電站裝機容量 的英文怎麼說

中文拼音 [diànzhànzhuāngróngliáng]
電站裝機容量 英文
installed capacity of power station
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : machineengine
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 電站 : power station電站船 generating ship
  • 裝機 : airloading
  1. Static benefits are generated from peaking and valley - filling, which are further divided into capacity benefits and coal saving benefits. dynamic benefits come from its fast starting and flexible operation, including frequency regulation, synchronous condenser operation, fast coverage of steep load gradient and synchronous spinning reserve. as for the calculation of static benefits of pumped storage plant, the alternative coefficient method is normally adopted at present

    目前在抽水蓄能的靜態效益計算中,一般採用替代系數法,即用抽水蓄能乘以替代系數( 1 . 05 1 . 1 )計算抽水蓄能的替代;用抽水蓄能的發乘以替代系數( 1 . 05 )計算替代的發,再根據循環效率的大小計算抽水蓄能的燃料消耗。
  2. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川網的二灘水和500kv輸變系統投入運行后,由於二灘水的大力遠距離輸送至負荷中心,迫使負荷中心的火組在豐水期大,使負荷中心失去壓支撐,大大降低了網的壓穩定水平;同時,因為四川網中的無功補償置全為靜態無功補償器(或抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和壓支撐的作用,而在網出現事故時,不但不能起到壓支撐作用,反而會促使壓崩潰事故的發生。
  3. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水,最大擬建壩高260m ,560萬千瓦,屬特大型水工程。
  4. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步變頻調速技術的發展概況,在回顧梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用蓄能器的液壓梯變頻節能控制系統研究」的基本原理,分析了動力系統在梯轎廂輕載上下行、重載上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液壓動力泵的結構設計和參數設計,重點研究了液壓動力泵的結構設計、液壓泵馬達可逆性問題及其選型設計計算、蓄能器迴路泄漏油損失理的研究及其補償置的設計、蓄能器-泵馬達壓力能轉換置的設計、多功能集成控制閥組的設計等內;最後簡單介紹了本課題矢控制變頻控制櫃的外部附件氣接線、計算控制及數據採集系統的硬體設計等內
  5. When was this power station built ? how about its installed capacity

    這個是什麼時候建的?是多少?
  6. The developed resource is 82, 200 kw, the investors for 10 designed hydropower stations have not yet to be practicable

    已開發建成8 . 22萬千瓦,規劃未落實業主的有10座。
  7. The state invests 600 million yuan in this project, which is scheduled to start operation with an installed capacity of 90, 000 kilowatts in 1995

    國家為這一工程投資6億元,9萬千瓦,預計到1995年並網發
  8. One side, groovy cast steel flap valves increase the head loss, waste electricity, the other side, when flap valves close, it always delay time because of it ' s low proportion. the bump load seriously threaten the safety of pumping station. through the research and development of flap valve used in the renovation practices in the design of air - filled floating flap valve in no. 1 chuhe pumping station of anhui province, the working characteristics and design methods of air - filled floating flap valve are studied in this paper

    但在拍門運行使用的同時,又時常暴露出一些缺陷,主要有:一是常規的鑄鐵或鑄鋼拍門加大了流道的水頭損失,特別是對于較大的排澇泵,其能損耗相當可觀;二是拍門在自重下下落關閉時,往往由於過多考慮水頭損失導致浮重過小而延誤閉門時間,致使水體倒灌,再因緩沖置失靈導致閉門時門體對門框撞擊力很大,嚴重危及身安全。
  9. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘水工程規模論證,簡述該工程正常蓄水位選擇和選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘水工程規模設計論證總結類似工程規模論證時的主要技術要點。
  10. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水的最下游一級水252mw ,總庫4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
  11. In this article, a 74500dwt bulk carrier being built in our shipyard is taken for example. based on the calculations for the capacity required, two generator sets and a shaft generator are arranged for the power station on this ships. analyses are made on different units of each generator set, and some reliability tests have been carried out at the same time

    本文通過對工廠建造的74500t散貨輪的計算,配置了兩臺柴油發組,並在主的後部中間軸上安了一臺軸帶發,並對各發組的各個環節進行分析,進行必要的可靠性試驗,並確定運行過程中的維修方案,從而確保船舶的正常可靠運行,而簡單的操作方法、簡便的維修、運行的低消耗,體現了該船舶的實用性。
  12. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣水位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,420萬千瓦,屬特大型水工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖高度達80m ,開挖對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水工程建設的順利進行。
  13. Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities

    瀾滄江糯扎渡水擬建壩高261 . 5m ,5850mw ,採用左岸地下發系統,由主廠房、主變室、尾水調壓室以及尾水洞等構成龐大而復雜的地下洞室群。
  14. The ratio of ma added to the mox fuel is studied. the neutronics characteristics of ma transmutation, and the transmutation and burning efficiency of the modular fast reactor are calculated. the role of the modular fast reactor to buffer the growing of ma in china and the reduction of radiotoxicity of nuclear waster via multiple recycling of ma in the modular fast reactor are calculated

    主要論述隨著我國壓水堆核電站裝機容量和運行堆年的增加,乏燃料中ma總增長趨勢;模塊快堆的堆芯概念設計方案;在不改變模塊快堆堆芯設計的前提下, mox燃料中添加ma和稀土核素對堆芯中子學性能的影響以及模塊快堆的嬗變效率;模塊快堆對減少我國ma總的作用;模塊快堆產生的最終核廢物的長期放射性毒性隨時間的變化等。
  15. Letan hydropower station, with a total installed capacity of 600 mw and a total investment of 4. 024 billion yuan, is one of the important electric supply project in guangxi in the period of the tenth five - year plan in china

    摘要樂灘水工程是國家「十五」期間在廣西投產的重要源建設項目之一,工程總投資40 . 24億元,600mw 。
  16. Water power resource is the most in the coastal area of fujian province, theory contain is 260, 000 kw, 174, 000 kw of which is available for development, among them 155, 700 kw are able to set up single hydropower station with 100 kw or more, the annual amount of generate electric power is 0. 652 billion kwh

    水力資源居福建省沿海縣區之最,理論蘊藏達26萬千瓦,可開發的17 . 4萬千瓦,其中單100千瓦以上約15 . 57萬千瓦,年均發6 . 52億千瓦時。
  17. Baihetan hydroelectric power station of jinsha river is another planned giant project after three gorges and xiluodu water c onservancy p roject i n c hina

    金沙江白鶴灘水是我國繼三峽、溪洛渡之後開展前期工作的又一座巨型。最大壩高275m ,12000mw 。
分享友人