鋼襯 的英文怎麼說

中文拼音 [gāngchèn]
鋼襯 英文
[核物理] steel lining; steel liner鋼襯墊 steel sleeve
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  1. Structure and performance of high boron cast steel liner

    高硼鑄鋼襯板的組織和性能
  2. The primary parts adopt steel pad f46, the pumpbody strength is high, it can resist all cauterization of strong acid and strong alkali

    的強腐蝕介質主要部件採用鋼襯f46 ,泵體強度高,能耐所有強酸強堿的腐蝕。
  3. After analyzing deformation of each cirque, with combined cirque method, pressure - bearing ratio of steel lining and rock is obtained in the condition of coincident deformation among each cirque

    並利用變形協調條件,推導出各環變形的解析解,得到鋼襯和圍巖的壓力分擔比。
  4. F - 46. lined carbon steel glassfloater level indicator

    鋼襯f - 46玻璃浮子液面計
  5. Preparation of steel substrates before application of paints and related products - specification for staurolite

    塗料和相關產品塗覆之前鋼襯底的準備工作.十字石的規范
  6. Preparation of steel substrates before application of paints and related products - specifications for non - metallic blast - cleaning abrasives - staurolite

    塗裝油漆和有關產品前鋼襯底預處理.噴射清理用非金屬磨料的規范.十字石
  7. Preparation of steel substrates before application of paints and related products - tests for the assessment of surface cleanliness - field method for the conductometric determination of water - soluble salts

    塗料和有關產品使用前鋼襯底的制備.表面清潔度評定試驗.水溶性鹽電導測定的現場方法
  8. Lining ascending pipe, glass steel liner f4 fitting

    里直管、玻璃鋼襯f4管件
  9. It is difficult to analyze combined work of underground penstock due to the gap among steel lining, concrete lining and rock

    摘要埋藏式壓力管設計中,鋼襯、混凝土圈和圍巖之間普遍存在著不連續的縫隙,致使設計計算時難以進行聯合受力分析。
  10. Considering the gap between steel lining and concrete lining as the imperfect contact, contact layer is proposed to simulate the gap in the combined work analysis

    針對這種不密實接觸問題,採用厚壁圓環組合環法,提出了在鋼襯和混凝土之間設置接觸層的鋼襯、混凝土圈和圍巖三者聯合受力分析方法。
  11. Chenban manganese steel, chromium ball processing and sales

    鋼襯板,鉻球加工銷售。
  12. In order to ascertain stress behavior of steel lined reinforced concrete pipe accurately, according to the fundamental principle of non - linear computation of reinforced concrete elements, the steel lined reinforced concrete penstock on downstream dam surface in a hydropower station is calculated and analyzed, and the distribution of circumferential stress of the steel lined reinforced concrete pipe is obtained, it proves that it is safe and reasonable to use structures of steel lined reinforced concrete penstock in hydroelectric station construction, and can satisfy the requirement of project

    摘要為了能夠準確地把握鋼襯筋混凝土管的受力性能,根據筋混凝土單元非線性計算的基本原理,對某水電站鋼襯筋混凝土壩後背管進行了計算分析,得出了鋼襯筋混凝土管環向應力的分佈情況,分佈情況說明了此水電站採用鋼襯筋混凝土壩後背管的結構形式是安全合理的,可以滿足工程要求。
  13. Standard specification for steel line pipe, black, plain - end, electric - resistance - welded

    電阻焊接黑色平端鋼襯管用標準規范
  14. Hardened - steel bushing

    淬火鋼襯
  15. Steel line blanks

    鋼襯毛坯
  16. Free - standing chimneys - part 6 : steel liners - design and execution ; german version en 13084 - 6 : 2004

    獨立式煙囪.第6部分:鋼襯.設計和施工
  17. Contact grouting at steel lining of diversion steel pipe in xin ' anjiang hydropower station

    新安江水電站1號機引水鋼襯接觸灌漿工藝及效果分析
  18. The deliberation of calculating concrete crack width for steel lined reinforced concrete penstock

    鋼襯筋混凝土壓力管道混凝土裂縫寬度計算問題的商榷
  19. However, some defects are discovered along with the extensive application of slrcp

    但是,隨著鋼襯筋混凝土壓力管道的廣泛應用,有一些問題暴露出來。
  20. Calculating crack width of penstocks with inner steel liner and reinforced concrete due to its internal pressure

    內壓作用下鋼襯筋混凝土壓力管道裂縫寬度計算公式
分享友人