閘坡 的英文怎麼說
中文拼音 [zhápō]-
Finally, the renovate of dong gou lock improve navigation circumstance of vessels and it will minimize ship ' s collision and cargo damage accident and it also has advantage of low cost, low pollution, environment friendly, good view of nearby circumstance and so on. shen wei ( communication transportation ) directed by. answering date : mar 28th 2002
第三、東溝船閘改造改善了船舶運行條件,將減少過閘船舶的船損和貨損事故;將有利於充分發揮內河運輸運運量大,成本低,污染小的優勢;並能興水利、除水害、防止岸坡坍塌和水土流失,保護耕地,綠化環境,美化景觀,具有良好的社會效益。Stability analysis on the high slopes of three - gorges shiplock using flac - 3d
進行三峽船閘高邊坡穩定分析Analysis on monitoring results of locked anchor - bar stress at tgp permanent lock s vertical slope
三峽永久船閘直立坡鎖口錨桿應力監測分析The construction of inclined ship elevator is one of the key technical problems in the project of shupu river estuary sluice
摘要戍浦江河口大閘料坡式升船機工程是該工程所攻克的主要技術難題之一。The reason to creates this kind of destruction to be very many, the main of them is that the apron partially has not been able fully to display it to eliminate energy affect so causes the ditch bed to wash out, forms flushes the pit, leading to the apron, to guard against flushes the trough and both banks slope protection destruction, for a long time, disappear power design of plunge basin and layout have been focused on disappear power. but not to give the enough value on uses the sea to inundate the section to disappear power and adjust speed to reduced downriver washes out
水閘閘下沖刷破壞的部位絕大多數發生在消力池下的海漫和防沖槽處,造成這種破壞的原因很多,其中很大一部分是由於海漫部分未能充分發揮其消能作用而引起渠床沖刷,形成沖坑,導致海漫、防沖槽及兩岸護坡的破壞。一直以來,人們把消能的研究重點放在消力池的消能設計及平面布置上,而對海漫段消能及調整流速功能研究甚少,至於對海漫加糙水流運動建立數學模型,在國內外還很少見相關的論文資料。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。After excavation, there are concentration phenomenon of stress at the corner or the shiplock room, and the tension zone lies in half of the middle part as well as the part of the two slopes to the lower part of the upright wall. finally the analysis results are compared with site monitoring data in period of construction as well as the feedback reports, the result of all comes to meet with each other very well
開挖完成後,在閘室拐角處存在不同程度的應力集中現象,中隔墩上部1 2的巖體及南北邊坡至直立墻頂部平臺以下的部分巖體為拉應力區。在兩側邊坡及邊墻的塑性區出現在損傷區和部分卸荷影響區內,中隔墩大部分區域的巖體都進入了塑性狀態,閘室底板處的塑性區基本上與損傷區一致。And the conclusion can be obtained thatrafter excavation, the horizontal deformation increased continuedly with the depth of excavation. while the whole deformation takes on a tendency of nearly horizon and slightly downward. the middle part of the shiplocks maintains the state of unloading feedback during the excavation, when the excavation is finished, it expands toward two sides
本文研究發現開挖完成後閘室直立墻和南北邊坡的巖體水平方向變形隨著開挖深度的下降而不斷增大,開挖完成後的總體變形表現為近水平略向下。中隔墩在開挖過程中,始終處于卸荷回彈,開挖完成後,中隔墩向兩側張開。Multiple - index assessment for global stability of high - steep rock slope of the three gorges project permanent shiplock
三峽永久船閘高陡邊坡整體穩定性的多因素綜合評價In this paper, studies are profoundly made on the actual detecting problems happened in the topic of " acoustic emission monitoring of the slope stability of the permanent ship lock for the three gorges "
本文在「長江三峽永久船閘邊坡穩定性聲發射監測」課題基礎上及實際檢測中面臨的問題進行較深入而有針對性的研究。Creep characteristic and long - term stability of rock mass in ship lock high slope of the three gorges project
三峽船閘高邊坡巖體時效特性及長期穩定性分析Zhapo is the most famous scenic spot in china
閘坡是一個非常有名的旅遊景點。The bike brakes don ' t work. if you ride downhill, you ' ll be tempting fate
這輛自行車的閘不靈了。你要是騎著它走下坡路,那你就是玩命呢。In this thesis, the unloading region of a typical cross section of shiplock slope of tcp is given, that is 15570 according toin - situ test and geological survey. considering the effects of excavation unloading, numerical analysis for shiplock slope is made by fem and flag. using the theory and software described in this thesis, the excavation analog and the stability analysis of the typical cross section of the three gorges shiplock high slope has been carried out
本文選取三峽工程永久船閘邊坡的典型剖面15570剖面,根據現場試驗和地質調查確定的卸荷范圍,考慮卸荷帶巖體力學參數隨開挖過程而變化,採用二維彈塑性有限元法、二維彈塑性顯式有限差分法進行了邊坡施工開挖數值模擬。Interface element method and criterion for stability analysis of high slopes in three gorges shiplock
三峽船閘高邊坡穩定分析的界面元法與評判準則The high rock slope of permanent shiplock is important part of the three gorges project. this article analysed comprehensively the engineering geology condition, deformation and stability of the high rock slope
以三峽永久船閘高邊坡工程為研究背景,結合前期勘測和一、二期開挖施工實際,綜合分析了永久船閘工程地質條件、邊坡變形及穩定性等。An improved voltage adjusting model with scr is used in this control system. by regulating the amplitude of ac motor ' s voltage, it implements voltage - slope start, current - limit start, soft - stop
本控制系統採用晶閘管調壓方式,採用模塊式設計思想,用定子調壓方式實現了電動機的電壓斜坡起動、限流起動、軟停車等功能。分享友人