鑒定試驗試件 的英文怎麼說

中文拼音 [jiàndìngshìyànshìjiàn]
鑒定試驗試件 英文
qtc
  • : Ⅰ名詞1 (鏡子 古代用銅製成) ancient bronze mirror2 (可以作為警戒或引為教訓的事) warning; objec...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 鑒定 : 1 (評語) appraisal (of a person s strong and weak points) 2 (評定) appraise; identify; auth...
  • 試驗 : trial; experiment; test
  1. However the analysis of both location and dispersion effects in unreplicated factorial experiments with censored data has not been studied widely. hamada and wu ( 1991 ) proposed a iterated method to estimate location effect under the condition of homogeneity of variances

    Hamada和wu ( 1991 )給出了此條別和估計位置效應的迭代演算法,但由於其模型假點同方差,因此不能分析散度效應。
  2. Abstract : analyzing the general method of temperature screening for assembly in our country, combined with the experience of accelerated testing abroad, we proposed a definition method of parameters, such as temperature range, rate of change of temperature and dwell time. in this paper, we introduce some experience in a temperature screening of a mainboard

    摘要:分析了目前國內在組溫度篩選方面的一般做法,吸收國外加速的經,並借量篩選中根據成效率確無故障檢時間的方法,提出了組溫度篩選中各參數(如溫度范圍、溫度變化速率、高低溫保持時間和循環數)的確方法,並以一種稅控加油機主板的溫度篩選為例,介紹了組溫度篩選方法研究中所總結的一些經
  3. Present methods generally based on the statistics of earthquake damage, expert experiences, theory analysis and experimental researches have obvious advantages, disadvantages and certain scopes of application ; ( 2 ) different prediction methods should be adopted against different building conditions, sites, intensity and experiences etc to predict earthquake damage of buildings for prospective accuracy, dependability and availability ; ( 3 ) earthquake damage matrix, which is the foundation of earthquake damage prediction, of 7 kinds of building in the urban areas of zhangzhou city under intensity 6 to 9 has been set up. the damage conditions of different buildings under different intensity are as followings : all kinds of structures are basically intact under intensity 6 ; the reinforced concrete structures are basically intact under intensity 7, but other kinds of structures are destroyed slightly ; the reinforced concrete structures are still basically intact while other kinds of structures are destroyed intermediately under intensity 8 ; the reinforced concrete structures are destroyed slightly, single - story factories and open houses are destroyed intermediately and other kinds of structures are destroyed seriously under intensity 9 ; ( 4 ) the results of earthquake damage predicting of buildings embody the damage when earthquake happens in the future. thus, further identifications and reinforcements should be considered to buildings that will be destroyed intermediately or more under the earthquake with 10 % exceeding probability in future 50 years ; ( 5 ) the direct economic losses caused by damage of buildings resting with the area, structural type, intensity and damage of all kinds of buildings are the main part of the losses of the city in an earthquake ; ( 6 ) the direct economic losses increased progressively toward high intensity by 2 or 3 times

    基於上述研究,得出的主要結論有:建築物震害預測是一個模糊的、系統的、復雜的問題,現有的方法很多一般都是以震害統計規律、專家經、理論分析和研究為依據,有其自身的優缺點和一的適用范圍;應針對不同的建築物條、場地條、地震強度和已有經等,採用不同的預測方法進行建築物震害預測,以使預測結果達到預期的精確性、可靠性和可操作性;建立了漳州市區7類建築物在6度9度地震作用下的震害矩陣,成為指導抗震防災的重要依據,各類結構的震害情況表現為: 6度地震作用下各類建築物基本完好; 7度地震作用下除鋼筋混凝土結構基本完好外其餘以建築輕微破壞為主; 8度地震作用下鋼筋混凝土結構仍以基本完好為主而其餘建築以中等破壞為主; 9度地震作用下鋼筋混凝土結構以輕微破壞為主,單層工業廠房和空曠房屋以中等破壞為主,其餘建築以嚴重破壞為主;建築物的震害預測結果體現了未來地震來臨時的震害程度,在編制漳州市區抗震防災規劃時,對于遭遇50年超越概率10的地震影響發生中等以上破壞的建築物應考慮進行抗震和加固;由建築物的破壞所造成的直接經濟損失是城市地震經濟損失的主要部分,重慶大學碩士學位論文中文摘要其主要與建築物總面積、結構類型、地震烈度和各類建築物的震害程度有關;不同烈度造成的直接經濟損失按2一3倍向高烈度方向遞增,漳州市區直接經濟損失由6度至9度的比例關系為1 : 2 . 8 : 8 . 6 : 22 . 8 ;遭遇基本地震設防烈度( 7度)時,漳州市區直接經濟損失約4 . 5億元,無家可歸人員約40000人,且以磚木結構和多層磚混結構的震害損失最大;地震造成的人員傷亡主要與建築物倒塌及嚴重破壞的程度和總面積以及震時的建築物室內人數密切相關,地震時無家可歸人員主要與住宅倒塌、嚴重破壞及中等破壞的程度和總面積以及城市人均居住面積密切相關。
  4. By low - cycle and reverse horizontal loading test, their properties including strength property, deformation property and energy property are studied. we study the loading characteristic values ; the property of hysteretic curve and skeleton - frame curves ; the ductility property and stiffness degradation. lastly, based the data got from the test, this paper analyses and value the seismic behavior of every members

    基礎上,研究了軸心受壓構的承載力計算和穩問題;研究了低周反復水平加載條下,彎剪構和整體空心墻板的強度、變形、能量特性;軸壓構的荷載特徵值;彎剪構和整體空心墻板的滯回曲線、骨架曲線、延性等參數;從強度、變形和能耗等方面判別和各構的抗震性能,對各個構給出了的結論、評價。
  5. The thesis mainly recounts the detail questions about bayesian small sample theory and the important applications of the theory in engineering, and gives sufficient analyses and discussion of every step of accomplishing a precision evaluation when using small samples. in the thesis, the following issues are contained, such as how to get and denote the prior information, the consistence test of prior information and test samples of shooting range, the fusion of multi - source information, calculating of posterior probability, estimation with bayesian approach, how to constitute test evaluation project of different performance and calculate the risks of both sides are contained, and at last a kind of applied method to calculate the effectiveness is given

    論文主要敘述了有關bayes小樣本理論的一些具體問題,以及該技術在工程中的一些關鍵應用,對小樣本條下精度的各個環節給予較充分的分析和討論,其中包括前信息的獲取、表示,前信息和靶場樣本的一致性檢,多源信息的融合,后概率的計算, bayes方法在估計中的應用,方案的制,對不同戰標的評估方法和風險的計算等,最後對作戰效能的計算給出了一種工程中較實用的方法。
  6. In this thesis, the critical components of pcs are analyzed and tested in detail. i present the scheme of reliability qualification test of capacitors, furthermore, analyze the sampling inspection scheme theoretically for capacitors and put forward the proposals to improve this scheme. for most of components in pcs with high reliability or long lifecycle, which need great investment of time and material for their reliability tests, this paper provides a new and effective statistical method for this kind of components - the progressive stress accelerated life testing with exponential distribution

    可靠性也是可靠性工程的重要組成部分,能源系統許多元器為高可靠性、長壽命器,且大部分是非標準器,為保證整個系統的可靠性,必須對備選元器進行可靠性,本文對能源系統關鍵器進行了詳細的分析,給出了電容器的方案,對其抽樣方案進行了理論分析並給出了方案改進建議。
  7. Industrial projects refers to the major projects and accessory facilities completed which result in forming production capacity and have been checked and accepted while the living and welfare facilities have been completed and can ensure normal production and formally put into production

    工業項目是指設計文形成生產能力的主體工程及其相應配套的輔助設施全部建成,經負荷運轉,證明具備生產設計規合格產品的條,並經過合格或達到竣工收標準,與生產性工程配套的生活福利設施可以滿足近期正常生產的需要,正式移交生產的建設項目。
  8. In the simulator test, the artic1e gives the method for superposition of two different phrase and unrelated load spectrums and the method can be used to solve the same question latter

    在模擬中,文章採用工程方法對兩種不同相位、不相關的載荷譜迭加問題進行了處理,這對今後碰到此類問題有一的借作用。
  9. Technology of non - damage test for concrete intensity is extensively applied in project testing, as a precise and direct approach. accordingly, the test in this essay makes use of average concrete samples made up of commo - n raw material in boutou, and adopt comprehensive method of ultrasonic elasticity to test the concrete used within one year in boutou. through the regression analysis, we get the regression equation of anti - intensity of these two materials under the given conditions. according to the result, we establish the accurate curve line for comprehensive method of ultrasonic elasticity and provide practiced and non - damage testing approach and calculating method for concrete intensity test and reference for testing staff concerned

    混凝土強度無損檢測技術作為一種簡便快捷準確的測強技術在工程檢測中得到了廣泛的應用,於此,本次通過採用包頭地區常見原材料製成的一批量常見齡期的不同種類(指混凝土塊中的粗骨料、混凝土強度等級不同)普通混凝土標準塊,採用回彈?超聲綜合法對包頭地區齡期不超過一年的現場混凝土進行了大量的,並利用回歸分析,給出兩種骨料混凝土在相應測強條下的立方體抗壓強度回歸方程,根據實結果建立包頭地區精度較高的混凝土回彈?超聲綜合法基準測強曲線,為實際工程的混凝土現有強度評提供簡單易行的無損測方法和計算方法,供有關檢測人員參考使用。
  10. How to accomplish the evaluation properly has been a key problem of the developing and testing department under the circumstances of small samples

    小樣本條下如何較好的實現已成為研製和部門關注的焦點問題。
  11. Welding and allied processes - qualification testing of brazers for safety joints on fuel gas distribution pipework - joining of fuel gas pipework in fuel gas plants located downstream of the general cut - off device

    焊接和相關工藝.氣體燃料配送管道上安全接頭用銅焊的合格.位於通用切割設備下游的氣體燃料設備中氣體燃料管道的連接
  12. Specification and qualification of welding procedures for metallic materials - welding procedure test - finishing welding of aluminium castings

    金屬材料焊接過程的規范和.焊接過程.鋁鑄的精焊接
  13. Road vehicles - electromagnetic compatibility test procedure of automotive components - part 6 : qualification of the immunity to narrowband interference according to the current injection procedure

    道路車輛.汽車部的電磁兼容性程序.第4部分:根據通用噴射程序窄帶抗干擾性的合格
  14. Road vehicles - electromagnetic compatibility test procedure of automotive components - part 5 : qualification of the immunity to narrowband interference according to theabsorptive chamber procedure

    道路車輛.汽車組的電磁兼容性規程.第5部分:根據吸收室規程進行抗窄帶干涉性的合格
  15. A method of temperature - rise assessment by extrapolation for partially type - tested assemblies of low - voltage switchgear and controlgear

    低壓開關裝置和控制裝置部分用的外推法溫升
  16. Sectional specification : microwave modular electronic units of assessed quality - part 2 : index of test methods ; german version en 160200 - 2 : 1997

    分規范.經質量的微波模塊電子組.第2部分:
  17. For the parallel analysis, several interfaces have been developed, on one hand, in order to parallelize the existing serial fea codes and make the system practical, some parallel solver library has been integrated into ooparafea ; on the other hand, ooparafea can also integrate self - developed module into its analysis kernel, in fact, it has already integrated parallel cg solver and parallel pcg solver up to now. in webfea, just like other parts in netfeaf, the class hierarchy ( including two dimension fea class library, three dimension fea class library, internet based fem computer aided instruction and so on ) is introduced first, and the control center which integrated httpserver ( used for building internet project web site ) and computingserver ( dealing with different computing tasks ) takes charge of the whole system. netgrawcad is the application of netfeaf in civil engineering, which offers civil engineers a network based works

    論文還開發了全新用途的網路服務中心,包括http服務器、計算服務器,以及各種用途的計算客戶端:利用java語言的網路通信、界面處理能力結合集群的密集并行計算能力一起完成特的計算任務,從而使集群計算與web計算很好的集成在一起; webfea作為一種應用客戶端,配合netfeaf集成系統的各個計算組成部分,可以實現一個比較全面的有限元分析方法的計算機輔助課;當前基於web的各種應用越來越廣泛,但將基於網路的工程設計與有限元分析系統的面向對象構建其引入有限元分析以及土木工程設計領域還不多,基於netfeaf系統,作者又利用面向對象的方法實現了基於網路的重力式碼頭cad集成系統,以從根本上改變傳統的工程分析設計軟體的運行思路,使網路變成土木工程師的日常工作中心,系統部分成果通過(文通部為「國內領先,可以大大提高設計效率,建議在水運行業內盡快推廣使用」 )推出后的良好用效果,使面向對象的方法在土木工程分析設計軟體系統研製中的優勢得到進一步證。
  18. Specification for capability approval for custom - built capacitors and capacitor modules : generic data and methods of test

    製電容器和電容器模的性能規范.通用數據和方法
  19. Aerospace - qualification test of brazers - brazing of metallic components

    航空航天.釬焊工能力.金屬元釬焊
  20. A method of temperature - rise assessment by extrapolation for partially - tested assemblies of low - voltage switchgear and controlgear ; amendment 1

    低壓開關裝置和控制裝置部分用的外推法溫升.修改1
分享友人