隨后的冷卻 的英文怎麼說
中文拼音 [suíhòudelěngquè]
隨后的冷卻
英文
cooling after- 隨 : Ⅰ動詞1 (跟; 跟隨) follow 2 (順從) comply with; adapt to 3 (任憑; 由著) let (sb do as he li...
- 的 : 4次方是 The fourth power of 2 is direction
- 冷 : Ⅰ形容詞1 (溫度低; 感覺溫度低) cold:冷水 coldwater; 你冷不冷? do you feel cold?; are you feeling...
- 卻 : Ⅰ動詞1 (後退) step back 2 (使退卻) drive back; repulse 3 (推辭; 拒絕) decline; refuse; reje...
-
Well, by and by the king he gets up and comes forward a little, and works himself up and slobbers out a speech, all full of tears and flapdoodle about its being a sore trial for him and his poor brother to lose the diseased, and to miss seeing diseased alive after the long journey of four thousand mile, but it s a trial that s sweetened and sanctified to us by this dear sympathy and these holy tears, and so he thanks them out of his heart and out of his brother s heart, because out of their mouths they can t, words being too weak and cold, and all that kind of rot and slush, till it was just sickening ; and then he blubbers out a pious goody - goody amen, and turns himself loose and goes to crying fit to bust
隨后國王站了起來,朝前走了幾步,醞釀好了情緒,哭哭啼啼作了一番演說,一邊眼淚直流,一邊胡話連篇,說他和他那可憐的兄弟,從四千英裡外,僕僕風塵趕到這里,卻失掉了親人,連最後一面也未見到,心裏有多難過,只是由於大夥兒的親切慰問和神聖的眼淚,這樣的傷心事也就加上了一種甜蜜的滋味,變成了一件莊嚴的事,他和他兄弟從心底里感謝他們。因為嘴裏說出的話無法表達心意,語言委實太無力太冷淡了。如此等等的一類廢話,聽了叫人要吐。Ill 6. regularity of concrete petrography changing with temperature, standing time, cooling and curing process was studied by x - ray diffraction analysis. microscopic mechanics relative to macroscopic phenomenon after fire was discussed
利用x -射線衍射分析試驗研究了火災高溫后混凝土的巖相隨受火溫度、靜置時間、冷卻及養護方式的變化規律,探討了火災后混凝土產生宏觀現象的微觀機理。The welding technology of francis turbine runners is optimized from the view of subsection welding and local heating by numerical simulation. the result shows that welding residual tensile stress appears in the weld and its area nearby, and peak stress appears in the dangerous area of blades after practising quondam welding technology ; welding residual tensile peak stress in the dangerous area of blades can be decreased by welding both ends earlier and then welding middle section later during subsection welding, and decreasing effect on welding residual stress of the subsection welding is related to the weld length of blade outlets and welding direction of each subsection ; decreasing effect on residual stress of the local heating is direct proportional to heating time, heating temperature, heating area, and inversely proportional to cooling area, and welding residual tensile peak stress in the dangerous area is decreasing trend earlier, and then increasing trend later with heated location increased
本文利用數值模擬手段對轉輪的焊接工藝從分段焊和局部加熱兩個方面進行了優化,結果表明:採用普通工藝焊接時,葉片焊后殘余拉應力出現在焊縫及其附近區域,並且在葉片出水邊的熔合線附近(危險區域)出現了峰值;在採用優化的分段焊時,先焊兩端后焊中間的方法可以降低葉片危險區域的焊接殘余拉應力峰值,降低效果與葉片出水邊焊段長度、焊縫各段的焊接方向有關;局部加熱法降低轉輪危險區域殘余應力的效果主要與加熱時間、加熱溫度以及加熱面積成正比,與冷卻面積成反比,並且危險區域的殘余應力隨加熱區域的增大呈先降低后升高的趨勢。The thermal visualizations of jet impingement cooling with single or double row holes inside semi - enclosed channel are measured by using infrared camera and then the impingement cooling heat transfer coefficients are deduced. the effects of flow and geometry parameters on convective heat coefficients are obtained. the results show that : for a single row normal impingement, the impingement cooling effectiveness is enhanced with the increase of impinging reynolds number or the decrease of hole space to diameter ratio, and the best effectiveness is achieved under the jet - to - surface spacing equals to 2 ; when the jet is oblique to the confined wall, the cooling effectiveness is weaken especially under the jet - to - surface spacing ratio is greater than 2 ; for double rows normal impingement cooling, the cooling effectiveness of rear row jet is weaker than the front row under lower impinging reynolds number or bigger jet - to - surface spacing
對于單排垂直射流,沖擊冷卻效果隨射流雷諾數的增加、孔間距與直徑比的減小而得到提高,沖擊間距比為2時換熱效果最好;沖擊孔中心線向通道封閉一側傾斜后,射流沖擊冷卻的范圍變窄,當沖擊間距比大於2時駐點區的對流換熱能力明顯降低;對于雙排沖擊射流,孔排間距與直徑比的增加使沖擊冷卻范圍變大,但在兩排孔之間區域的對流換熱系數有所下降;在較小的沖擊射流雷諾數和較大的沖擊間距比下,後排射流的沖擊換熱效果要遜於前排射流。The results show that it is an effective method for acquiring better electrical properties that the pressed bodies were sintered at 1150 in furnace with the temperature raised dilatorily, heat preserved for 2. 5 hours and furnace cooled to room temperature
研究結果表明,氧化鋅壓敏閥片的最佳燒成制度為:隨爐連續緩慢升溫至1150進行燒結,保溫2 . 5小時后,隨爐緩慢冷卻。Mix the ginger and soy sauce and baste the chicken breasts, then bake them in a preheated oven, 190, gas 5, for 15 - 20 minutes. let cool, then slice very finely
將薑末和老抽混合,抹于雞脯浸漬,然後放入已預熱的烤箱內烘烤,溫度190 ,煤氣5擋,烤15 20分鐘,隨后拿出冷卻,切成薄片。We consider that the complexes of bmon ( m, n > 1 ) or the point defects induced by heavily boron doping may be involved in the nucleation of oxygen precipitates at high temperature range of crystal cooling. therefore it is reasonably deduced that the density of voids in hb cz silicon increases and the size of voids decreases due to the reduction of vacancy concentration as a result of heavy boron - doping enhanced oxygen precipitation prior to the void formation
在實驗事實的基礎上,我們認為在重摻硼硅單晶生長過程中, bmon ( m , n 1 )復合體或摻b引起的點缺陷能在晶體冷卻過程中的較高溫度階段形成,且在隨后的退火過程中能穩定存在,作為氧沉澱形核的核心,從而促進了氧沉澱,減小了大直徑硅單晶中void缺陷的尺寸,增加其密度。The curing of the magnets always in the vacuum circumstance. as far as the mixture cohesion is concerned, the optimized curing temperature and time are 120 and 120min
所用粘結劑合適的固化溫度是120 ,合適的固化時間是120min ,固化后磁體應該隨爐冷卻。7. regularity of microscopic pattern in concrete after fire changing with temperature, standing time, cooling and curing process was studied by stereoscan test. it was summarized to predict temperature in fire based on microscopic structure subject to fire
利用掃描電鏡分析試驗研究了火災高溫后混凝土內部的微觀形貌隨受火溫度、靜置時間、冷卻及養護方式的變化規律,歸納了通過高溫后混凝土的顯微結構特徵推定火災溫度的方法。When the welding current is added, the quality of heat of the arc will increase, so both the volume of molten puddle and the depth of arc crater will all increase, and the weld depth will increase when the weld is cooling
焊接電流增加時,電弧的熱量增加,因此熔池體積和弧坑深度都隨電流增加,所以冷卻下來后,焊縫厚度就增加。3. regularity of some mechanics index such as compressive strength, constitutive relationship of stress to strain and modulus changing with temperature, standing time, cooling and curing process after cool were studied by test. corresponding regressive equation was obtained with large quantity of data
試驗研究了火災高溫后考慮靜置時間影響的混凝土抗壓強度、應力-應變本構關系及彈性模量等力學性能指標隨混凝土受火溫度、靜置時間、冷卻和冷卻后的養護方式的變化規律,通過對大量試驗數據的處理,給出了相應的擬合回歸公式。分享友人