長出了水泡 的英文怎麼說

中文拼音 [zhǎngchūshuǐpāo]
長出了水泡 英文
on the soles of her feet
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 了助詞1. (用在動詞或形容詞后, 表示動作或變化已經完成) 2. (用在句子的末尾或句中停頓處, 表示變化, 表示出現新的情況, 表示催促或勸止)
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 泡Ⅰ名詞1 (氣泡) bubble 2 (像泡一樣的東西) sth shaped like a bubble Ⅱ動詞1 (較長時間地放在液...
  • 長出 : send forth; come into leaf [bud]: 春天一近 樹上長出了嫩葉。 as spring approaches the trees begin ...
  • 水泡 : water vacuole; bladder; bleb; bubble; blister
  1. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    試驗方法因其應用時間較,目前已積累較豐富的經驗,但在閉試驗時,管道兩端砌築磚堵、抹防層、養護、灌,以及試驗后的放、磚堵拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺的地區以及頂管施工的無壓管道,這些矛盾更加突;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。
  2. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對江三峽庫區特殊的地質環境與工程實際情況,在充分考慮對庫岸滑體穩定性影響的前提下,提一個適用於江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下位升高降低滑坡體的有效應力,另一方面是由於地下期浸降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析作用於三峽庫區滑坡體上的力系和庫位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或期降雨狀態) 、 175m庫位、地震以及庫位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結10種典型計算工況,並具體給相應的作用荷載的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  3. Based on physical simulation and numerical simulation, the conversion of hot water slug flooding with nitrogen foam is presented and some injection indices are optimized, including foam concentration, gas - liquid ratio, injection rate, temperature of water, slug length. from reservoir research and oilfield development, studying disadvantageous factors, the paper will have guilding value for heavy oil reservoir development of leng 43 block

    對熱+氮氣沫段塞驅的關鍵技術指標,包括沫劑濃度、氣液比、注入速度、注溫度和段塞度等重要參數進行優選,提速度80 100t d 、氣液比1 : 1 、注溫度95 100 、溶劑濃度0 . 5的推薦方案。
  4. St. peter had to lead the tailor out of the gate and because the tailor had worn soles and therefore blistered feet, he took hold of a stick and headed off for waitingville where devout soldiers sit with empty jugs, and happily while away the time

    聖彼得只得帶他去門外,因為那位裁縫鞋底都磨破,腳上滿,他便拿給他一根手杖,前往等待之村,忠誠的士兵們窮極無聊地找樂子打發時間,身上帶著空罐。
分享友人