電站出力 的英文怎麼說

中文拼音 [diànzhànchū]
電站出力 英文
output of power station
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 電站 : power station電站船 generating ship
  1. In this paper, 3d nonlinear finite element model is used to analyze the stability of side slope of baise hydraulic power plant ' s tail channel, and the result to be given for consulting

    本文主要應用三維非線性有限元對百色水尾水渠高邊坡進行靜、動穩定性分析,並對結果進行分析,給供工程設計的參考意見。
  2. The way of taking one nth out of capacitor ' s the first harmonic capacitive reactance as its nth harmonic impedance is verified whit the data from tang7c. according to the approximately estimating method, the first harmonic impedance of 220kv system is calculated. on the basis of the models, this paper gives the harmonic equivalent circuit of substation and gives the b ( n ) function of the harmonic time n. when the capacitors has different combination, b ( n ) ' s value will also change, with the inputting local measurement data, the paper studies the series and parallel resonance at the substation, and deduces that the reason the capacitor ' s fuse of tang6c is frequently interrupted is that its capacitor current contains a large number of 5th harmonics, and that the reason the discharging pt of tang7c capacitor being exploded is also that the 7th and 9th harmonic currents are amplified

    據此,對該進行了串聯諧振分析和並聯諧振分析,並結合測試數據和有關變的運行記錄,指了導致該容器湯6c頻繁燒保險的主要原因是5次諧波流含量偏高,引起湯7c放pt爆炸也是因為7次和9次諧波流被放大。針對這些導致湯陰變補償容器故障的原因,提了相應的諧波治理措施,包括針對湯6c容器5次諧波流含量偏高的原因,提了停運湯6c容器或者通過把湯sc容器的部分容量併入湯6c容器(湯sc其餘部分停運)以增加湯6c諧波承受能的措施;針對# 2變低壓側7次和9次諧波流被放大的現象,提了在湯7c容器上加裝一定百分比的串聯抗器的措施。
  3. Along with the implementation of experiment of straight power supply to big consumer step by step, as the largest rundle hydropower station in our country, we must consider straight power supply to big consumer ( a new electric power marketing ) with the electric power of gezhouba - three gorges as an important composed part of electric power marketing, let it become to one of the important means of gaining the more benefits to our company

    直供作為一種新的營銷模式,隨著大用戶直供試點工作的逐步展開,作為我國最大的梯級,必須把三峽?葛洲壩的直供作為營銷的有機組成部分,作為實現公司效益最大化的重要手段之一。論文在分析了三峽區域潛在的直供對象后,提了三峽過網直供和專線直供的思路。
  4. The office and clp power present a permanent exhibition at the so kwun wat station to illustrate the archaeological work and discoveries in the site. replicas of artefacts ranging from neolithic period to ming dynasty are also displayed. it is hoped that through this exhibition public understanding of local archaeological work and heritage could be enhanced

    辦事處與中華于掃管笏變設置長期展覽,介紹是次發掘工作及重要發現,並展新石器時代至明代的土文物仿製品,希望藉此提高市民對本地考古工作及文物的認識。
  5. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構架鋼結構的特殊形式,研究並提鍋爐鋼結構改造加固研究方法,及動分析的具體步驟:建立了鍋爐鋼結構動分析模型、地震荷載分析方法、建立了鍋爐鋼結構布置型式、及整個鍋爐鋼構架抗側體系模擬分析方法。具體包括:鋼構架本體及構架上荷載、地震載荷與阻尼系數確定、制晃裝置確定、吊桿與大板梁簡化。
  6. In the second place, based on the asu of buggenum igcc plant in netherlands, both static and dynamical model for distillation tower of the asu are created and some valuable conclusions are gained as well. finally, a compartmental simplified model is created for distillation tower of the asu, in order to reduce the simulation time and increase the simulation efficiency. the new model will be helpful to the further simulation and on - line optimal control for the asu of the igcc plant

    其次,本文以荷蘭buggenum的空分系統為原型,基於matlab建立了空分系統精餾塔的半圖形化動、靜態數學模型,並通過模擬,得了一些有價值的結論:當空分系統的壓變化時,氧氣產品濃度的響應時間常數為兩小時左右,說明空分系統是igcc最大延遲環節;而且雖然氧氣濃度最後會穩定在igcc所要求的范圍之內,但在過渡過程中會超限制,這些都為igcc的安全運行及控制系統設計提供了有價值的信息。
  7. Foreign electricity sales , which are from the cahora bassa hydroelectric plant , increased by 80 percent in the period , the report said

    報告稱,此期間的口增長80 % .來自卡布拉?巴薩水
  8. This paper draws lessons from the design experiences of domestic large scale power station which uses gis technology and combines with the 330kv gis design of the gong bo xia and li jia xia power station that are designed the northwest investigation design and research institute. this paper not only advances some common questions about gis such as selecting model and demonstrating, compiling technology standardization of the device, layout and design, test, enviromental protection and maintenance, etc, but also supplies effective solution commonly used in engineering

    本論文借鑒國內採用gis技術的大型的設計經驗,結合國家公司西北勘測設計研究院承擔的公伯峽、李家峽330kvgis設計,提gis在選型論證、設備技術規范書編寫、布置設計、試驗、環保維護等方面的常見問題,並提供在工程應用中較常用的有效的解決措施。
  9. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川網的二灘水和500kv輸變系統投入運行后,由於二灘水的大量遠距離輸送至負荷中心,迫使負荷中心的火機組在豐水期大量停機,使負荷中心失去壓支撐,大大降低了網的壓穩定水平;同時,因為四川網中的無功補償裝置全為靜態無功補償容器(或抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和壓支撐的作用,而在現事故時,不但不能起到壓支撐作用,反而會促使壓崩潰事故的發生。
  10. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  11. Firstly, the thesis briefly reviews the history of voltage and reactive power control technology, focusing on the defects of the equipment in use. then, with the theoretical analysis and the discussion on voltage and the characteristic of power system as well as the basic principle of voltage and reactive power control, the thesis makes a research on the character of voltage and reactive power control and interprets the controlling regularity of substation. in addition, with the consideration of the changes of transformer tips and the combined influence of capacity groups and reactive power and voltage, the thesis makes adjustment suggestion to the different operating - zones of voltage and reactive power

    本文從降低網損和提高變自動化水平著眼,對變壓無功控制應用方面的問題進行了研究,本文首先簡要回顧壓無功控制的發展概況,著重指了現有壓無功控制裝置的缺陷;通過理論分析,在討論系統壓、無功調節特點以及壓無功總體控制原則的基礎上討論了變壓、無功控制特性以及控制原理,給了變壓無功的控制規律;考慮了變壓器分接頭的變化及容器組的投切對無功和壓的綜合影響,針對壓、無功的各種運行控制區域給了相應調節策略。
  12. The thesis analyzed the principle of “ hp inlet pressure control ” and the application, which based on the analysis of daya bay and lingao turbine control system ( gre ), in addition, the problems and the way to prevent during the normal operation also be concerned in this article

    本文詳細分析了大亞灣核和嶺澳核汽輪機的壓控制的原理及實現方式,並結合應用案例,分析了設計及實際應用中容易現的問題,以及避免這些問題的對策。
  13. Based on the establishment of the mathematical model of the water - level controlling system, the boundary control equation of the stable domain of the continuous system and discrete system are found respectively, and the characteristic of stable domain of the two systems is analysed

    其目的是維持前池水位穩定,提高機組單位流量,最大限度利用來水,從而提高的經濟效益。在建立水位調節模式下調節系統數學模型基礎之上,對連續、離散系統進行了穩定分析。
  14. The inner - plant economical operation of lijiaxia hydropower station is studied based on the disadvantageous operating mode area of the units determined by school of civil engineering of tianjin university and the actual operating experience of the lijiaxia hydropower station in the last a few years

    摘要以天津大學建築工程學院確定的李家峽水機組的不利工況區為依據,以近幾年來該水的實際運行經驗為參考,在綜合考慮機組初始運行狀態、機組振動特性、機組、下泄流量、水庫蓄水量和網負荷平衡等因素的基礎上對李家峽水的廠內經濟運行進行了研究。
  15. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式水輪機的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算ms的軸向水推與模型試驗值大小相當;同時論證了對于下機架承重的混流式水輪發機組可採用其推軸承負荷作為水廠房振動的最大垂直激振荷載。
  16. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態規劃方法中把水庫的整個調度期,按句劃分為t個時段,以水庫的蓄水量s或蓄水位z和入庫水量q作為狀態變量,以水庫放水量q或電站出力n或發量e作為決策變量,構成一個多階段決策過程,當計劃調度期內各時段的入庫徑流量已知或可以預報,即入庫徑流過程可以採用確定性徑流過程時,分別按缺水量d最小作為目標函數建立多階段確定性動態規劃數學模型。
  17. It satisfies the requirements of china standard ( gb / t 14549 - 93 ), the harmonic and negative sequence component leaded by the input of electrified railways traction load are measured in si yan qiao substation. this thesis mainly analyzes the effects on the electric elements, feeding system losses, protection system and automatic device, and proposes corresponding schemes according to the problems occurring in si yan qiao substation

    本文實測了瀘州石燕橋變氣化鐵路牽引負荷注入網的諧波和負序分量,著重分析了系統中氣設備、供網線損、繼保護和自動裝置受氣化鐵路諧波和負序的影響,並針對石燕橋變現的問題提了對策。
  18. So, changing the material property of slrcp to decrease the crack width or to avoid the crack to happen is a good method. this method can keep the advantage of slrcp, and at the same time avoid its disadvantage. so, two new slrcp. is presented : steel lined steel fiber reinforced concrete penstock ( slsfrcp ), steel lined steel fiber self - stress reinforced concrete penstock ( slsfsrcp )

    基於此思路,提了兩種改性鋼襯鋼筋混凝土壓管道:即鋼襯鋼筋鋼纖維混凝土壓管道、鋼材鋼筋鋼纖維自應混凝土壓管道,並進行了以下開創性的研究: l以三峽管道為原型,按相似比1 : 10製作完成了常規鋼襯鋼筋混凝土壓管道、改性鋼材鋼筋混凝土壓管道模型。
  19. Analyzing the main mathematical models and computation methods of hydro - mechanical transient, characteristics and commonness of the mathematical models of water conveying are discussed, and characteristics of the graphical interfaces based - automatic model constructing software such as generality, modifiability, user friendly interface are proposed. 2

    在分析水?機械過渡過程的主要數學模型和計算方法的基礎上,研究了有壓引水系統數學模型的特點和共性,提了擬開發的具有圖形界面自動建模軟體,該軟體具有通用性強、易校對性、易修改性、界面友好等特點和要求。
  20. Study of stability of the exit trench slope in gongboxia hydropower station

    公伯峽水口明渠邊坡穩定性的學分析與防治研究
分享友人