防滑試驗 的英文怎麼說

中文拼音 [fángshìyàn]
防滑試驗 英文
skid resistance test
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 防滑 : antiskid; anti-skidding
  • 試驗 : trial; experiment; test
  1. Testing of lubricants ; testing of anticorrosion oils for internal combustion engines in respect of acid neutralizing properties, hydrobromic acid immersion test

    劑的.對內燃機腐油酸性中和性能的.氫
  2. 05. 02 test method for fretting wear protection by lubricating grease

    脂磨損侵蝕方法
  3. Standard test method for corrosiveness of lubricating fluid to bimetallic couple

    雙金屬電偶用潤腐性能的標準方法
  4. Practice for reporting slip resistance test results

    防滑試驗結果報告慣例
  5. Standard practice for reporting slip resistance test results

    防滑試驗結果報告的標準實施規范
  6. Smooth tire for pavement skid - resistance tests

    鋪砌路面防滑試驗用標準光輪胎
  7. Detailed contrastive simulation tests of four - phase and self - optimalizing abs control have been made and applying effects of self - optimalizing control are discussed, which establish stable principle foundation for self - optimalizing control applying to realistic abs controller. from the simulation results we can find that : automobiles which install self - optimalizing abs apparatus lock on the any road surface only when the vehicle body velocity and wheel velocity arrive at zero approximately, which is better for improving driving stability under braking. it shows anti - lock ability of self - optimalizing ; slip ratio approximates and surround the desired slip, which shows that this abs system uses fully road surface performance and retains large adhesion and braking performance is good ; braking force regulates with varies of road condition, which realizes road self - identification

    通過模擬可以看出:在各種路面上,汽車在安裝了自尋優抱制動裝置后,在車速、輪速接近為0時才抱死,這對提高汽車制動時的操縱穩定性特別有利,顯示了自尋優避免車輪抱死的能力:移率的值基本上一直接近並且圍繞著與路面附著系數相對應的移率上下變化,說明了該系統充分利用了路面性能,基本上保持了較大的附著力制動,制動性能較好;制動力隨著路面條件的變化而相應做出調整,實現了路面自動識別的功能。
  8. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化研究;大壩基礎深層抗穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  9. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化研究;大壩基礎深層抗穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  10. Standard test method for skid resistance measurements using the north carolina state university variable - speed friction tester

    使用北卡羅來納州大學變速摩擦儀作測量的標準方法
  11. A grease / carbon steel panel exposure associated with salt spray tests was recommanded to evaluate the weathering and corrosion prevention performance of greases

    本文建議以脂碳鋼抹片曝露配合鹽霧以評估其耐候蝕性能。
  12. A series of measurements including volatile matter content, water spray resistance, salt fog resistance and atmospheric exposure tests of 15 lubricating greases were performed

    摘要本研究分別以脂揮發物含量、耐水沖性、鹽霧、室外曝露等多種測評估15種市售與自製脂之耐候與蝕性能。
  13. A solid - waste containment system can be simplified as a slope which contains a layer of geomembrane ( which is simplified as interlayer slope in the rest part ). shaking table model test and numerical analysis have been done to study the seismic stability of interlayer slope based on the two - part wedge theory in this paper. many factors which affect the slope stability ratio, including horizontal seismic coefficient, slope angle, soil - geomembrane interaction coefficient, slope length, layer thickness and soil character, have been took into consideration

    填埋場滲基坑的邊坡可以簡化成含土工膜夾層的土坡(以下簡稱夾層土坡) ,本文根據「雙楔體」理論思想,對夾層土坡的地震穩定性問題進行了較為系統的模型和數值分析,著重考慮了水平地震系數、夾層土坡坡角、土工膜與覆蓋層土體摩擦系數、夾層邊坡長度和厚度、夾層土坡覆蓋層土體性質等因素對土坡安全系數的影響,並對地震作用下夾層土坡的永久變形進行了初步的研究,給出了對實際工程設計有參考價值的結論。
  14. Standard specification for standard rib tire for pavement skid - resistance tests

    鋪砌路面防滑試驗用棱紋輪胎
  15. Test methods for measurement of skid resistance on paved surfaces using a passenger vehicle diagonal braking technique

    裝有對角制動設備的客車在鋪砌路面上的防滑試驗方法
  16. Skid resistance test

    防滑試驗
  17. Personal protective equipment - footwear - test method for slip resistance ; german version en 13287 : 2004

    個人護設備.鞋靴.防滑試驗方法
  18. Safety, protective and occupational footwear for professional use - test method for slip resistance

    專用安全護和職業鞋靴.防滑試驗方法
  19. Safety requirements for cableway installations designed to carry persons - carriers - slipping resistance tests for grips

    載人用索道裝置的安全要求.運載裝置.夾緊裝置的防滑試驗
  20. Safety requirements for cableway installations designed to carry persons - carriers - part 2 : slipping resistance tests for grips

    載人用索道裝置的安全要求.運載裝置.第2部分:夾緊裝置的防滑試驗
分享友人