鋼管桿 的英文怎麼說

中文拼音 [gāngguǎngǎn]
鋼管桿 英文
steel pipe pile
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : 桿名詞(桿子) pole; staff
  • 鋼管 : steel pipe; steel piping; steel tube; steel tubing
  1. Design of half - through steel pipe bowstring concrete arch bridge of long - span, and knowledges to it

    大跨度中承式混凝土拱橋設計和體會
  2. The results indicate that fiber grating strain sensors are able to monitor the tension status about reinforced concrete bowstring arch bridge effectively

    應用結果表明:光纖光柵測力傳感器可有效監測混凝土系拱橋系的受力狀況。
  3. The calculation modes of the coefficient of shrinkage and creep of the bulgy core concrete in steel tube are discussed. based on a few reasonable hypotheses and the stress - strain relation of concrete acquired by the " adjusting valid modulus depending on load time " method, a compact formula is reasoned out, which is applied to calculate the equivalent elastic modulus of the bulgy core concrete considering the affection of shrinkage and creep. so, the analysis of the affection on cfst arch bridge by shrinkage and creep can be progressed by pole - girder fem, further more, the analysis precision is quite high

    本文還對核心膨脹混凝土特殊的收縮、徐變系數計算模式展開了探討,在合理的假設前提下,採用「齡期調整的有效模量法」得到的混凝土的本構關系,推導出內核心混凝土在考慮徐變影響后的等效彈性模量計算公式,並以此為基礎採用系有限元方法來對混凝土拱橋進行較高精度的收縮徐變分析。
  4. Construction technique of pressure filling concrete to still pipe inner arch of 75m span tie bar arch bridge

    拱橋拱內混凝土的壓注施工工藝研究
  5. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情況,對於五跨梁拱組合橋梁各孔跨合理的跨度比、疊拱的受力行為及連續梁系截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續梁系的剛度和應力情況、混凝土拱的應力情況。
  6. By emptying the above mentioned theoris and conclusions, this paper introduces detailedly the whole process of the compare and selection of cangzhou city gongrong road canal bridge ' s plan, design calculation and check of structure. the internal force calculation of the bridge adopts the program of plane member system ( bricas ), and it was checked by the program of brcad

    本文最後應用上述理論和結論,以大量篇幅詳細介紹了滄州市光榮路運河橋(下承式混凝土系拱橋)從方案比選到結構設計和計算、驗算的全部過程,以及施工中的要點,本橋內力計算採用平面系有限元計算程序, (交通部公規院的《橋梁設計綜合計算程序》 ( bricas4 . 0 ) ) ,並採用空間有限元程序( brcad2 . 0 )進行驗算。
  7. The software ansys6. 0 is used to analysis the stability of the state after construction of tongwamen bridge, linear method is used in analyzing the finite element model of the bridge, the coeffient of stability of different state after construction is given. on the basis, the effect of different factors such as the arrangement of lateral brace, the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed. the different coefficients of stability of changing these factors are given, so the factors that are vital to the lateral stability of x - type arches are found, and the rationality of the methods taken to enhance the lateral stability of tongwamen bridge is evaluated

    本文應用有限元分析商業軟體ansys6 . 0 ,採用線彈性方法,通過對該橋的空間有限元模型進行穩定性分析,得出其成橋運營階段各種工況下的穩定安全系數。在此基礎上,本文還通過有限元模型分析,就拱的矢跨比、吊(立柱)的非保向力效應、橋面系的剛度、橫撐布置形式、拱肋側傾角等因素對該橋整體穩定性的影響展開探討與研究。文中給出了各因素變化情況下的穩定安全系數,指出了對混凝土提籃拱橫向穩定性有顯著影響的因素及其合理變化范圍,並對銅瓦門大橋提高橫向穩定性的措施的經濟合理性進行了分析。
  8. Construction monitring for steel tube concrete arch bridge

    混凝土系拱橋施工監測
  9. Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly

    本文結合該大橋的施工實踐,對無風撐混凝土系拱橋的主要工藝施工流程進行了全面論述和總結,並重點對單片拱肋兩點整體吊裝的結構受力進行了靜力計算及對拱肋在施工和運營階段的穩定進行了分析。
  10. Modify above model along with altering structural form or the constitution of the bridge, such as different standard, steel ratio, steel pipe diameter, concrete module, brace allocation, the length of concrete of the main ribs, suspending pole mode and cable local vibrations, calculate the variety of dynamic character, analyze this factors which will affect. 2

    對斜拉拱橋自振特性進行參數分析,分別考慮了不同規范、含率、拱肋直徑、混凝土彈性模量、橫撐布置、拱肋段混凝土長度、吊形式對自振特性的影響,最後考慮了斜拉索局部振動對自振特性的影響。
  11. Technical regulation for design of steel transmission pole

    架空送電線路鋼管桿設計技術規定
  12. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    混凝土拱橋的拱軸線選用、節段彎制、節段拼接、內分隔倉、綴板設計、聯結繫系統、合龍設計及其細節、內混凝土的泵送、吊、系、纜索吊機與扣索塔架、技術規范等12個問題進行了探討。
  13. Asymmetric construction of steel pipe concrete arch rib tied arch bridge

    混凝土拱肋系拱橋不對稱施工
  14. Construction technique of back pouring of tie rod arch bridge arch rib steel pipe concrete

    混凝土系拱橋拱肋混凝土倒注施工技術
  15. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大橋為一凈跨達288米的上承式混凝土拱橋,是目前亞洲同類橋型中跨度最大的橋梁,其主拱肋採用8根920mm的,通過腹及平聯形成混凝土空間桁架,拱上立柱亦採用混凝土排架,造型新穎美觀。
  16. Fem stress analysis of springing joint for cfst and rigid frame tied through arch bridge

    下承式混凝土剛架系拱橋拱腳有限元應力分析
  17. Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good

    豐都長江大橋懸索橋採用混凝土橋塔,其常規的施工方法有滑模、翻模和爬模等幾種,本橋施工中採用了新開發的爬升架倒模新工藝,不僅節省了為橋塔施工而設計的橋塔型骨架,而且利用常規的簡易件、施工速度快,施工質量好。
  18. To investigate the practical stability performance of this bridge, a model test is carried out. the test model actually simulates nan pu bridge based on similarity criterion. the model test reveals that the stability factors is more than 2. 0, so the stability and strength of this bridge have been verified to be met with

    該模型試驗首創了「」剛度等效法,應用於混凝土桁架拱橋的模型設計和製作中,其研究成果對南浦大橋實橋的施工以及竣工后的運行有重要的應用價值,並對今後混凝土桁式拱橋的試驗研究、設計、施工具有重要的指導意義。
  19. It ` s suitable for the bend and deformation of the metal plates and it can roll the round and arcshapes and the cone ones within its specified ranges. it has the function of prebending the plate at both ends. the two lower rollers are the driving ones and can make the horizontal movement ; and the upper is a driven one and can make the up and down movement. the moving manner includes the mechanical and industry, boilers, shipbuilding, metal structure, machine manufacture and other trades, especially for the roll the steel trunks with smaller diameter and longer length in power transmission and trandform and other trades

    該機適用於金屬板材的彎曲成型,可卷制圓形,弧形和一定范圍的錐形工作,並有板材端部預彎功能,本機型兩個下輥為主動輥並可水平移動,上輥為從動輥上下移動,移動形式有機械式和液壓式,傳動軸均採用萬向連軸器連接,它廣泛適應于石油化工鍋爐造船金屬結構及機械製造行業,特別適用於送變電行業等直徑較小長度較長鋼管桿的卷制
  20. Oxygen free copper sheets, plates, strips, seamless pipes and tubes, rods, bars and wires for electron devices

    電子設備用無氧銅薄片板材帶材無縫鋼管桿材棒材和線材
分享友人