隧道開挖法 的英文怎麼說
中文拼音 [suìdàokāiwāfǎ]
隧道開挖法
英文
tunnel driving method- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 挖 : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
- 法 : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
- 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
-
This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided
故此選用這臺既可在軟土又可在硬石層運作的隧道鉆挖機,避免以明挖隨填的方法開鑿隧道,免卻對交通及環境造成嚴重影響。Drill and blast method of tunnel excavation on hard rock
硬巖地鐵隧道鉆爆法開挖結合盾構法襯砌的施工技術With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places
摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道頂部及拱腰;大部分地段的液化區出現在隧道頂板上方。Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,
根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺車站、三條平行隧道島式站臺車站、三連拱結構島式和側式站臺車站以及四條平行隧道島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well
摘要介紹了官地水電站場內環線道路黑水河溝隧道進口滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上進洞所發揮的作用。In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data
為得出適合本段工程的最佳施工路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crd工法施工的c 、 d部相錯長度進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施工方案的三維有限元動態施工模擬,得出了較優的施工方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣管線的安全性進行了分析,得出了利用此施工方案施工不會造成此處煤氣管線破壞的結論。Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation
摘要針對深圳地鐵淺埋暗挖隧道施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇施工方法、增大左右線隧道開挖面的距離、合理確定開挖進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration, most mrt system routes in metropolitan areas are underground. except for those stations and crossovers where wide ranging areas are involved, the tunnel boring machine is usually applied. conventional tunnel boring was first adopted in 1818 in london, but at that time was only used on a one - line circular tunnel basis
為減少對交通之沖擊及環境之影響,一般于都會區大眾捷運系統之路線劃皆以地下化為主,而整條路線除大面積開挖之地下車站及轉轍段外,其餘皆以潛盾隧道工法作為設計之主要考量。Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved
6公里的雪峰山隧道工程,首先介紹了隧道支護結構的常用分析計算方法;然後通過對隧道施工過程中,洞室穩定性與支護結構相互作用機理的深入分析,建立了隧道施工過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了隧道在不同圍巖特性和圍巖類別條件下,以及不同施工開挖方案等對隧道圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的隧道三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為隧道施工過程中圍巖的穩定性分析開辟了一條新的途徑。The characteristics of stress and displacement in tunnel surrounding rocks are studied. the change feature of the stress in surrounding rocks and the variations of stress and the displacement of prop structure in different excavation step are analyzed with 3 dimensional fem. finally, the construction method is proved to be reasonable and scientific
通過三維有限元計算研究了隧道圍巖的應力、位移特徵,分析了隧道圍巖不同開挖時步的應力變化特點以及支護結構的應力與位移的變化特徵,進而論證了該施工方法的合理性和科學性。Abstract : in order to provide the reasonable parameters in the reliability analysis of tunnel structure and the criterion in the quality control of tunnel engineering, in this paper, the over - under - excavated values of the real - state outline of tunnel excavation are obtained by the near - field photographic method. by using mathematical statistic method, the figure features and probability distributions of the over - under - excavated values of the surrounding rock, including deferent positions of same cross section, are analyzed
文摘:採用近景攝影的方法,從隧道開挖毛洞中獲取圍巖超欠挖數據,通過數理統計的方法,分析各類圍巖超欠挖的數字特徵及概率分佈,同時得出各類圍巖超欠挖在隧道斷面不同部位的分佈規律,為隧道結構的可靠度研究提供可靠參數,也為隧道工程質量控制提供基準( 2 ) if the tunnel is constructed by blasting method, the shock vave from blasting endangers the safety and stabilization of existing tunnel structure
( 2 ) 、對于鄰近隧道礦山法施工,開挖爆破產生的沖擊波會危及既有隧道襯砌結構安全及穩定。Considering the interaction of overlapped shield tunneling, the boundary element method was applied to analyze the ground displacement distribution and interaction between two adjacent tunnels in three typical situations
摘要考慮盾構隧道疊交施工之間的相互影響,應用邊界單元法對相鄰隧道開挖過程中的三種典型疊交位置關系,引起的地層位移場分佈規律及相互影響進行分析。Numerical methods have continued to expand and diversify into all the major fields of scientific and engineering studies including tunneling, mining, and construction of water conservancy facilities and underground structures, and so on
近年來,計算機技術的飛速進步使數值計算方法不斷發展並廣泛應用於科研和工程實踐中,包括隧道開挖、礦業工程、水利工程以及地下工程等。Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated
論文重點闡述了通過縮短測量劃線、鉆眼、裝藥爆破、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用鉆爆法施工充分利用隧道空間,合理配備人力、機械,隧道開挖施工進度得到提高的可行性。The change of energy in wall rock is tracked in the whole process and the amount of energy transferred to linings is also evaluated. 5 ) based on the principal of energy invariance and the energy properties of sfrc, a practical design equation that related the thickness of projecting sfrc to the energy related properties of tunnel is given in the end. this equation is then used to design a single - track railway tunnel in iii grade rock condition
並進一步推導了不同形式的構件間的能量耗散關系,為將標準試驗的能量統計結果運用於實際結構中打下了基礎; 4 )利用有限元軟體對隧道開挖過程進行了三維模擬,得到了隧道圍巖在開挖掘進過程中的能量轉化趨勢和規律,得到了鋼纖維噴射混凝土襯砌在支護過程中的能量變化; 5 )利用能量守恆原理和已經推導出的構件能量耗散關系,建立了鋼纖維噴射混凝土襯砌厚度與圍巖開挖能量變化間的關系,並運用此方法對級圍巖條件中的鐵路單線隧道的鋼纖維噴射混凝土襯砌進行了設計計算;In this paper, based on upwards problems, the monitoring methods and monitoring systems of blast vibration are stated, and the wansongling tunnel blast engineering is taken as the subject investigated, the influence that the blast vibration by this tunnel digging act on the ground buildings and underground construction were monitored, and a great lot monitoring data were obtained, which established the practical base for this paper
基於以上問題,本文簡述了爆破振動的監測方法及監測系統,並以萬松嶺隧道開挖爆破為研究對象,對其施工爆破的爆破振動對地表建築及地下工程施工的影響進行了監測,獲得了大量的監測數據,為論文的研究奠定了實踐基礎。Artificial ground freezing technique that has been used successfully and frequently in shanghai is an economical and reliable method to dig metro tunnels in soft soil
摘要人工凍結施工技術是軟土中地鐵隧道開挖的一種經濟可靠的方法,在上海地區得到了多次成功應用。Application of stochastic medium method to predict the influence degree on ground surface construction due to tunnel excavation
隧道開挖對地表建築物影響的隨機介質分析方法Severe protests from local residents living along mrt routes during the route alignment coordination caused a two - year delay to the proposed schedule for the hsingchuang line. therefore, to reduce the extent of tunneling is a key consideration in the long - term planning of mrt routes. other downsides to the single tunneling method are that it requires longer construction time, and that two break throughs from the tunnel to the work shaft involve a higher construction risk
另因採用單孔潛盾隧道須鉆掘上、下行隧道,除施工時程較長外,且兩次破鏡將增加施工之風險,故有鑒于潛盾機之技術日新月異,國外已有採用多圓形潛盾工法( mf工法)之成功案例,此除可減少用地徵收補償之困擾外,且可減少隧道開挖面積進而減少棄土所造成之問題。分享友人