電站布置 的英文怎麼說

中文拼音 [diànzhànzhì]
電站布置 英文
layout of power station
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 電站 : power station電站船 generating ship
  1. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游洪水位變幅較大等環境條件下,貫流式水副廠房設自然通風採光天井的空間條件及其技術性和經濟性,討論了天井原則和空間尺度與形態處理,給出設計實例並初步評價了天井通風採光的效果。
  2. Abstract for the foursquare - distribution direct current firing implement, the distributing evenness of its air quantity and powdered coal quantity is very important to the safe and economical operation of power plant boiler

    鍋爐的運行中,對於四角的直流燃燒器,其風量和煤粉量分配的均勻性對鍋爐安全和經濟運行有著重要意義。
  3. The tailrace surge chamber shared by two units, common in hydropower stations with diversion systems, has problems of water level fluctuation and hydraulic disturbance

    摘要雙機共尾水調壓室是水引水發系統中一種常見的形式,存在尾水調壓室水位波動和水力干擾問題。
  4. Abstract : a research on theory and practice is conducted on the acoustic methods of discharge measurement in low head hydropower plant. taken hydraulic efficiency experiment in certain hydropower plant as examples, the general methods about how to locate the discharge measurement plane, install transducers and choose the integration methods are put forward. an improvement method is proposed finally

    文摘:從理論上和實踐上,對低水頭超聲波測流進行了較為詳細的研究,並以某水為例,對測流斷面定位、聲路和面積積分給出了一般方法
  5. The effect factors of boiler steel frame are analyzed, loads composition and structural distribution, also the design code and special value norm for load classification are discussed, mainly including state and live loads, wind and level earthquake

    分析了鍋爐鋼結構的荷載影響因素,提出合理的結構和荷載取值及其工況組合。分析了設計標準中的荷載分類及取值約定。
  6. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構架鋼結構的特殊形式,研究並提出了鍋爐鋼結構改造加固研究方法,及動力分析的具體步驟:建立了鍋爐鋼結構動力分析模型、地震荷載分析方法、建立了鍋爐鋼結構型式、及整個鍋爐鋼構架抗側力體系模擬分析方法。具體包括:鋼構架本體及構架上荷載、地震載荷與阻尼系數確定、制晃裝確定、吊桿與大板梁簡化。
  7. This paper draws lessons from the design experiences of domestic large scale power station which uses gis technology and combines with the 330kv gis design of the gong bo xia and li jia xia power station that are designed the northwest investigation design and research institute. this paper not only advances some common questions about gis such as selecting model and demonstrating, compiling technology standardization of the device, layout and design, test, enviromental protection and maintenance, etc, but also supplies effective solution commonly used in engineering

    本論文借鑒國內採用gis技術的大型的設計經驗,結合國家力公司西北勘測設計研究院承擔的公伯峽、李家峽330kvgis設計,提出gis在選型論證、設備技術規范書編寫、設計、試驗、環保維護等方面的常見問題,並提供在工程應用中較常用的有效的解決措施。
  8. The arrangement is applicable to the hydropower station with higher head or flow rate and has the advantages such as saving investment, flexible operation and simple electric installations ; which provides an another way with another alternative for hydropower station to select the hydro - generating facilities

    這種方式可適用於水頭或流量變化較大的水,具有節省投資、運行靈活、氣設備簡化等優點,為水水輪發機組設備的選擇提供了另一條途徑,增加了一個對比方案。
  9. The structure arrangement of the intake tower for the underground hydropower station of baise project is suit to the complex topography and geology condition, and the hydraulic test shown that the flow pattern entering the tower is well

    百色水利樞紐地下水進水塔結構,較好地適應了地基復雜的地形地質條件,水流流態良好。
  10. According to the features of local substation, such as large - scale network and points, scatter distribution, old - fashioned equipment, much information and complex communication network, it has great economic benefit to search for a kind of comprehensive automation equipment which has less investment, higher efficient and convenient and reliable character, at the same time, the equipment should adapt to the environment of local substation

    根據小區變所網點多、局分散、設備陳舊、信息量大、通信網路復雜的特點,尋求一種投資少、見效快、方便可靠的適合小區變所的綜合自動化設備就具有十分巨大的經濟效益。本文介紹了「配自動化及其裝? ?網路儀表」的設計方案。
  11. Space arrangement of basement trench commonly shared by m amp; amp; e ducts and new supporting stand application in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期航區工程地下室共同溝機系統管線空間及新型支架的應用
  12. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發機組的科學研究。
  13. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發機組的科學研究。
  14. Longtan hydropower station dafaping aggregates preparation system layout

    龍灘水大法坪砂石加工系統的
  15. The position of the line and station influences the traffic of the city, which in return also influences the safety and profit of lrt

    介紹了有軌車車、線路形式,從行人交通組織、乘客交通組織、路口交通組織、路段交通組織等方面對有軌車的交通組織設計進行研討。
  16. In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit

    摘要針對向家壩水特殊的自然條件和工程特點,其施工導流經過對多個方案進行比較,從施工、後期度汛、施工期通航、發工期等方面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導流方案。
  17. Based on the model experiments, the way how to manage the multi - outlet sluice lock was provided. above all, this hydraulic structure is both efficient and economic than traditional dissipater for the projects of low head & low fr current, it will reserve the abroad practice

    本文認為低鼻坎消力戽和傳統消力戽的適用條件有很大的區別,前者完全可以在和船閘且地質條件較差的工程中被採用。
  18. The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head

    蓄水位選擇、壩址選擇、樞紐、建築物設計優化、施工導流與工期等是低水頭河床式設計的重要內容。
  19. Taking the city ' s roads system into consideration, this paper argues that the position of the lrt shall be determined according to the situation of the passenger flow, the station distribution, the scale and the type of the station, the situation of the transportation of the city, as to optimize the synthetic transportation system of the city

    在設計過程中,首先要根據城市道路網規劃,深入研究、合理確定有軌車的線路走向及其在道路斷面中的位,結合沿線客流情況確定車分佈、原則,選擇車及結構形式。
  20. According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion

    根據福堂工程設計的結構情況、地質參數及滲流計算成果,對閘室和擋水壩穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。
分享友人