防滲結構 的英文怎麼說

中文拼音 [fángshènjiēgòu]
防滲結構 英文
seepage prevention
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算果表明,如果能使錦屏工程引水隧洞灌漿圈圍巖具有較好的性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護以及排水措施,使灌漿圈圍巖成為主要承載,並使襯砌和灌漿圈共同承載,是可以保證圍巖的穩定和支護安全的。
  2. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道排水設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。
  3. Permeable durability reinforcing agent used for concrete surface is a material sealing surface of concrete, and it can permeate into inner of concrete and fill or block the pores of concrete surface with dry crystal or emulsoid generated by reaction between it and chemical compound in concrete

    混凝土表面用透型耐久性增強劑是一種針對混凝土表面的透封閉型材料,其可入混凝土內部,並通過乾燥晶或與混凝土內部相關物質反應生成乳膠體將混凝土表層的孔隙填充、堵塞,對已有混凝土護具有重要意義。
  4. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體工程,為設計文件規定的該工程的合理使用年限; 2 、房屋水工程、有水要求的衛生間、房間和外墻面的漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  5. Based on the research works of predecessor, the theory on the displacement of soil strata in deep foundation excavation construction and its application are studied in detail. by analysing the supervision, statistics from, the practical excavation engineering, soil rheology is thought to be the main reason of the displacement heavy of the soft soil and the destruction of the enclosure structure, in deep foundation excavation construction on condition of the high theriomorphic of enclosure structure and good seepage resitting

    本文在已有研究成果的基礎上,對大面積軟土深基坑開挖時土層變位理論及應用進行了探討:依據現場監測數據,推導出開挖時軟土變形的經驗公式,分析了軟土深基開挖在圍護剛度大、基坑效果好的條件下,基坑土層變位、圍護受力破壞發展的主要原因。
  6. The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet - grouted cutoff wall at the toe of the dam form a vertical anti - seepage system for the dam foundation

    大壩軸線附近的墻、基巖固和帷幕灌漿,以及上游壩腳處的高壓擺噴墻,在壩基成了垂直體系。
  7. The jet - grouting has little change to dam structure. its construction is simple and lower cost, it has evident advantage to form dam foundation diaphragm - wall

    高噴灌漿技術對壩體的原影響較小,施工較簡單,工程造價相對較低,對病險壩加固具有較明顯的優越性。
  8. Design of demolition blasting of complicated structure of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰砼墻復雜拆除爆破設計
  9. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓流場點虛流量法的基礎上,合可精細模擬密集排水孔復雜流水力行為的改進排水子技術,付某地下廠房廠區洞室群圍巖區三維流場進行了有限元求解分析,著重研究了排水系統中的帷幕和排水幕的流特性。
  10. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩餘量、地下水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯砌型式的凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、凍脹效果好的乾渠襯砌型式,即混凝土板下鋪設聚苯乙烯板和砂礫石換填層型式,加以優化設計,用於工程實踐。
  11. Composite geomembrane used for impervious structure of seawall engineering

    復合土工膜防滲結構在海塘工程中的應用
  12. In this paper, for the bonding between the sling screw - thread - based and composite hull based on the underwater weapon composite, the bonding structure design, process design and leakproof technology between the load - bearing metal parts and composite hull are studied. with the further investigation on tensile test of the sling screw - thread - based the common technology of bonding between load - bearing metal parts and composite hull is obtained, which establishes the experiment and theory base for the technology of underwater and deepwater weapon in china

    本文以水下兵器為背景,以某型號雷體吊耳螺紋座與復合材料殼體的膠接為研究對象,著重進行了金屬承力件與復合材料殼體的膠接設計、工藝設計、膠接技術的研究,並進行吊耳螺紋座拉力試驗研究,最終獲取了水下兵器用金屬承力件與復合材料殼體連接形式的共性技術。
  13. Tianjin underground railway building. tianjin underground railway building is located at haiguangsi street, it ' s 143m high, and it has being built, the underground sturcture has 3 floor, which is one of the deepest underground structrue which embed in the ground around 10m. this project is using our material for internal waterproof

    天津地鐵大廈位於天津和平區海光寺附近,設計高度為143米,該工程正在建造過程中,地下為三層,採用利砼牌水泥基晶型水材料作為單一水材料做內水,該深入地下十幾米,為天津市內較深的地下
  14. Practice in seepage prevention structures of roller - compacted concrete dams

    碾壓混凝土壩防滲結構型式的工程實踐
  15. Prevention and cure methods of the underground building concrete construction seeps into the aqueous

    地下建築混凝土漏水的治方法
  16. With non - destructive testing technique ( ndt tech ), such as sound wave, electromagnetic and laser scanning, and at the same time, from the prevention - treatment ideas of tunnel health as the springboard, the healing technique is developed with pertinence to leakage and crack damage of the underground engineering supporting structure, and it has important practical value to guide the engineering practice

    合目前主要的聲波、電磁波和激光掃面等無損檢測技術,從隨道健康的治理念出發,開發了針對地下支護漏與裂損的康復技術,對指導工程實踐具有重要的實用價值。
  17. ( 4 ) the seepage prevention structures and drainage structure is very important for the safety and stabilization of rcc dams, so their effects is discussed in this paper to the seepage field ' s characteristics of rcc dams, moreover, the seepage control schemes of rcc dam is analyzed

    ( 4 )碾壓混凝土壩的與排水對于大壩的安全與穩定極為重要,本文研究了各種與排水技術對大壩流場特性的影響作用,並分析了各種與排水方案的特點。
  18. Adopt raduce shock structure low noise, washingand dewatering pass stable. need not base, adope import seal washer. good to sealing up. it had feeding equipment. modelling beautiful, strong and durable

    設備採用力學,噪音低,洗滌高脫過渡平穩,無需打地基。採用進口密封圈,無漏,有加料裝置,造型美觀。洗滌織物潔凈度高,去污徹底,不損衣物。
  19. The rolled asphalt rock - fill dam with concrete core is one of new impervious structures in the rock - fill dams. it has very high imperviousness with ability to fit the deformation and it is easy to organize the construction

    碾壓式瀝青混凝土心墻壩是土石壩的一種新型防滲結構,具有性,能好、適應變形能力強、易於施工等特點。
  20. With the project performance this article introduces some - works on pac under the following aspects : - - - advantages of pcrd construction in the cold district, more durability, reliability and crack resistance of the pac core than concrete facing slab ; - - - mix design, criteria of material selection, relationship between aggregate segregation and mix proportion ; - - - test and study on deformation and strength of the pac

    本文合實際工程進行了如下幾方面的工作: 1 )分析了澆築式瀝青混凝土心墻堆石壩在寒冷地區施工的優勢,其防滲結構的耐久性、可靠性、抗裂性等方面性能均優于混凝土面板。 2 )確定澆築式瀝青混凝土施工配合比,確定對原材料的選擇原則,探討骨料離析與配合比的關系。
分享友人