閘襯 的英文怎麼說
中文拼音 [zháchèn]
閘襯
英文
brake-shoe lining-
Another important aspect in the manufacture of these valves is the clearances at the critical metal interfaces ( wedge / body guides, stem / back seat bushing, etc. )
這種閥門的製造中的另一個重要方面是關鍵金屬表面(楔形閘板/閥體導向,閥桿/后閥座襯套,等等)的之間的間隙。Road vehicles - brake linings - compressive strain test method
道路車輛.制動閘襯.壓縮應變試驗方法Road vehicles - brake linings - shear test procedure for disc brake pad and drum brake shoe assemblies
道路車輛.制動閘襯.圓盤制動塊和鼓式閘瓦組件的剪力試驗程序Brake lining grinder
閘瓦襯帶磨光器Lining wedge type gate valve, softly seal gate valve
襯里楔式閘閥、軟密封閘閥Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。Cotton brake lining
閘帶棉襯Brake lining rivet
閘襯鉚釘Brake lining refacer
閘襯光面器The hydraulic oil pressurizes the large - surface contact areas, which are equipped with special brake lining, onto the guide rail via a piston mechanism
液壓油(配備了專用制動閘襯)通過活塞機構將大表面接觸區域壓至導軌上?Test procedures for brake shoe and lining bonds
閘瓦和制動襯片粘合劑試驗程序分享友人