錨狀 的英文怎麼說

中文拼音 [máozhuàng]
錨狀 英文
anchoretform
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ名詞1 (形狀) form; shape 2 (情況) state; condition; situation; circumstances 3 (陳述事件或...
  1. As a new special bridge type, self - anchored suspension bridge has won more and more engineering ’ s favors with its beauteous build, economy performance and striving adaptability of geology and topography feathers. it has become a very competitive blue print of the urban bridge with the span from 100m to 400m

    式懸索橋作為一種特殊的橋型,以其結構造型美觀、經濟性能較好、對地形和地質況適應性強等優點,越來越受到工程界的青睞,成為城市裡100 - 400m跨徑范圍內極具競爭力的橋梁方案。
  2. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、索抗滑樁、護坡擋墻、地表排水、整坡填縫、生物防護等多種工程措施優化組合而成。治理后,在飽水有地震荷載態下滑坡的安全儲備系數為1 . 10 。
  3. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究桿在不同荷載作用下,桿的工作態從彈性到彈塑性發展的整個過程,本文進行了桿受力的模型實驗研究,根據實驗結果提出了剪應力與位移的彈塑性本構關系表達式,並根據桿受力的基本方程,求解得出了桿在不同工作態下從彈性到彈塑性滑移的全過程中桿的內力分佈。
  4. Article 28 for cases of opening kilns, burning wasteland for growing crops, lay anchor, drag anchor, fishing by using explosives or dig sand in the legally demarcated power facility protection zone thus endangering the safety of power facilities in violation of the provisions of this set of regulations, the power administrative departments shall order the violators to stop operation, restore to the original and compensate for the losses

    第二十八條違反本條例規定,在依法劃定的電力設施保護區內進行燒窯、燒荒、拋、拖、炸魚、挖沙作業,危及電力設施安全的,由電力管理部門責令停止作業,恢復原並賠償損失。
  5. He d be about eighteen now, way i figure it. the skibbereen father hereupon tore open his grey or unclean anyhow shirt with his two hands and scratched away at his chest on which was to be seen an image tattooed in blue chinese ink, intended to represent an anchor

    於是,斯基貝林出身的這位父親105用雙手扯開他那件灰色的-要麼就是臟成發灰的襯衫,滿胸脯亂撓一氣,看得出上面是用中國黥墨刺的一片錨狀花紋。
  6. Another based mathematics model about the anchor cable is used for ship - anchor system. the numerical calculation have been worked by programmed in the matlab language. at the same time the influence that the dragging speed of antisubmarine helicopter and the height over the surface of ocean acts on the shape and the tension of underwater cable, and that the current velocity and the diameter of anchor cable acts on the shape and the tension of anchor cable, has been calculated

    把建立的水下拖索數學模型和索數學模型分別應用於航空吊放聲納探頭?纜繩動力學系統和船?系統,採用matlab語言編程進行了數值計算,同時分別計算和分析了反潛直升機拖速、距海面高度對拖索形和張力的影響以及海流速度、索直徑對索形和張力的影響。
  7. Variation of bolt body strength under state of compound stress

    復合應力態下的桿桿體強度變化
  8. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  9. The fastened end of bar was machined to multi cone - shaped heads. through the cone heads compress the inorganic anchoring material, the load was transmitted from bars to base material. it changes the transfer path of loads and takes advantage of high compress strength of inorganic material, thus enhanced the anchor intensity of inorganically post - installed bars

    本文提出一種新型的植筋技術? ?帶錐頭無機植筋,它把鋼筋固端加工成多個錐頭,通過錐頭對無機固材料的擠壓,將荷載傳遞給基材,使基材與無機固材料的界面上產生剪壓復合應力態,改變傳統植筋的受力機理,利用了無機固材料抗壓強度高的特點,從而提高了無機植筋的固強度。
  10. It shows that the method suggested in the paper is simple, applicable for engineering and has good precision. on the bases of the formulas deduced, and combining with relative test datas, it studies in the paper several factors influencing the bearing performance of the simple beams, such as shape of the external tendons, the equal moment segment length, span - to - depth ratio of the beam, valid initial prestress of the external tendons, area of the internal tension reinforcement, strength of the concrete, vertical distance between

    在公式推導的基礎上,結合相關試驗資料,研究了體外筋的形、等彎矩區長度、梁跨高比、有效張拉預應力、體內受拉筋配筋率、混凝土強度、固點到樑上邊緣在垂直方向上的距離、體外預應力筋水平段長度(雙折線型體外筋的情況)以及荷載類型等對體外預應力混凝土簡支梁受力性能的影響。
  11. In tank seismic design considered the liquid sloshing, hydrodynamic pressure of tank shell, uplifting condition of unanchored tank and effective bottom plate width

    而未定儲槽的槽壁上舉態分析,應將有效上舉部分的底板列入設計考量,這些都是儲槽耐震分析的重點。
  12. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱隧道支護結構體系的內力模型,即:圍巖土壓力模型、初期支護鋼拱架內力(主要為軸力和彎矩)模型以及桿軸力模型。充分理解和闡述了構件的工作態,對今後類似隧道工程的設計和施工具有一定的指導意義。
  13. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力索的點位施加索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  14. Thus, the author attempt to develop a new model of anchor bolts so as to avoid the disadvantages. in the model, the interaction between the bolt and the geotechnical mass is taken as contact problem, in which if the tangential force at the interface has reached the limit resistance, the relative slide in the interface will occur along the tangential direction. also, the computational parameters in the model have tangible physical meanings and have less difficulty to obtain

    為此,本論文提出一種新的桿計算模型,它將桿與周圍巖土體間的相互作用作為接觸問題考慮,其計算理論比較嚴謹,能較好地模擬出桿的受力態及桿與巖土體間的剪切?滑移作用,即:桿?巖土體之間的接觸面具有抵抗強度,當接觸面上切向應力小於其抵抗強度時,桿與巖土體共同變形;達到抵抗強度時則沿切向發生相對滑動。
  15. In the tests, the maximum loads of three trail anchors reach above 600kn, one of which is 650kn, and all anchors are still in good working conditions

    試驗結果,索的最大試驗荷載在600kn以上,其中一根的最高達650kn ,且索仍處于良好的工作態。
  16. Algal anchor stone

    錨狀藻類巖
  17. According to the movable condition, divided the pipe into the totally restrained pipe and the partly restrained pipe. put forward the conception and count ways of the most friction extens for no compenstate buried pipe

    根據管道的滑動態,將管道分為固段和滑動段,提出了無補償直埋最大摩擦長度的概念和計算方法。
  18. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定態,因此建議此滑坡治理採用上部削坡減載與拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  19. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡工程復雜性和固工程的特殊性,待邊坡開挖揭示后,根據邊坡的實際地層巖性,風化程度、破碎程度、構造裂面、坡體結構和含水態等因素,綜合校核和分析判斷是否實際,對高邊坡防護加固進行動態設計,確保坡體穩定結構安全。
  20. Elastic - plastic analysis for soil around anchor jacked pile in this paper, the course of penetration is regarded as expansion of cylindrical cavity in infinite soil mass. combining with the knowledge of elastic mechanics and plastic mechanics, we can make analysis for soil around pile. finally, we can educe the cylindrical cavity pressure, radius of plastic zone, radical displacement in elastic zone, excess pore water pressure in soil around pile and spherical cavity pressure at the end of pile

    桿靜壓樁樁周土體的彈塑性分析該部分是文章的主要工作所在,本文把壓樁過程樁周土體的本構關系看作是水平面的平面應變小孔擴張問題,利用小孔擴張原理,結合彈性力學以及塑性力學的知識,對壓樁後土體的性作出分析,得出樁對土的擠擴作用力、樁周土體塑性半徑、彈性區的位移,壓樁完成瞬時樁周土體彈性區和塑性區的超孔隙水壓力以及樁端球形孔擴張的擴張力。
分享友人