錨固安裝 的英文怎麼說

中文拼音 [máoānzhuāng]
錨固安裝 英文
anchorage fixing
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  1. The test shall demonstrate to the satisfaction of the owner that the equipment meets all specified performance criteria, is properly installed and anchored, and operates smoothly throughout the specified speed range without exceeding the full load amperage rating of the motor or excessive motor heating

    測試應該讓用戶滿意,證明這些設備符合所有規定的性能標準,經過正確的,在額定轉速范圍內運行平穩,沒有超過電機的額定滿負荷運轉電流培數,或發生電機過熱。
  2. A special steel spreader beam was used to erect the fabricated cage in its proper position in the roadway structure.

    使用一個特製的鋼托架來預制的橫梁的鋼筋骨架,使其就位於上部結構內預定的位置上。
  3. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的全成型,使用柔性連接鉤進行鋼筋籠吊簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  4. Our product range covers drilling and demolition, direct fastening, diamond and anchoring systems, firestop and foam systems, installation, measuring and screw fastening systems as well as cutting and sanding systems

    我們的產品范圍涵蓋鉆孔與鑿破、直接定、鉆石與栓系統、防火與發泡填縫系統、、定位與螺絲定系統,以及切割與砂磨系統。
  5. 5 fixed protection / anchors should not interfere with nearby existing routes

    5定支點栓之不應干擾到其他鄰近的路線。
  6. 6 shipyard sort out the relevant record and fill in test report after anchor equipments and windlass test. and signed by shipyard / classification society / shipowner

    每個鏈的標記和鏈尾定情況應在前進行檢查,棄鏈器設備的檢驗應在脫勾時進行。鏈全部收好后檢查鏈在鏈艙的堆放情況是否完好。
  7. At the same time, this paper analysize the effect of mechanism of distortion of slope, the destoryed - type of slpoe, the manner of reinforcing slpoe and the charge of construction on installed angle of anchor bar

    同時本文分析了在巖質邊坡工程中邊坡的破壞機理、加方式、施工費用等對桿最優角的影響。
  8. Rebar and anchor bolts used in the pump base shall be sufficiently tied to the mounting floor to ensure a rigid, stable mounting surface for the pump unit

    泵基座所採用的鋼筋和螺栓應該能夠與地面結合牢緊密,確保為泵設備提供堅可靠的基礎。
  9. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大橋是我國第一座現代懸索橋下部結構主要包括索塔和碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜系統的,大體積混凝土的溫控防裂,主塔基礎和承臺的海上施工,塔柱滑模施工控制等
  10. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下連續墻設計過程中的鋼筋網保護層、鋼筋網接駁、鋼筋網預埋件、墻體深度、墻體接頭形式以及施工過程中鋼筋網、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  11. Install anchor to fixing bolt of dam sack of rubber dam

    橡膠壩壩袋螺栓的
  12. Standard guide for selection, design, and installation of dimension stone anchoring systems

    規格石系統的選擇設計和的標準指南
  13. Each unit anchor has its own individual tendon, its own unit fixed length of borehole, and is loaded with its own unit stressing jack which ensures that the load in all unit anchors is always identical. the total working load of the anchor is beard by each fixed anchor length of all units in staggered depth in the borehole and by means of respective bearing bodies, the tension loads applied to the plastic coated strands are changed into the compression loads on the grout of each fixed anchor length, then the total working load can be divided into several smaller loads and transmitted to the rock mass and soil in different locations in dispersed compression

    壓力分散型索是在一個鉆孔中若干個索單元,每個單元都有自己的桿體和段,在張拉時分別承受相同的工作荷載;索總的力由分散布置於鉆孔不同深度處的這些單元索的段來共同承擔,並利用各單元的承載體將無粘結索的拉力轉化為對段注漿體的壓力,從而將索總的力以壓力形式分散作用於不同深度的巖土體上。
  14. Saving the mixing and solidifying time, the new type of mechanical anchoring bolt can greatly improve the construction speed of roadway of fully mechanized working face

    同樹脂桿相比,新型機械桿節省了、攪拌樹脂和等待樹脂凝時間,大大提高了綜采工作面巷道施工速度。
分享友人