防滲透幕 的英文怎麼說

中文拼音 [fángshèntòu]
防滲透幕 英文
staunching plate
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (滲透; 穿透) penetrate; pass [seep] through 2 (暗地裡告訴) tell secretly; let out; lea...
  • : 名詞1 (覆蓋用的布、綢、氈子等; 帳篷) covering cloth silk or felt; tent 2 (掛著的簾子) curtain...
  • 滲透 : 1 [物理學] [生理學] osmosis2 (液體從細小空隙中透過) permeate; seep; permeation; seepage; inflow...
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和性能,對趾板進行了固結和帷灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  2. Combining achievements in past scientific research, this thesis summarizes some problems in the process of decreasing water, the problems contains : important parameters such as percolation coefficient, interfering radius etc ; designers get parameters from their experience and make their choice of limited prospecting materials too simply, because of the limits, designer ca n ' t make quantitative analysis on groundwater ; differences on breakwater effect of setting water - tight screen is still existed, although research evolvement in this field is done ; they ca n ' t grasp the hydrogeology parameters accurately in that it influences rightness of designing in deep excavation water - decreasing

    本文結合以往的研究成果,總結了降水過程中存在的一些問題,主要包括:重要設計參數,如地層性、基坑降水影響半徑等,設計中僅從個人經驗出發取值,對有限的勘探資料進行取捨和過分地簡化。這些局限使設計者不能對地下水進行科學的定量分析,盲目性較大;深基坑降低承壓水引起的周邊地面沉降的研究雖已取得很大的進展,但是一些主要問題仍未解決,對的實際擋水效果存在不同看法;對於弱水層的水文地質參數一直難以準確把握,影響了深基坑降水設計的正確性。
  3. Through analyzing the seepage observation data of huangtankou concrete gravity dam, foundation seepage behavior are reasonably evaluated. the reason of seepage force rising of individual monolith is impervious elements " flaw and drain holes " block. 4

    分析黃壇口大壩壩基流監測資料,正確評價了壩基排水系統的工作狀態,指出了個別壩段壓力升高是由於壩基缺陷和排水孔被堵造成,為工程加固提供了科學依據。
  4. For example, after the collapse of ditong dam in idaho, may 5, 1976, it was found that it was not impervious very well, the impervious curtain was built poorly. when the seepage went through the impervious curtain, the exit water from the pervious material of the downstream or the right side of dam through the foundation or certain line between the foundation and the dam caused contact scour and piping

    如美國愛得華州提堂壩於1976年5月5日潰決,事後調查分析,因壩基水性大,施工質量差,流穿,經地基或地基與壩的接觸面從壩體下游側水料區逸出或從右壩肩繞經下游壩體逸出,出逸的水流引起了接觸沖刷和管涌,導致潰壩。
  5. Some conclusions are drawn and suggestions put forward, which provide a good basis for safe operator of dam. fourthly, with the optimized seepage coefficient, the seepage state of dongzhang dam foundation and effect of grouting are appraised by comparing several different seepage control schemes, and then some seepage control measures are concluded

    4 、對東張水庫大壩壩基體的流參數進行了優化反演分析,用優化反演得出系數來評價地基流性態及帷效應,在此基礎上對不同控方案進行對比研究,提出了控加固措施。
分享友人