錨定土 的英文怎麼說

中文拼音 [máodìng]
錨定土 英文
anchorage earth
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用方分層對稱平衡開挖,分段挖做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. In this thesis, the technological way that prevent the anchorage pile and the concrete of anti - force beam from crazing, and the technological application of ultrasonic determine apparatus to detecting are introduced during engineering of trial pile by inducting prestressed technology to anchorage pile and anti - force frame

    論文還介紹了在試驗樁工程中,通過預應力技術引入樁及反力梁系統,防止樁和反力梁混凝開裂的技術途徑,和超聲波側壁測儀檢測技術的應用。
  3. The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor

    支擋結構體系是重慶地區經常採用邊坡支護形式之一,長期以來,人們認為樁支擋結構體系的傳力途徑是:壓力先作用於擋板上,通過擋板再傳到兩邊立柱,然後再通過桿把力傳遞給穩地層。
  4. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼拱應力、桿軸力、噴射混凝內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  5. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在開挖施工至斷層f5附近時,要使用混凝栓塞、固結灌漿、索加固及排水等措施以防止巖體失穩。右岸拱肩槽邊坡開挖過程中要採取系統固及排水防滲等措施,以防止個別潛在不穩的邊坡失穩。
  6. The pre - stressed anchor supporting structure with beam and column is analyzed theoretical in this paper, combined with theoretical study and design of such supporting structure, which is one of the plan projects of construction science and technology in hunan province. the topic provides engineering aiming with practical and concise computation method, and also provides the advice for structure with proper theory foundation and schemes to some extent

    本文結合湖南省建設科技計劃項目「永久性肋樑柱桿擋墻設計關鍵問題及計算軟體開發」 ,對預應力肋樑柱桿支擋結構進行了理論分析,提供了適合於工程的、比較簡捷的實用計算方法,同時也為該類支擋結構設計提供一的理論依據和設計建議。
  7. In this method, spaces for plant growth are separated from the anchoring bar and shotcrete structures, but they have some mutual relations in following two points : firstly, establishments for plant growth can be fixed by using anchoring bars and shotcrete ; and secondly, water for plant growth can be partly supplied by drainage holes arranged in anchoring bar and shotcrete structures

    在該方法中,供植物生長的空間(包括綠化槽、綠化盆等)與噴結構是相互分離的,但在以下兩方面又有所聯系:第一,藉助于桿和噴射混凝來固栽種植物所需的設施;第二,通過布置在噴結構上的排水孔為植物供水。
  8. The use of, cheaper, concrete blocks as anchor points is not suitable as they have a large footprint, are difficult to position precisely and tend to move if large boats are moored to them, which will cause damage to the corals

    使用價廉的混凝並不合適,原因是這些海?用大面積海床,而且不容易位,較大型船隻使用此類浮標時會移位,對珊瑚造成損害。
  9. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力板的支護機理:充分利用巖層自身或預處理的局部的穩性,隨基坑開挖分層掛鋼筋網噴射砼,以避免層幫片及巖石邊坡小的節理破碎滑塌,並把壓力傳給板,由桿集中受力,通過桿的固力平衡壓力。
  10. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱隧道支護結構體系的內力模型,即:圍巖壓力模型、初期支護鋼拱架內力(主要為軸力和彎矩)模型以及桿軸力模型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一的指導意義。
  11. The rock masses stability of hydraulic structure and geo - technical project is thoroughly studied in the theory and its application in this paper, some complicated problems in practice are solved, the physical relationship of the fractured masses and numerical simulating methods of reinforced rock masses are explored in theory

    本文就水工結構工程和巖工程中的巖體穩性問題,從理論和實踐上進行了較為深入的研究,解決了實際應用中的一些難點問題,對裂隙巖體的本構關系及固數值模擬方法進行了理論與應用探討。
  12. By the analysis of the present computational models and methods on anchor bolts, the author deems that there are some disadvantages in these methods, such as : ( 1 ) the models ca n ' t reflect the relative slide between the bolts and geotechnical mass ; ( 2 ) the division of fem mesh is too complicated ; ( 3 ) some computational parameters of the bolts are difficult to determine

    論文中,通過對目前各種桿的有限元計算模型進行比較分析,發現它們存在著如下問題:無法反映桿和巖體間的剪切?滑移作用;有限元網格劃分過于復雜;計算參數難以選擇和確等。
  13. Abstract : the structural characteristics of a three - span continuous half - through, self - anchored, concrete - filled steel - tube arch bridge are introduced

    文摘:介紹了三跨連續自中承式鋼管混凝拱橋特點,闡述了橋型布置原則及主要結構尺寸的擬
  14. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進洞的施工,堅持「護拱穩邊仰坡,大管棚注漿加固體,淺打眼、弱爆破、強支護」的原則,做到安全進洞;對于斷層破碎帶,則採取了管棚注漿,超前桿預先加固圍巖並結合鋼格柵支撐等有力措施,順利通過了不良地段。
  15. Anchored plate retaining wall

    板擋
  16. With the help of nonlinear finite element software adina, the distribution pattern and magnitude of back earth pressure of the anchor slab retaining wall with double layered anchor plate with various material parameters were analyzed, and the factors influencing the earth pressure ware discussed, also

    摘要應用adina非線性有限元軟體分析各種材料參數下,兩層板擋墻在重力荷載作用下的墻背壓力的分佈規律及大小,探討了影響壓力的因素。
  17. Durability ' s of the material such as permeability, heat - resistance, carbonation and steel bar - protection were tested. the bonding characters between anchoring material matrix and post - embedding steel bar, the matrix and the concrete structures were studied

    在植筋固長度足夠的條件下,混凝固砂漿的界面粘結強度大小直接決了植筋固的控制荷載,粘結界面成為受力的薄弱環節。
  18. Anchored sheet pile wall

    式板樁墻
  19. During the stability analysis, the safety coefficient and the most dangerous slipped layer of soil slope retained by compound soil nailing was studied. the stability of soil nailing was calculated. then, the influence functions of water, prestressed anchor and cement - soil retaining wall and front small - piles in the compound soil nailing system were studied

    在穩性分析中,研究了復合釘支護時坡穩的安全系數:介紹了最危險滑裂面的確方法並採用幾何參數控製法來確體的最危險滑裂面;計算了釘支護體時的穩性;研究了水、預應力桿(索) 、水泥攪拌樁以及超前微樁對復合釘支護時體穩性的影響作用並給出了相應的計算公式。
  20. Standard test methods for strength of anchors in concrete and masonry elements

    混凝及砌塊構件中強度的試驗方法
分享友人