錨用環索 的英文怎麼說
中文拼音 [máoyònghuánsuǒ]
錨用環索
英文
anchor strop-
Thermo protective aids, radar reflectors, rescue quoits, buoyant lines, dippers, sea anchors, oil cans, waterproof electric torches, paddles, oars, rowlocks, hatchets, brass hooks, lifeboat matches, life raft cradles, line throwing apparatus, hydrostatic release units, compasses, flares, and more.
保溫用具雷達反射器救生浮環浮索飲水罐海錨油箱水密電筒槳槳叉銅拖鉤手斧拋繩槍煙火信號防風火柴筏架靜水釋放器磁羅徑口哨The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge
提出了一種有效可行的錨跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋錨跨索股初張力精確控制的難題;建立了錨跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了錨跨張力控制系統,該系統具有穩定可靠,精度高,使用方便等特點,它的投入使用將為我國今後大跨徑懸索橋錨跨張力控制提供一種全新的、可靠的手段。Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions
摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉橋索塔錨固區節段最不利斷面在環向預應力與索力共同作用下塔壁的應力響應進行了研究。Firstly, the domestic researches, which have been reported, are introduced. then the characteristic of the system in estimation of prestressing losses is analyzed by theoretical method, and the reasons that the elimination of tendon is large and test results are not consistent are pointed. using fem software ansys, anchorage zone of pylon are analyzed
論文首先介紹了國內現階段對該問題的一些研究成果,然後從理論上分析了小半徑大噸位環向預應力體系在計算預應力損失方面的特點和造成張拉伸長量偏大且實測的數據離散性較大的原因,並採用國際權威的有限元分析軟體? ? ansys從理論上進行分析和索塔錨固區最不利節段的足尺寸模型試驗進行校驗。10 when a fixed wire / sling / rope / cord is an essential point of protection then it should be removed and replaced with fixed hanger / ringbolt / rappel / abseil anchors
當構成支點的主要元件為鐵線/扁帶/繩索/細繩時,最好將之移除,並用固定耳片/環形錨栓/下降固定點加以取代。分享友人