錨定孔 的英文怎麼說

中文拼音 [máodìngkǒng]
錨定孔 英文
rock anchor hole
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  1. ( 4 ) diameter of bore for anchor bolt is 50mm, and diameter of reinforcing steel bar is 28mm. both break through the rules which request that the bore diameter should be bigger than the steel bar diameter trebly or not smaller than the steel bar diameter adding 50mm

    ( 4 )設計直徑50 ,筋直徑28 ,突破了規范關于直徑需大於筋直徑3倍或不小於筋直徑加50mm的規
  2. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖樁、承臺梁、地下加層及結構加固、整體結構穩等專項施工方案提出有針對性的施工技術措施,人工挖樁施工採用鋼筋砼護壁確保挖樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  3. Our product range covers drilling and demolition, direct fastening, diamond and anchoring systems, firestop and foam systems, installation, measuring and screw fastening systems as well as cutting and sanding systems

    我們的產品范圍涵蓋鉆與鑿破、直接固、鉆石與安卡栓系統、防火與發泡填縫系統、安裝、位與螺絲固系統,以及切割與砂磨系統。
  4. Application of the point reaming technique to the pull - out anchor

    位擴技術在抗拔桿中的應用
  5. In this method, spaces for plant growth are separated from the anchoring bar and shotcrete structures, but they have some mutual relations in following two points : firstly, establishments for plant growth can be fixed by using anchoring bars and shotcrete ; and secondly, water for plant growth can be partly supplied by drainage holes arranged in anchoring bar and shotcrete structures

    在該方法中,供植物生長的空間(包括綠化槽、綠化盆等)與噴結構是相互分離的,但在以下兩方面又有所聯系:第一,藉助于桿和噴射混凝土來固栽種植物所需的設施;第二,通過布置在噴結構上的排水為植物供水。
  6. Medium - sized drilling rigs for cge, including xy series core drills, gq series engineering drilling machines, mgj series anchoring drilling machines, directional drilling machines and hydraulic components etc

    系列桿鉆機和非開挖向鉆機的生產基地,也是我國點生產各種中淺液壓巖芯鉆機的中型骨幹企業。
  7. This paper respectively uses the method of expansion of cavity and fem to analysis the soil compaction effect of anchor jacked pile while sinking, and compares the calculation result of the two methods by combining effect is valuable to the application of engineering

    摘要分別用柱形擴張法和有限元方法對桿靜壓樁沉樁過程中的擠土效應進行了分析,並結合工程實例對兩種方法計算的結果進行了比較,很好地探討了沉樁擠土規律,具有一的工程實用價值。
  8. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中預應力閘墩索永存張拉噸位,首先採用方案優選的方法確主次索永存張拉噸位組合,但優選結果拉系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉系數。
  9. It was shown that the measured active soil pressures were smaller than the theoretical values and diminished with time, the measured pore water pressure decreased with the time and increased with the depth of soil, the combinative effects of cap girder and supporting structure were obvious which diminished the displacement of foundation pits, and the measured axial force of the anchor and interior steel beam were far less than the design force, indicating that the design safety factor of the foundation pit was too large to be economical

    基坑工程實行信息化施工並獲得了豐富的監測數據,通過對數據分析結果表明:實測主動土壓力小於計算主動土壓力,實測主動土壓力隨時間延長變小:土體中隙水壓力隨時間增長而減小,隙水壓力隨深度增加而呈非線性增加;基坑冠梁協同作用明顯,冠梁減小了基坑變形;索軸力比較穩,鋼撐軸力變化相對較大,且二者軸力仍富餘較大,該設計比較安全。
  10. Determination of some parameters of drilling and grouting in roadway

    巷道鉆注部分參數的確
分享友人