築結構進行了算例分析,通過與彈性計算值的對比,討論了收縮徐變對結構內力的影響,以及計算收縮徐變時是否考慮過程對結果的影響;本文還編制了考慮過程收縮徐變的有限元程序,並進行了算例分析。
  16. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下沉受力原理,分析了沉井結構,介紹了沉井過程中的下沉、糾偏、測量控制以及特殊情況處理的技術措,如沉井製作中的填沙內模,模板支設和綁扎,混凝土澆注;沉井下沉控制中的刃腳內模沙土,抽沙泵抽沙下沉,高壓水槍破壓、空壓機吹壓下沉等。
  17. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面支護體應力監測的程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護拱應力、錨桿軸力、噴射混凝土內應力、臨時支撐應力、二次襯砌應力等測試結果和變化規律;確定了拱應力急劇增大而可能引起支護體系失穩的原因。
  18. This paper introduces the construction techniques of the box girder bottom - formwork making, steel bar handling, and concrete casting, etc., and expounds the applications of these techniques in the two box girder bridges in the 10th contract section of changhan superhighway

    介紹了箱梁底模製作、、混凝土澆築等藝及其在長邯高速公路第10合同段內的兩座箱梁大橋中的應用。
  19. The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on

    摘要從測量標識測設、模板鋼筋施工、混凝土澆築等幾個方面介紹了三峽右岸電站廠房15 ~ 18號機組主廠房墻體清水混凝土墻技術。
  20. Specification for construction of hydraulic concrete reinforcement

    混凝土鋼筋施工規范
分享友人