陸連的 的英文怎麼說

中文拼音 [liùliánde]
陸連的 英文
landtied
  • : 陸數詞(六的大寫) six (used for the numeral 六 on cheques, etc. to avoid mistakes or alterations)
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : 4次方是 The fourth power of 2 is direction
  1. The main contents include : water environment, marine sediment and the trend monitoring of marine life quality ; at the same time, to consolidate the monitoring of the functional zones, such as seashore bathing places, oceanic reserves, marine aquafarms ; to set up the seashell monitoring and controlling zones in the sea areas of both pingtan and yunxiao at the first time ; to carry out the statistical monitoring of polder, exploiting sea sand, spartin aallerni flora, terrestrial sewages, etc., to carry out monitoring of the total quantity of pollutants into the offshore marine areas in the min river, the jiulong river as well as the municipal sewages of xinlin industry in xiamen and jiaocheng in ningde ; to carry out the red tide monitoring in the offshore marine areas of fujian province ; to implement time - lapse, pointing and continuous red tide monitoring of high frequency and high intensity in the sandu gulf, the min river estuary and offshore marine areas of xiamen

    主要內容包括水環境、海洋沉積物和海洋生物質量全海域環境趨勢性監測,同時加強了海水浴場、海洋保護區、海水增養殖區等功能區監測;首次在平潭和雲霄海域設置了貝類監控區;開展了圍填海、海砂開采、互花米草、源排污口統計監測;並在閩江、九龍江、廈門杏林工業排污口、寧德蕉城市政排污口鄰近海域開展污染物入海總量監測;在全省近岸海域開展赤潮監視監測,對三都灣、閩江口、廈門近岸海域赤潮監控區實施高頻率、高密度定時定點續監測。
  2. The grenville - aged orogen is a tie to link most of the continental blocks in rodinia, which existed during the period from late mesoproterozoic through early neoproterozoic

    Grenville期造山帶存在於中晚元古代,是接rodinia各紐帶。
  3. It is the overlapping reg - ion of round - the - bohai economic region and the yellow rivereco - nomic band and an important gate between the two large economic districts of north east and the central plains both in the sea and on the land

    北靠京津塘經濟區,南山東半島,經濟開發區,是環渤海經濟區和黃河經濟帶結合部,也是海接東北和中原兩大經濟區重要通道。
  4. Chinese american soldiers of the u. s. army signal corps are photographed on parade before being deployed to the cbi theater of operations

    美國軍通訊兵中美士兵在部署中緬印軍事行動戰場之前在閱兵場閱兵。
  5. These results supply a gap in study on. results of sensitive experimentations reveal that the deflection of tc track increases, while variation of tc pressure is same as experiment b, if the height of zhoushan archipelago terrain doubled. if bigger islands of zhoushan archipelago are set as a part of mainland, the deflection of tc track is same as experiment b, while weakening of tc pressure is fast than experiment b. these result also confirm main mechanisms of terrain effects

    敏感性試驗blz和bmz結果表明,舟山群島地形高度增加一倍后,熱帶氣旋接近舟山群島時運動路徑南偏程度要增大,但強度變化與試驗b相似;將舟山群島中幾個較大島嶼與大結成一體后,熱帶氣旋接近舟山群島時運動路徑南偏程度不變,但強度減弱卻比試驗b快。
  6. Regarding natural sand of the spot as model sand, using series model, and under the interaction of irregular wave and tidal current, a systematic test on scouring around pile of land - island approach bridge of jiangsu lng receiving station is carried out

    摘要以現場天然沙為試驗床質,利用系列模型,採用不規則波與潮流相結合方式,對江蘇lng接卸站島橋樁基周圍沖刷情況,進行了系統試驗。
  7. Shipbuilding. roll on roll off ship - to - shore connection. interface between terminals and ships with straight stern bow ramps

    造船工業.滾裝船和接.直線形船尾船首接坡道船與終點港間接裝置
  8. To restrict the displacement at stiffening girder ends under action of earthquake and to ensure that the girders will not cause too fast movement speed towards the expansion joints lest the joints should be damaged, the constraint devices are intended to provide for the girder ends of xihoumen bridge, the zhoushan mainland and islands link project

    摘要為限制地震作用下加勁梁梁端位移以及使梁體不對伸縮縫作用過大速度以免損害伸縮縫,計劃對舟山大島工程西堠門大橋設置梁端約束裝置。
  9. In recent years, the solid traffic net with waterway, roadway and air - line has been developed greatly. inland when it refers to the connection between waterway and roadway or roadway and roadway, usually it is bridge or tunnel, but most of them are bridges

    近年來,我國由水路、路、空運所形成立體交通網已得到了巨大發展,其中在內涉及到水路和路二者相便是橋梁或隧道,但以橋梁居多。
  10. For the main bridge of xihoumen bridge of zhoushan mainland and islands link project now being constructed, the fluid viscous dampers are also to be used

    正在修建舟山大島工程西堠門大橋主橋也計劃採用液體粘滯阻尼器。
  11. In this paper, from the angle of seismic resistance, the parametric sensitivity of the fluid viscous dampers to be used for the bridge is studied in details, and relevant proposals for the dampers are made as well

    從抗震角度對舟山大島工程西堠門大橋主橋液體粘滯阻尼器參數敏感性進行了詳細研究,並提出建議。
  12. Impact of zhoushan island - land project over zhoushan passenger transport market

    舟山大島工程對舟山客運市場影響
  13. Lianyungang port, the world renowned eastern headbridge of the new eurasian continental bridge, offers the shortest path for the foreign trade and export of the middle and north - west china. the railway from lianyungang, going west across our middle areas alongside longhai line, lanxin line, beijiang line, and connecting eurasia through the railway network of former soviet russia and west - europe, provides the shortest railway transportation between pacific and atlantic seacoast

    雲港港是我國中原和西北地區最短路徑出海口岸和對外貿易口岸,也是世界著名亞歐大東方橋頭堡,從雲港沿我國隴海、蘭新、北疆鐵路向西,橫穿我國中部,通過原蘇聯與西歐鐵路網接亞歐大,提供了太平洋和大西洋沿岸最短鐵路運輸。
  14. Guangdong and guangxi which are accessible from waters in the vicinity of hong kong

    及其他在廣東和廣西與香港鄰近水域相水域。
  15. To facilitate traffic, designer build it clear bridge link with land, make it become thousand island only of island that land and water linked to in the lake specially

    為便於交通,設計者特建天清大橋與地相,使其成為千島湖中唯一一座水島嶼。
  16. Pwsc endorsed a commitment to upgrade 787th to category a at an estimated cost of $ 58. 9 million in money - of - the - day ( mod ) prices to employ consultants to undertake an investigation study for the section of the proposed hzmb between the boundary of hong kong and the landing point at northwest lantau, i. e. hong kong section ( hks ), and the connecting road with the north lantau highway, i. e. north lantau highway connection ( nlhc ), and to develop a conceptual design for the hks of hzmb as well as a preliminary design for nlhc

    工務小組委員會通過一筆承擔額,把787th號工程計劃提升為甲級,按付款當日價格計算,估計所需費用為5 , 890萬元,用以委聘顧問進行勘測研究,范圍包括建議港珠澳大橋位於香港邊界至大嶼山西北部?一段橋梁,即香港段該部分橋梁,以及通大橋香港段與北大嶼山公路北大嶼山公路接路,即北大嶼山公路接路,並進行港珠澳大橋香港段概念設計工作及北大嶼山公路接路初步設計工作。
  17. A convoy is a move of an army in one a coastal land province to another by a fleet or a chain of fleets in adjacent water spaceprovinces

    運輸是從一個沿海省份通過相艦隊鏈把軍運輸到另一個沿海省份。
  18. He scanned the horizon, looking for land

    他細看天水相地方,尋找
  19. The new bridge will link the island to the mainland

    橋梁將把該島與大接在一起。
  20. The capital and largest city of guinea, in the southwest part of the country on the atlantic ocean. it is on an island connected with the mainland by causeway. population, 600, 000

    科納克里城幾內亞首都和最大城市,位於該國西南部大西洋沿岸。它坐落於一個通過堤道和大島嶼上。人口600 , 000
分享友人