長堰 的英文怎麼說
中文拼音 [zhǎngyàn]
長堰
英文
changyan-
Impact of bayou weir construction at nagarafawa river estuary on water quality and ecological environment of nagarafawa river in japan
長良川河口堰的建設對長良川河流的水質及生態環境的影響Do poineering work up to now, the company already held water shenzhen, guangzhou, zhuhai, dongguan, chengdu, wuhan, nanning, nanchang, changsha, xiamen, wen zhou, 10 lasher, le qing, reach without more than 20 branches such as stannum, north human relations, ci xi, baoan more than 10 concessionary, the household industry that formed wide cloth whole nation serves network and powerful service to support power
創業至今,公司已成立了深圳、廣州、珠海、東莞、成都、武漢、南寧、南昌、長沙、廈門、溫州、十堰、樂清、無錫、北倫、慈溪、寶安等二十多家分公司及十余家特許經營、連鎖加盟店,形成了廣布全國的家居產業服務網路和強大的服務支持力量。Hydraulic experiments on long water supply pipelines connected to overflow weirs
長輸水管道尾部保水堰的水力特性試驗研究Wujiang minglilai gloves co., ltd. is located at meiyan town, wujiang city - the center of shanghai, suzhou, huzhou, jiaxing, enjoying convenient land - and - water transportation
吳江市名利來手套有限公司座落在吳江市梅堰鎮,位於長江三角洲的中心,東臨上海西連湖州,南接嘉興北鄰蘇州。Through being developed for nearly half a century, automobile industry of the whole province has formed a industrial pattern focusing on dongfeng automobile company supported by defense industry enterprises and local enterprises, entire vehicle products covering complete supporting for medium vehicles, heavy duty vehicles, light duty vehicles, sedans, midget vehicles, special vehicles and auto parts, and automobile belt and components belt alongside han river from shiyan, xiangfan, suizhou to wuhan and changjiang river from jingzhou to huangshi have been formed
經過近半個世紀的發展,全省汽車工業已形成了以東風汽車公司為主體,軍工企業、地方企業為依託,整車產品涵蓋中、重、輕、轎、微、專及汽車零部件配套齊全的產業格局,形成了從十堰、襄樊、隨州到武漢沿漢江沿線和從荊州到黃石沿長江沿線的兩條汽車及零部件集聚帶。Back to business, this long scimitar in qing dynasty is quite different from the large thing at the same time
話說回來,這清矍修長的堰月和肥碩的清代物還是有教大區別的Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985
自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier
摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型鋼吊箱圍堰採用工廠整體製造,下河浮運至墩位,利用錨墩施加預拉力精確定位的施工新工藝。Abstract : the steel cofferdam used for the construction of the main pylon of junshan changjiang river highway bridge is designed as a combination of circular - form and special form in one unit to satisfy the different requirements in different construction - stages
文摘:武漢軍山長江公路大橋主塔墩鋼圍堰巧妙地將圓形和異形結構結合在一起,以滿足不同施工時期的需要。Beijing - chinese engineers tuesday blew up a temporary barrier used during construction of the three gorges dam, unleashing the full force of the yangtze river upon the world ' s largest hydroelectric project
周二中國工程師爆破拆除三峽大壩建設工程的臨時圍堰,世界最大的水力發電工程三峽大壩開始接納全部長江江流。( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron
主要設計內容包括:計算上游圍堰后消力池的尺寸;驗證泄洪初期壩面高程是否能夠滿足消能防沖需要;計算下游圍堰堰頂高程,使其滿足泄洪期圍堰和壩體過流的消能防沖和工程進度的需要;計算部分斷面平均流速,包括:上游圍堰后消力池中收縮斷面的斷面平均流速;壩首和壩末的斷面平均流速;當下遊河道發生水躍時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長度。With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge
摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大橋北汊水中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各墩位平臺及圍堰的方案比選,總結了該橋深水鋼圍堰的施工方法。Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage
渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。The intermediate magnesium - clad slag guard wire is produced through advanced process of non - cement pouring featuring corrosion resistance, high temperature resistance, good heating stability and long service life etc
中間包鎂質檔渣堰採用無水泥澆注的先進工藝,具有耐侵蝕、耐高溫、熱震穩定性好、使用壽命長等特點。The three gorges dam will be the largest hydropower station and dam in the world, with a 1. 2 mile stretch of concrete and a 370 mile - long reservoir and 525 feet deep
工程完成後,三峽將成為世界上最大的水力發電站,擁有1 . 2英里長的混凝土縱向圍堰、 370英里長、 525英尺深的水庫。Steel wall cofferdam construction of the no. 3 main tower pier for tianxingzhou yangtze river bridge
天興洲長江大橋3號主塔墩鋼吊箱圍堰施工分享友人