  1. In - situ testing study on lining system of double - arched tunnel

    雙連體系現場監測試驗研究
  2. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連結構體系的內力模型,即:圍巖土壓力模型、初期支架內力(主要為軸力和彎矩)模型以及錨桿軸力模型。充分理解和闡述了構件的工作狀態,對今後類似工程的設計和施工具有一定的指導意義。
  3. Tunnel vault and the surface of the side wall, play a firing prevention and heat insulation protecting roles, prevent the armored concrete reducing its intensity when the temperature rapidly heating up because of fire, avoid the tunnel from exploding and protect effectively the lining reinforcing steel bar not to lose supporting capacity so as to avoid the tunnel collapsing

    防火塗料塗噴在內的頂和側壁的表面,起防火隔熱保作用,防止內鋼筋混凝土在火災中迅速升溫而降低強度,避免混凝土炸裂、有效保襯內鋼筋不會失去支撐能力而避免垮塌。
  4. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平必須按「管超前,嚴注漿,多分部、短開挖、強支、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
  5. When there is original stage support only, the load ratio of surrounding rock gets more and more bigger with the increasing of crust stress, correspondingly, the load ratio of initial stage support gets smaller. when the initial stage support and the second support act each other, the load ratio of surrounding rock is more than fifty percent, and it has little change with the increasing of crust stress. the whole analysis of the surrounding rock and support shows that the bottom arch of liner and the feet of liner have serious stress concentration, so do the sidewalls and the foot of a wall of the surrounding rock

    通過屈曲理論分析結果對比表明,彈性屈曲和突變失穩分析的結果比非線性屈曲分析的結果要大得多,非線性分析由於考慮了材料非線性和幾何非線性,因而結果與實際接近實際;當只有初期支時,隨著地應力的增加,圍巖的荷載分擔率增大,相應地,初期支的荷載分擔率就減小了;當有初期支和二次襯砌共同作用時,圍巖的荷載分擔率在50以上,這一分擔率隨地應力的增加其變化不大;支和巖體的整體分析表明,襯砌底腳處應力集中嚴重,巖體側墻及墻角圍巖的應力集中也較大。
  6. By adopting the calculating analysis method of elastic - plastic three - dimensional fem numeric simulation, this paper makes a simulation analysis on the structure stability of the shallow cover and unsymmetrically loaded parts in tongyoushan tunnel, mainly simulates the effects caused by different construction orders on surroundings and supporting structure stability, and it centers on the analysis on the weak part, the midwall in the lining of the connecting - arch tunnel

    摘要採用彈塑性三維有限元數值模擬計算分析的方法,對桐油山淺埋、偏壓地段結構穩定性進行了模擬分析,主要模擬了不同施工順序對圍巖及支結構穩定性的影響,重點對連整體襯砌中的薄弱環節中墻進行了分析。
  7. Then we simulate the common excavating methods of double - arc tunnel respectively, analyze the stress and strain of wall rock and support structure of each method, and recommend the best excavating method to construct double - arc tunnel in wall rocks of ii. then we analyze the " three headings method " in detail, and also simulate the effect of construction factor, stress releasing coefficient and secondary lining

    對實際工程中最常用的三種開挖方法分別進行了施工模擬,分析了它們各自的圍巖和支的受力變形規律,經比較后,得出了三導洞法是類圍巖中修建連的較好開挖方法的結論。
  8. Based on the concrete engineering of dunshang double - arch highway tunnel, this paper researches the mechanic properties of double - arch highway tunnel with soft and weak surrounding rocks through on - the - spot arrangement of the test components. with the aid of 2d - program, this paper make a simulated analysis of the whole construction process with three kinds of construction methods and also contrasts with the test results on the spot

    基於軟體平臺2d -對不同施工方法下軟巖雙連公路施工過程各階段圍巖與支體系的力學性狀進行了數值模擬分析,並與實測結果進行對比分析,得出了一些有益的結論,為軟巖雙連公路的設計與施工提供了有效指導。
  9. Analysis of the interaction between primary support and the secend linning of large span and double arch tunnel

    大跨連初期支與二次襯砌相互作用分析