隧道連接點 的英文怎麼說

中文拼音 [suìdàoliánjiēdiǎn]
隧道連接點 英文
junction of tunnel
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 接點 : (接觸點; 連接點) contact; closing; junction; connection point; terminal pad接點電阻 contact resistance
  1. This paper deals with seismic response of a tunnel - soil system immersed tunnel , as an underground structure , must be compatible with the deformation of the surrounding soil thus the simplified model for a tunnel - soil system is established through two steps at the first step , an mdof system is developed for modeling the foundation soil to this end , dynamic behavior of the foundation soil is analyzed a typical section of the foundation soil simplified as a single mass - spring system on the basis of some equivalent criteria those mass are linked longitudinally by elastic springs to form an mdof system at the second step , the tunnel is treated as a beam on elastic foundation ; that is , the tunnel is connected with the soil massed to form a tunnel - soil system this model has been applied to the seismic analysis of huangsha fangcun immersed tunnel across the pearl river in guangzhou design recommendation is proposed on the basis of this analysis

    研究沉管在地震條件下整體受力的分析方法分兩步建立計算模型第一步通過分析場地地基土切片的動力特性,根據等效原則將其化為等效單質體系,然後在縱向用等效彈簧而成為多質體系的地基土計算模型;第二步將看作彈性地基梁與上述多質體系通過等效彈簧結而得到土體系的計算模型本文結合廣州黃沙芳村珠江水下工程實例建立了具體的計算模型並對多種不同的約束條件,進行了縱向與橫向地震響應時程分析,為該的抗震設計提供依據
  2. Then a one - dimensional unsteady incompressible flow with moving pollutant source model was proposed. the continuity equation, momentum equation and convection - diffusion equation were discredited using finite volume scheme. thus a software for predicting the air velocity and pollutant in railway double track tunnels was developed

    著,根據雙線鐵路運營通風的特,建立了一維不可壓縮非恆定流和流動污染源的物理模型以及山相應的續性方程、動量方程和對流擴散方程構成的數學模型;在此基礎上,利用數值計算方法,編制了一套雙線鐵路運營通風的數值計算程序。
  3. Route 3 - starting from sai yun pun and across the harbour via the western harbour crossing to the newly constructed western kowloon highway. it extends further to the north from tsing yi to yuen long via a tunnel through tai lam country park

    三號干線-以西營盤為起,經西區海底西九龍快速公路,再由青衣經過一條貫穿大欖郊野公園的向北伸展至元朗。
  4. Gsns are responsible for the delivery and routing of data packets between the mobile stations and the external packet data networks

    Gprs支持節是建立在基於ip的gprs核心網上,利用gprs協議( gtp )進行通訊。
  5. The contract, valued at $ 2. 8 billion, involves the construction of two parallel tunnels, each of about 5. 2 kilometres, from east rail north of sheung shui under long valley to chau tau

    該合約價值二十八億元,涉及興建兩條並排的,每條長約五二公里,穿越?原,東鐵上水車站以北與洲頭。
  6. The 1. 1 - kilometre east tsing yi viaduct is a dual three - lane viaduct on tsing yi island linking stonecutters bridge and nam wan tunnel

    青衣東高架路全長約一一公里,三線雙程行車,昂船洲大橋和南灣
分享友人