隧道內線路 的英文怎麼說

中文拼音 [suìdàonèixiàn]
隧道內線路 英文
line in tunnel
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1. (內部; 里頭; 里邊) inner; inside; within 2. (妻子或妻子的親屬) one's wife or her relatives 3. (姓氏) a surname
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Monolithic roadbed track maintenance in tunnel

    整體的養護辦法
  2. According to time of operation, the buses are divided as follows : numbers that start with " 2 " are morning and evening rush hour buses, numbers that start with 3 are night buses ; according to location, buses are divided as follows : puxi buses, pudong buses, buses that cross the river including tunnel and bridge lines, and suburban area buses [ 700s & 900s ] ; according to payment method, the buses are divided into : single - ticket rmb 1 ( lines of 13 kilometer or less from end to end ) and rmb 1. 5 ( lines of 13 kilometers or more from end to end ) ticket - sellerless buses ( most two digit city buses and three digits buses starting with " 1 ", " 2 ", " 7 " are of this kind ; no change will be made, but terminal stations and hubs will have rmb 1 and rmb 1. 5 ticket booklets for sale, 50 non - refundable tickets per booklet ), and also single ticket rmb 2 air - conditioned buses and scaled - price ticket special lines ( including specialty coach lines starting with " 5 ", pudong specialty lines starting with " 6 ", mid - size coaches that start with " 8 ", double - decker buses and air - conditioned coaches that start with " 9 ", as well as the ten air - conditioned tourism lines [ and airport buses ] )

    按運營時間分,有:日間公交車、 「 2 」字頭的早晚高峰車和「 3 」字頭的夜宵車;按地域范圍分,有浦西的、浦東的、過江的(含大橋、)和郊區;按票務方式分,有單一票價1元(全程13公里以下的)或1 . 5元(全程超13公里的)的無人售票車(市公交號碼為兩位數的或三位數中「 1 」字頭、 「 2 」字頭、 「 7 」字頭的絕大多數是無人售票車,自備零錢,不找零,公交終點站、各主要交通樞紐均有1元和1元5角兩種面值的公交預售票出售,每本50張,售出不退) ,還有單一票價2元的空調車和多級票價的專車(有「 5 」字頭的大巴專、 「 6 」字頭的浦東專車、 「 8 」字頭的中巴專和「 9 」字頭的雙層車或空調大巴,還有十條空調旅遊專) 。
  3. Tunnel alignment with the boundary control facilities within a cavern system

    在洞穴系統設跨界口岸設施的
  4. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場黑水河溝進口滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上進洞所發揮的作用。
  5. It is bounded by the lion rock mountain ( sze chi shan ) and tate s cairn ( tai lo shan ) to the north ; the kowloon peak ( fei ngor shan ) to the east ; new clear water bay road and prince edward road east to the south ; and junction road and lion rock tunnel to the west

    北面以獅子山及大老山為界,東臨飛鵝山,南接新清水灣及太子東,西連聯合及獅子山。本區現有三條跨區公、多條連接區各處的區域干和兩條行車(指其南面的出入口而言) 。
  6. To improve the network coverage for passengers and to make the most efficient use of resources, kmb implemented the bus - bus interchange scheme at tai lam tunnel with effect from may 1998

    為擴大和善用資源,九巴自一九九八年五月起,在大欖實施巴士轉乘計劃。
  7. By analyzing the relation between the train passing capacity and tunnel length as well as tunnel slopes the upper and lower limits for installing mechanical ventilation in railway double track tunnel have been determined, which provides science foundations for the formulation the ventilation design norm for railway double track tunnels in operation

    通過對列車通過能力與長度和坡度關系的進一步研究,得出了燃牽引雙設置機械通風的上、下界限,為雙運營通風設計規范的制訂提供了科學依據。
  8. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵專用五龍溝1 ~ # 、 2 ~ #采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #兩側一定范圍(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。
  9. Unidirectional light emitting products eye guiding devices for use in expressway tunnels,

    視向性發光產品高速公的視誘導裝置
  10. It has been reported that the alignment of the kowloon southern link ( ksl ) proposed by the kowloon - canton railway corporation ( kcrc ) is 50 metres away from the hong kong cultural centre ( hkcc ), and that kcrc will provide a special double - floating track slab inside the tunnel sections along salisbury road to ensure that the facilities of the adjacent hkcc do not suffer noise or vibration in excess of statutory limits

    據報,九廣鐵公司表示擬興建的九龍南環距離香港文化中心50米,而該公司會在該沿梳士巴利一段的裝設一套特殊的雙重浮動軌平板,以確保毗鄰的香港文化中心設施所受的噪音或震動影響,不會超出法例標準。
  11. What are the major land uses on criii ? a19. major land uses on criii include a wide waterfront promenade, the new star ferry piers and public piers, a " comprehensive development area " site for low to medium rise commercial development with pedestrian landscaped deck, a " government, institutional or community " site, some waterfront related commercial and leisure uses and key transport infrastructure including road p2 at grade, cwb underground, airport railway extended overrun tunnel and nil underground

    中區填海第三期工程所得土地的主要用途,包括寬闊的海濱長廊新的天星碼頭及公眾碼頭"綜合發展區"的中低高度商業樓宇及園景行人平臺"政府機構或社區"用地與海傍有關的商業及休憩用地以及主要運輸基建設施包括p2網地面中環灣仔繞地下機場鐵掉車的延部份及地鐵港島北地下。
  12. This paper discusses the design of the tunnel, and the main contents are the line route simulating, the conformations of lining rings, the structure design and waterproofing

    闡述了該的設計概況,主要容包括:盾構擬合,襯砌環的構造形式,管片的結構設計和結構防水。
分享友人