錨箱 的英文怎麼說

中文拼音 [máoxiāng]
錨箱 英文
anchor box
  • : 名詞(鐵制的停船設備) anchor
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  1. Discussion on technical management of overseas epc projects nct container terminal project in chittagong, bangladesh

    孟加拉吉大港新地集裝碼頭項目
  2. Thermo protective aids, radar reflectors, rescue quoits, buoyant lines, dippers, sea anchors, oil cans, waterproof electric torches, paddles, oars, rowlocks, hatchets, brass hooks, lifeboat matches, life raft cradles, line throwing apparatus, hydrostatic release units, compasses, flares, and more.

    保溫用具雷達反射器救生浮環浮索飲水罐海水密電筒槳槳叉銅拖鉤手斧拋繩槍煙火信號防風火柴筏架靜水釋放器磁羅徑口哨
  3. Supervision points on jacking up steel - box ruction of self - anchored suspension bridge

    式懸索橋鋼梁頂升施工的監控要點
  4. Based on the conceptual considerations and structural design of pingsheng bridge in foshan, the first single tower and single span hybrid girder self - anchored suspension bridge in the world, the original technical achievements of the bridge, such as those of the integral bridge tower and separated stiffening girders, the stiffening hybrid girders, structural types of steel - concrete girder joint parts, steel box girder incremental launching and hanger adjustment, are presented and the key and innovative techniques for the self - anchored suspension bridge are described in a summarized account as well

    摘要通過世界上首座獨塔單跨混合梁自式懸索橋佛山平勝大橋的方案構思及結構設計,介紹了其採用的整體橋塔分離式加勁梁橋型結構、混合加勁梁、鋼混凝土結合段構造型式、鋼梁頂推技術、吊索調索技術等原創性工程技術成果,綜述了自式懸索橋設計的關鍵和創新技術。
  5. The paper describes structural features, assembling and welding procedure of the anchor box of wuhu - changjiang great bridge

    介紹了蕪湖長江大橋錨箱的結構特點及組焊工藝,提出了控制焊接變形的幾項有效措施,以及採用該工藝收到的良好效果。
  6. Based on the research of influenced parameters on constant and varying depth solid web box girder before, the shear lag aroused by the parameters including width - span ratio, outstanding flange on base slab and the position of the tendons are further studied. the investigation show that shear lag values diminish along with the decease of width - span ratio and the departure from the symmetrical axis of anchor position, but outstanding flange is contrary to the former

    在前人對等截面、變截面實腹梁剪力滯效應影響參數研究的基礎上,本文進一步對腹板開孔的連續梁的寬跨比、底板翼緣伸出以及預應力固位置改變等參數對梁剪力滯的影響進行研究。
  7. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、體澆築、主纜架設、梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  8. Each bundle of strands is connected to one side of the center web of the two cell box girder.

    每束鋼纜固在雙梁的中間腹板的一側。
  9. They piped oil into storage tanks from ships anchored offshore

    他們從近海處拋停泊的船隻上以管道輸送油于貯藏內。
  10. Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete

    本文結合實際工程,詳細分析了鋼圍堰的構造、錠系統的布設、纜的計算、鋼圍堰的製作及組拼、鋼圍堰的接高與下沉、水下混凝土封底等圍堰施工的重要內容;並對常用的鋼套施工技術進行了討論。
  11. The 4, 000 - year - old timbers were found alongside equallyancientcargo boxes, anchors, coils of rope and other navalmaterials justas old, at what archaeologists are calling a kind ofancientmilitary administration site

    除船板外,這些遺物中還有古代船隻上運送貨物用的成卷的繩索以及其他航海用具。
  12. The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier

    摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型鋼吊圍堰採用工廠整體製造,下河浮運至墩位,利用墩施加預拉力精確定位的施工新工藝。
  13. Switchgear cubicles for a. c. windlasses and automatic mooring winches in ships

    船用交流起機自動系泊絞車控制
  14. The designing principles were discussed. the calculation relating to the constructional type, frame, body, floating and gravitational forces, anchoring system and etc. was studied

    摘要本文論述了鐵木結構網系統的設計原理,提出了網結構型式、框架、體、浮沉力、定系統等的設計與計算方法。
  15. With the designing and building of yichang yangtse river highway bridge, a single - span suspension bridge with main span of 960m, some technical problems such as the layout of structural system of the suspension bridge, the type of cross section of stiffening steel box girder, the structural system of the anchor and the cracking - resistant techniques of the bulky concrete anchor have been studied in the present thesis. some valuable conclusions have been achieved that provided a substantial support for the successful completion of the bridge. the thesis contains five chapters

    本文以湖北宜昌長江公路大橋(主跨為960m的單跨懸索橋)的設計與施工為背景,對大跨懸索橋設計與施工中的若干問題如懸索橋結構的合理布置、加勁鋼梁斷面型式的合理選取、碇結構的合理確定以及碇大體積混凝土設計與施工的綜合防裂技術等進行了研究,取得了一批富於實用價值的研究成果,為宜昌長江公路大橋的順利建成提供了卓有成效的技術支持。
  16. The 4, 000 - year - old timbers were found alongside equally ancient cargo boxes, anchors, coils of rope and other naval materials just as old, at what archaeologists are calling a kind of ancient military administration site

    據認為,迄今為止,這是考古學家發現的世界上最古老的航海船遺物。除船板外,這些遺物中還有古代船隻上運送貨物用的成卷的
  17. ( 4 ) two component anchor bolt and dowel are afforded, a formulas to calculate the punching capacity of this slab - column connection with the effect of punching component is given in the article. comparing with other kinds, the two punching component is effective. ( 5 ) the possible destroy patterns of this slab - column system are discussed in the text, and design principle and step in detail about slab - column connection are

    ( 4 )提出抗沖切栓和銷釘兩種新型抗沖切元件,給出配置抗沖切元件時板柱節點的承載力計算公式;通過比較表明,這兩種新型抗沖切元件對薄壁體現澆混凝土空腹板來說是有效的。
分享友人