間洪期 的英文怎麼說

中文拼音 [jiānhóng]
間洪期 英文
interflood period
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  1. The summer flood season was subdivided into main flood season and post - freshet season by many methods such as the mathematical statistics method and fuzzy analysis method. the flood control risk in spring was analyzed by the qualitative analysis

    本文根據水出現時,將水庫的汛分為春汛和夏汛,並採用成因分析、數理統計、模糊分析等方法又夏汛細分為主汛和后汛
  2. Abstract : this paper an outline of the national fund project, bridges " s safety prediction and behavior simulation under the multi - phase coupling actions by flood water. the authors approach coupling action models among solid, liquid and gas states, while discussing bridge rupture features under these coupling actins. as one important problem of the project, physical and simulation model are discussed too in the paper. all the discussion in the paper can be a guide to deep research of the project

    文摘:本文系國家自然科學基金資助項目《橋梁抗禦災異相耦合破壞作用的安全性預測與模擬》研究綱要的縮影,筆者對災害伴生過程中各物相(固態、液態、氣態)之耦合作用形態及對橋梁破壞性認識,以及對耦合作用物理模型、模擬模型的初步探討,以為該項目研究的展開和向縱深推進提供借鑒
  3. The eni of el nino events is expressed by using differences of sea surface temperature in the area of equatorial east pacific 010s, 90180w. based on eni s definition, 25 el nino events and 26 la nina events from 1870 to 2000 are defined. and the starting and ending time of 1997 s strong el nino event is predicted six months ahead of the event by using eni s three periodical overlapping prediction method. the prediction offers great support to the accurate prediction of the flush flood occurred along nenjiang river in 1998

    使用赤道東太平洋010s , 90180w海水表面溫度sst距平值表徵厄爾尼諾拉尼娜事件指數eni 。根據eni定義出1870 - 2000年25次厄爾尼諾事件和26次拉尼娜事件,採用eni三周疊加預報模式提前6個月預測出1997年強厄爾尼諾事件的開始和結束時,為較準確預測出1998年嫩江特大水提供了預報依據。
  4. The iron rings are for the local citizens to tie their boats during flood time

    騎樓外的磚柱上,鑲嵌有圓形的鐵環,以供作系船之用。
  5. In the middle of the hongwu period, the trade was on and off, and sometimes out of order

    問題最多的是武中前後,表現形式為官方貿易時斷時續,有失常態。
  6. The summer flood reason is the key period for reservoir controlling flood and achieving benefit because this stage is longer and the volume of flood is larger

    對水庫春汛的防風險進行了定性分析。水庫夏汛時長,量大,是水庫確保防安全和實現興利效益的關鍵時
  7. Therefore, his omnipotence in some way does reflect the weakness of the movie. perhaps it ll better satisfy our curiosity or make the story little more persuasive if the origin of his supreme ability is well unfolded in the end, but it s not the case. throughout the movie we only know dong - shik is invulnerable, but we are never told why he is so powerful, or how he is able to possess his ability. in fact, there are several parts in the middle that attempt to bring in some hints, but then all of these clues are left unanswered.

    影片中段曾經數次作出一些暗示性的筆觸,令觀眾待結局將會十分出人意表,以為班長會如hye - jin所言是外星球來的王子,或者如hye - jin同事mi - seon ( kimka - yeon )所言,他有過失蹤三年之謎,可能曾受傷昏迷后得到超能力,甚至能和雀鳥溝通,可這一切一切,原來都只是編導整人的騙局,都是有頭無尾的過場戲,那當觀眾看到最後,就不免會有點失望了,而班長這個角色的神秘感,亦變得蕩然無存。
  8. Perhaps it ll better satisfy our curiosity or make the story little more persuasive if the origin of his supreme ability is well unfolded in the end, but it s not the case. throughout the movie we only know dong - shik is invulnerable, but we are never told why he is so powerful, or how he is able to possess his ability. in fact, there are several parts in the middle that attempt to bring in some hints, but then all of these clues are left unanswered.

    影片中段曾經數次作出一些暗示性的筆觸令觀眾待結局將會十分出人意表以為班長會如hye - jin所言是外星球來的王子或者如hye - jin同事mi - seon kim ka - yeon所言他有過失蹤三年之謎可能曾受傷昏迷后得到超能力甚至能和雀鳥溝通可這一切一切原來都只是編導整人的騙局都是有頭無尾的過場戲那當觀眾看到最後就不免會有點失望了而班長這個角色的神秘感亦變得蕩然無存。
  9. Therefore, his omnipotence in some way does reflect the weakness of the movie. perhaps it ll better satisfy our curiosity or make the story little more persuasive if the origin of his supreme ability is well unfolded in the end, but it s not the case. throughout the movie we only know dong - shik is invulnerable, but we are never told why he is so powerful, or how he is able to possess his ability. in fact, there are several parts in the middle that attempt to bring in some hints, but then all of these clues are left unanswered

    影片中段曾經數次作出一些暗示性的筆觸,令觀眾待結局將會十分出人意表,以為班長會如hye - jin所言是外星球來的王子,或者如hye - jin同事mi - seon ( kimka - yeon )所言,他有過失蹤三年之謎,可能曾受傷昏迷后得到超能力,甚至能和雀鳥溝通,可這一切一切,原來都只是編導整人的騙局,都是有頭無尾的過場戲,那當觀眾看到最後,就不免會有點失望了,而班長這個角色的神秘感,亦變得蕩然無存。
  10. Rivers which drain areas of red clay soils become highly colored during times of flood.

    流經紅色粘土土壤區域的江河在水泛濫河水帶上很深的顏色。
  11. Ebinur every stream in the north, merely possess the a little flood water in the summer season to go into the sun dry little lake district, makes the little water area, and the water evaporates in briefly time to to be lost

    艾比湖北部各小河,只在夏季有少量水進入乾涸的小湖區,形成小面積的水域,而且在短時內蒸發散失。
  12. " to get from a trickle to a reasonable flood can take weeks.

    「從滴流到一定規模的水,這中要花上數個星。 」
  13. Reliability analysis of levee overflow against wind wave of hongze lake at high water

    澤湖大堤防風浪漫溢的可靠性分析
  14. Teams who have modelled the climate in the area are warning of greatly reduced snowpacks and more intense flooding as temperatures inch up during the 21st century

    對該地區氣候進行了模擬研究的科研小組警告說,在21世紀,隨著氣溫的逐漸上升,積雪場將大幅度減少,水泛濫將更為嚴重。
  15. Ming dynasty, sliced bread district court has not yet fully formed, sliced bread, the family village level interaction model that in the dynasty years in sales growth period, basic to court, sliced bread secondary form of interactive campaign to qing dynasty " hong dry time " period before a fill scale and rapid into court with the family of the village of interaction between secondary mode

    明朝時,土司區尚未完全形成朝廷、土司、家族村社三級互動模式,這種模式在明武年處于發育,基本以朝廷、土司的二級互動形式進行運動,到清朝「康乾盛世」時才形成蔚為大觀的規模,並迅速轉化為朝廷與家族村社之二級互動模式。
  16. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區交通線路災害的特點、分類、時和空分佈規律以及災害的防治原則和對策等;然後,以水災害對交通線路的毀壞為主線,重點研究和分析了以下幾個問題:第一,探討了水對交通線路的破壞方式,水毀原因以及水毀機理,並提出了交通線路水毀防禦系統框架和對策;第二,分析了雨季邊坡塌方災害的區段預測方法;通過可視化編程,編制了雨季邊坡塌方災害的工點預報程序,並結合arcview實現了預測結果的可視化;第三,對路基沉陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型對路基沉陷區進行分析和預測,最後論述了arcview軟體及其擴展模塊在沉陷區研究分析中的應用;第四,對汛庫區線路災害的原因進行了分析,並探討了利用數量化理論對路基防護工程抗能力進行預測的意義;第五,提出從風險的角度對交通線路的防災減災進行管理,對風險估計的相關問題進行了論述,並探討了交通線路水害危險區段的劃分問題。
  17. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?水流達時、區水預報、渡汛風險、汛預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區水預報方案和調度方法,為公伯峽水電站施工建設提供技術支撐。
  18. Based on analyzing discharge data in guide, xunhua, tongren hydrologic station and river course character, propagation time of different discharge in different river course is presented, and prediction period of interval flood, main stream flood during construction and operation period are acquired

    通過對貴德、循化、同仁水文站流量資料以及河道特性的分析研究,得出不同流量在不同河道上的傳播時,歸納出區水和幹流水在施工和運行的預見
  19. Between january 1996 and may 2004, wong, who was under the supervision of hung, had paid for prostitution services, calculated at about 300 a week, for hung

    一九九六年一月至二四年五月的下屬黃茲灝每星一次為被告嫖妓支付約三百元。
  20. Between january 1996 and may 2004, wong chi - ho, a senior cook of the restaurant who was under the supervision of hung, had paid for prostitution services, calculated at about 300 a week, for hung

    一九九六年一月至二四年五月的下屬,即資深廚師黃茲灝,每星一次為被告嫖妓支付約三百元。
分享友人