鋼索拉筋 的英文怎麼說

中文拼音 [gāngsuǒjīn]
鋼索拉筋 英文
cable brace
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : 拉構詞成分。
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • 鋼索 : steel cable; cable; cable wire; steel rope; wire rope鋼索傳動 rope transmission; steel rope drive...
  • 拉筋 : lacing wire; shrouding wire拉筋孔 lacing hole
  1. Each stay is composed of 25-5/8 in diameter dywidag bars encased in a metal sheath.

    每根由25根直徑為58英寸(16毫米)的迪威達格式粗組成,套在金屬套管內。
  2. Each stay is composed of 25 - 58 in diameter dywidag bars encased in a metal sheath

    每根由25根直徑為5 8英寸( 16毫米)的迪威達格式粗組成,套在金屬套管內。
  3. Each stay is composed of 25 - 5 / 8 in diameter dywidag bars encased in a metal sheath

    每根由25根直徑為5 8英寸( 16毫米)的迪威達格式粗組成,套在金屬套管內。
  4. There are rope bridges, arch bridges, tower bridges, cable bridges and reinforced concrete bridges

    有早期的橋、拱橋、塔橋、斜橋和混凝土橋。
  5. Secondly, the basic principle on optimal design of structure is presented. based on the characteristics of aqueduct - stayed optimal design, cable optimization, aqueduct body selection optimization and aqueduct body vertical section optimization are included. the prestresses of cable - stayed, the dimension of aqueduct and the number of reinforcing steel bar are chosen as the design variables

    根據斜式渡槽優化設計的特點,本文將槽身優化分為力優化、槽身橫斷面優化以及槽身縱斷面優化三個方面進行優化設計,確定斜預應力、槽身斷面尺寸、槽身橫向及縱向預應力鉸線配數量等槽身設計的主要變量。
  6. The test data of dongping project, which belongs to beijing - zhuhai highway at guangdong province, are given in this thesis. all the data are drawn to diagrams and compare with the theory compute results of winkler method and continue beam method separately

    本文還對東坪工點的預應力錨地梁進行了現場試驗,測試了錨外錨力,地梁土壓力以及梁內力,並繪製成相關數據表和相應曲線圖。
  7. Products are : super high pressure electric, pneumatic, manual oil pump ; pre - stress jack for the use of coal mine and construction ; steel bar and cable scissor ; all kinds of bolt for safety supporting and bolting ( km19 and km22 bolt have all got the certificate of “ ma ” in china. ) ; cable anchor and bolt test stand ; hydraulic nut scissor and etc

    產品有防爆式超高壓電動、風動、手動油泵;煤礦、建築用預應力張千斤頂;絞線切斷器;安全支護用各種錨具( km19 、 km22錨具在國內率先取得煤安證書) ;錨錨具靜載伸試驗臺;液壓螺母破切器等。
  8. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、塔和橋墩;用可考慮幾何非線性的桁元模擬斜、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張預應力和張
  9. This paper emphasizes on the construction control of concrete arch bridge, which is constructed by the precast segmental cantilever method. through analyzing this new erection method, it is considered that the cable forces directly influence the stresses of arch rib sections and the deflections of the arch axis, in addition, the stress of the arch rib section is the key factor in construction control

    本文以懸臂拼裝混凝土拱橋的施工控制為研究對象,結合工程實例,分析了大跨徑混凝土拱橋的懸臂拼裝施工方法,認為施工過程中力直接影響拱肋截面的應力和拱肋軸線的標高,拱肋截面的應力是懸臂拼裝拱橋施工控制的關鍵因素。
分享友人